• Record Type:
    OSHA Instruction
  • Current Directive Number:
    CSP 03-01-002
  • Old Directive Number:
    TED 8.4
  • Title:
    Voluntary Protection Programs (VPP): Policies and Procedures Manual
  • Information Date:
Archive Notice - OSHA Archive

NOTICE: This is an OSHA Archive Document, and may no longer represent OSHA Policy. It is presented here as historical content, for research and review purposes only.

OSHA INSTRUCTION

 

 

DIRECTIVE NUMBER: TED 8.4 EFFECTIVE DATE: March 25, 2003
SUBJECT: Voluntary Protection Programs (VPP): Policies and Procedures Manual

 

 

 

ABSTRACT

 

 

Purpose: This Instruction revises and clarifies the overall framework of policy and procedure for administering the OSHA Voluntary Protection Programs.
 
Scope: This Instruction applies OSHA-wide.
 
Cancellations: OSHA Instruction TED 8.1a; OSHA Direction DIR 02-02 (TED 3.5).
 
References: Revisions to the Voluntary Protection Programs to Provide Safe and Healthful Working Conditions, Federal Register 65 FR 45650, July 24, 2000.
 
State Impact: This Instruction describes a Federal Program Change for which State adoption is not required.
 
Action Offices: National, Regional, and Area Offices.
 
Originating Office: Directorate of Cooperative and State Programs (DCSP).
 
Contact: Directorate of Cooperative and State Programs
Office of Partnerships and Recognition
200 ConstitutionAvenue NW, Rm N 3700
Washington, DC 20210
 
Approval: By and Under the Authority of
John L. Henshaw
Assistant Secretary
 

 

Executive Summary:


This manual cancels and replaces OSHA Instruction TED 8.1a and OSHA Direction 01-02 (TED 3.5). The purpose of the manual is to provide guidance concerning implementation of the Voluntary Protection Programs, including the policy and procedural changes published as Federal Register Notice 65 FR 45650, July 24, 2000.

 

 

Major Changes:

 

 

 

  • Eligibility  OSHA has extended eligibility for VPP participation to Federal agency worksites and to resident contractors at participating VPP sites.
     
  • OSHA History An applicant site may not have open OSHA investigations or pending or open contested citations or notices of appeal at the time of application.
     
  • Assurances. The applicant must assure OSHA that the employees at that site support VPP participation, and that all hazards discovered during the onsite evaluation will be corrected within 90 days with proof of abatement, and that any other hazards will be corrected in a timely manner. Interim protection must be provided.
     
  • Illness and Injury Rate Calculations Sites must now report a combined illness and injury rate.  At Star sites, the 3-year illness and injury total recordable case incidence rate (TCIR) and the 3-year days away, restricted, or transfer case incident rate (DART rate) must be below the industry average. Qualifying smaller worksites may use an alternative method of calculating illness and injury rates.
     
  • Contractor Coverage. Requirements for contract worker safety and health at VPP sites have been strengthened; new requirements to report contractor illness and injury rates have been added.
     
  • Clarification and Strengthening of Program Element Requirements. Employee involvement worksite analysis, and hazard prevention and control requirements have been revised.  Changes include the requirement for access to and use of occupational health care professionals and the use of the hierarchy of controls.
     
  • Duration of Merit Participation.  Program participation at the Merit level is now limited to one 3-year term unless the Assistant Secretary approves a second term.
     
  • Frequency of Participants' Onsite Evaluations.  Star site evaluations may now be conducted every 5 years after the first reapproval visit. Other events may be cause for conducting an interim evaluation.
     
  • Corporate Audit Documents To the extent that corporate audit documents are the only documents available to determine that VPP requirements are being met, the onsite evaluation team may choose to examine them.
     
  • Termination Formal termination procedures have now been established, including a site's right to appeal.  OSHA may now terminate a VPP site if the agency has evidence that trust among labor, management and OSHA no longer exists.
     

 

 

 

 

 


 

 

 

 

 

 

Contents


Chapter 1: Introduction
   Purpose
   Scope
   Cancellations
   Significant Changes
   References
   Action Information
   Federal Program Change
   Definitions
   Background
   VPP Principles
   Categories of Participation
   The Elements

Chapter 2: Responsibilities
   Introduction
   Assistant Secretary
   Directorate of Cooperative and State Programs (DCSP)
   Regioal Administrators
   VPP Managers
   OSHA Area Directors

Chapter 3: Requirements for Star, Merit, Resident Contractor, Construction Industry, and Federal Agency Worksites
   Introduction
   The Star Program
   Merit Program
   Resident Contractors
   VPP Requirements for the Construction
   VPP for Federal Agencies

Chapter 4: Star Demonstration Programs
   Purpose of Star Demonstration Programs
   Term of Program
   Development Process
   Approval of Star Demonstration Programs
   Approval of Sites Participating in Star Demonstration Programs
   Outcome of a Star Demonstration Program
   Termination of a Star Demonstration Program

