# Standard Interpretations
1 - 1910.269(l)(1) - Clarification on number of qualified employees required when working with electrical components.
2 - 1910.269(l)(1)(i) - Clarification of the 1910.269 requirement for the presence of at least two "qualified" employees for work on exposed energized lines.
3 - 1910.269(l)(1) - Qualifications required under 1910.269 for entry into manholes/vaults to perform work on energized conductors.
4 - 1910.269(l)(1)(ii) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part.
5 - 1910.269(l)(1)(i) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part.
6 - 1910.269(l)(1) - Determining voltage ratings for electrical insulating equipment used during electrical power distribution and transmission work.
7 - 1910.269(l)(1)(ii) - Minimum number of employees required for performing electric power work conducted from bucket trucks.
8 - 1910.269(l)(1)(i) - Minimum number of employees required for performing electric power work conducted from bucket trucks.
9 - 1910.269(l)(1)(i) - Clarification of qualified employee requirements for the Electric Power Generation, Transmission, and Distribution standard.
10 - 1910.269(l)(1)(ii) - Two employees must be present during work on energized systems >600 volts
11 - 1910.269(l)(1)(i) - Two employees must be present during work on energized systems >600 volts
12 - 1910.269(l)(1) - CPR/first aid training and "working alone" provisions of 1910.269