# | Standard Interpretations |
---|---|
1 | - 1910.119(d)(3)(iii) - Determination of safety for existing process equipment is required prior to start-up. |
2 | - 1910.119(d)(3)(iii) - Recalculating pressure vessel design; codes "no longer in use." |
# | Standard Interpretations |
---|---|
1 | - 1910.119(d)(3)(iii) - Determination of safety for existing process equipment is required prior to start-up. |
2 | - 1910.119(d)(3)(iii) - Recalculating pressure vessel design; codes "no longer in use." |