08/16/2023 - 1910.269(l)(5)(ii) - Minimum approach distance (MAD)
2
10/02/2015
- 1910.269(l), 1910.269(l)(3) -
Minimum approach distances to electric power transmission and distribution lines during the installation of protective grounds
3
08/16/2023 - 1910.269(l)(3)(iii) - Minimum approach distance (MAD)
4
05/03/2021 - 1910.269(l)(3) - Minimum approach distance (MAD) requirements covered under 1910.269 when installing protective grounding equipment
5
12/22/2016 - 1910.269(l)(3) - Enforcement of minimum approach distance requirements in 29 CFR 1910.269 and 29 CFR Part 1926, Subpart V
6
01/20/2016 - 1910.269(l)(3)(ii) - Extended enforcement dates for minimum approach distances to electrical power lines
7
01/20/2016 - 1910.269(l)(3)(i) - Extended enforcement dates for minimum approach distances to electrical power lines
8
10/02/2015 - 1910.269(l)(8) - Heat energy estimates for arc-rated protective clothing and faceshields for open-air work on multi-phase overhead power lines.
9
10/02/2015 - 1910.269(l)(3) - Minimum approach distances to electric power transmission and distribution lines during the installation of protective grounds
10
10/02/2015
- 1910.269(l), 1910.269(l)(8) -
Heat energy estimates for arc-rated protective clothing and faceshields for open-air work on multi-phase overhead power lines.
11
07/13/2015 - 1910.269(l)(8) - Requirements for protective clothing and equipment in the Electric Power Generation, Transmission and Distribution Standard.
12
07/13/2015 - 1910.269(l)(8)(v) - Selecting protective clothing based on the IEEE National Electrical Safety Code, C-2, 2012, Table 410-1
13
07/13/2015 - 1910.269(l)(8)(ii) - Selecting protective clothing based on the IEEE National Electrical Safety Code, C-2, 2012, Table 410-1
14
07/13/2015 - 1910.269(l)(8) - Selecting protective clothing based on the IEEE National Electrical Safety Code, C-2, 2012, Table 410-1
15
07/13/2015
- 1910.269(l), 1910.269(l)(8) -
Requirements for protective clothing and equipment in the Electric Power Generation, Transmission and Distribution Standard.
16
02/03/2010 - 1910.269(l)(2) - Clarification on number of qualified employees required when working with electrical components.
17
02/03/2010 - 1910.269(l)(1) - Clarification on number of qualified employees required when working with electrical components.
18
10/10/2007 - 1910.269(l)(1)(i) - Clarification of the 1910.269 requirement for the presence of at least two "qualified" employees for work on exposed energized lines.
19
11/21/2006 - 1910.269(l)(2) - Qualifications required under 1910.269 for entry into manholes/vaults to perform work on energized conductors.
20
11/21/2006 - 1910.269(l)(1) - Qualifications required under 1910.269 for entry into manholes/vaults to perform work on energized conductors.
21
10/19/2006 - 1910.269(l)(2) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part.
22
10/19/2006 - 1910.269(l)(1)(ii) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part.
23
10/19/2006 - 1910.269(l)(3) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part.
24
10/19/2006 - 1910.269(l)(1)(i) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part.
25
10/04/2006 - 1910.269(l)(6)(iii) - Requirements for embroidery on flame-resistant clothing under 29 CFR 1910.269.
26
09/01/2006 - 1910.269(l)(3)(ii) - Conditions allowing the use of insulating gloves without the use of insulating sleeves when working on or near exposed energized parts.
27
09/01/2006 - 1910.269(l)(3)(i) - Conditions allowing the use of insulating gloves without the use of insulating sleeves when working on or near exposed energized parts.
28
09/01/2006 - 1910.269(l)(3) - Conditions allowing the use of insulating gloves without the use of insulating sleeves when working on or near exposed energized parts.
29
09/01/2006 - 1910.269(l)(2)(i) - Conditions allowing the use of insulating gloves without the use of insulating sleeves when working on or near exposed energized parts.
30
09/01/2006
- 1910.269(l), 1910.269(l)(2)(i), 1910.269(l)(3), 1910.269(l)(3)(i), 1910.269(l)(3)(ii) -
Conditions allowing the use of insulating gloves without the use of insulating sleeves when working on or near exposed energized parts.
31
04/25/2006 - 1910.269(l)(3) - Conditions rendering underground electrical power connections as unsafe to touch with bare hands.
32
04/25/2006 - 1910.269(l)(2) - Conditions rendering underground electrical power connections as unsafe to touch with bare hands.
33
09/27/2005 - 1910.269(l)(4) - Determining voltage ratings for electrical insulating equipment used during electrical power distribution and transmission work.
34
09/27/2005 - 1910.269(l)(3) - Determining voltage ratings for electrical insulating equipment used during electrical power distribution and transmission work.
35
09/27/2005 - 1910.269(l)(2) - Determining voltage ratings for electrical insulating equipment used during electrical power distribution and transmission work.
36
09/27/2005 - 1910.269(l)(1) - Determining voltage ratings for electrical insulating equipment used during electrical power distribution and transmission work.
37
10/05/2004 - 1910.269(l)(2) - Grounding requirements for aerial lifts (bucket trucks) under the General Industry 1910.269 and Construction 1926.952 standards.
38
09/16/2003 - 1910.269(l)(1)(ii) - Minimum number of employees required for performing electric power work conducted from bucket trucks.
39
09/16/2003 - 1910.269(l)(1)(i) - Minimum number of employees required for performing electric power work conducted from bucket trucks.
40
05/27/2003 - 1910.269(l)(6)(iii) - OSHA does not specify payment requirements for apparel covered in the Electrical Power Transmission and Distribution Standard.
41
03/27/2003 - 1910.269(l)(1)(i) - Clarification of qualified employee requirements for the Electric Power Generation, Transmission, and Distribution standard.
42
08/27/2001 - 1910.269(l)(1)(ii) - Two employees must be present during work on energized systems >600 volts
43
08/27/2001 - 1910.269(l)(1)(i) - Two employees must be present during work on energized systems >600 volts
44
02/10/2000 - 1910.269(l)(3) - Exceptions to minimum approach distances for power generation, transmission and distribution
45
02/10/2000 - 1910.269(l)(2) - Exceptions to minimum approach distances for power generation, transmission and distribution
46
10/26/1999 - 1910.269(l)(2) - Minimum approach distances when using insulating gloves and sleeves.
47
08/03/1999 - 1910.269(l)(3) - Appropriate safety practices for the removal of electrical meters.
48
08/03/1999 - 1910.269(l)(2) - Appropriate safety practices for the removal of electrical meters.
49
02/22/1999 - 1910.269(l)(1) - CPR/first aid training and "working alone" provisions of 1910.269
50
06/22/1998 - 1910.269(l)(2)(i) - Stress cone work: worker protection and job briefings
51
06/22/1998
- 1910.269(l), 1910.269(l)(2)(i) -
Stress cone work: worker protection and job briefings