# Standard Interpretations
1 - 1910.147(c)(6)(i)(D) - Lock out/Tag out periodic inspection requirements.
2 - 1910.147(c)(6)(i)(C) - Lock out/Tag out periodic inspection requirements.
3 - 1910.147(c)(6)(i)(B) - Lock out/Tag out periodic inspection requirements.
4 - 1910.147(c)(6)(i), 1910.147(c)(6)(i)(B), 1910.147(c)(6)(i)(C), 1910.147(c)(6)(i)(D) - Lock out/Tag out periodic inspection requirements.