# Federal Register
1 - 1910.147(d)(4)(i) - 84:22756-22762 - The Control of Hazardous Energy (Lockout/Tagout) - PDF
2 - 1910.147(d)(4)(i) - 81:20680-20688 - Nucor Steel Connecticut Incorporated; Grant of a Permanent Variance - PDF
3 - 1910.147(d)(4)(i) - 80:75472-75480 - Nucor Steel Connecticut Incorporated; Application for Permanent Variance and Interim Order; Grant of Interim Order; Request for Comments - PDF
# Regulations
1 - - The control of hazardous energy (lockout/tagout).
# Standard Interpretations
1 - 1910.147(d)(4)(i) - Clarification of "authorized" and "affected" employees and proper energy control procedures.
# Settlement Agreement
1 - - Corporate-Wide Settlement Agreement - Republic Steel, f/k/a Republic Engineered Products, Inc. - 03/22/2012