Chapter 5: The Application Process
   Eligibility and Program Requirements
   Preparing the Application
   Application Records
   Procedures for Receipt and Review of Applications

Chapter 6: Onsite Evaluations
   Purpose
   Preparation for Onsite Evaluations
   Conducting the Onsite Evaluation
   Discussion of Findings
   Final Analysis of Findings
   Recommendations for First-time Participation
   Recommendations for Participants
   Closing Conference
   The Onsite Evaluation Report
   Completing the Final Onsite Evaluation Report
   Deferral of Final Onsite Evaluation Report Due to Uncorrected Hazards
   Correction of Remaining Hazards

Chapter 7: Participation Decisions and Management
   Report Processing
   Preparing A Recommendation Package
   Final Onsite Evaluation Report and Participation Date
   Notification
   Award Certificates, Plaques, and Flags
   Approval Ceremonies
   Withdrawal
   Termination
   Reinstatement

Chapter 8: Enforcement Activity at VPP Sites
    Additional VPP Assessment
   OSHA Personnel
   VPP Activity
   Initiation of Enforcement Activity
   Notification
   Inspection Results
   Documentation and submission of assessment
   Decision to continue participation or recommend withdrawal or termination
   Confidentiality


Appendix A: Instructions for Calculating Injury and Illness Rates

Appendix B: Voluntary Protection Programs Participants' Association (VPPPA)

Appendix C: Regional Activity Reports

Appendix D: Format for Annual Submissions

Appendix E: Onsite Evaluation Report Format

Appendix F: Onsite Evaluation Report User Guide

Appendix G:  Recommended Interview Questions

Appendix H:  Sample Letters

Index

 

 

 

 

 

 


 

 

 

 

 

 

Chapter I
Introduction

 

 

 

  1. Purpose This instruction revises and clarifies the overall policy framework for administering the OSHA Voluntary Protection Programs (VPP).
     
  2. Scope  This instruction applies OSHA-wide.
     
  3. Cancellations
     
    1. OSHA Instruction TED 8.1a
       
    2. OSHA Direction DIR 02-02 (TED 3.5)
       
  4. Significant Changes
     
    1. Eligibility OSHA has extended eligibility for VPP participation to federal agency worksites and to resident contractors at participating VPP sites.
       
    2. OSHA History An applicant site may not have open OSHA investigations or pending or open contested citations or notices of appeal at the time of the application.
       
    3. Assurances. The applicant must assure OSHA that the employees at the site support VPP participation; that the applicant, within 90 days, will correct and provide proof of abatement of all hazards related to OSHA requirements and identified during the onsite evaluation; and that the applicant will correct in a timely manner any other hazards discovered through any means.  The applicant must assure that it will provide effective interim protection.
       
    4. Injury and Illness Rate Calculations. Sites must now report combined injury and illness rates.  At Star sites, the 3-year total case incidence rate for recordable illnesses and injuries (TCIR) and the 3-year case incidence rate for days away from work, restricted work activity, and/or job transfer (DART) must be below the industry national average. Qualifying smaller worksites may use an alternative method of calculating rates that allows them to use the best 3 out of the most recent 4 years injury and illness experience.
       
    5. Contractor Coverage. Requirements for contract worker safety and health at VPP sites have been expanded and new requirements to report contractor illness and injury rates have been added.
       
    6. Clarification and Strengthening of Program Element Requirements. Employee involvement worksite analysis, and hazard prevention and control requirements have been revised to include:
       
      1. The requirement for access to and use of licensed occupational health care professionals, and
         
      2. An emphasis on the greater effectiveness of engineering controls within the hierarchy of controls.
         
    7. Duration of Merit Participation.  Program participation at the Merit level is now limited to one 3-year term unless OSHA's Assistant Secretary grants an extension.
       
    8. Frequency of Onsite Evaluations.  Onsite evaluations of Star participants may now be conducted every 3 to 5 years after initial approval.  Additional onsite evaluations may be conducted to reassess the participant's continuing qualification for VPP following the occurrence of a fatality, catastrophe, accident, or other incident.
       
    9. Corporate Audit Documents. To the extent that corporate audit documents are the only documents available to determine that VPP requirements are being met, the onsite evaluation team may choose to examine them.
       
    10. Termination Formal termination procedures have now been established, including a site's right to appeal an OSHA request for withdrawal or termination.
       
  5. References Revisions to the Voluntary Protection Programs to Provide Safe and Healthful Working Conditions, published as a notice in the July 24, 2000 Federal Register, Vol. 65, No. 142, page 45650.
     
  6. Action Information
     
    1. Responsible Office. Directorate of Cooperative and State Programs, Office of Partnerships and Recognition.
       
    2. Action Offices. OSHA National, