# | Standard Interpretations |
---|---|
1 | - 1910.147(c)(6)(i)(D) - Lock out/Tag out periodic inspection requirements. |
2 | - 1910.147(c)(6)(i)(C) - Lock out/Tag out periodic inspection requirements. |
3 | - 1910.147(c)(6)(i)(B) - Lock out/Tag out periodic inspection requirements. |
4 | - 1910.147(c)(6)(i), 1910.147(c)(6)(i)(B), 1910.147(c)(6)(i)(C), 1910.147(c)(6)(i)(D) - Lock out/Tag out periodic inspection requirements. |