# | Standard Interpretations |
---|---|
1 | - 1926.757(a)(8)(ii) - Permissibility of the welding of joists over 40-feet in length, while the hoisting line is kept in place, instead of field bolting. |
2 | - 1926.757(a)(8)(ii) - Field bolting and welding requirements for steel joist assembly |
3 | - 1926.757(a)(8)(ii) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R. |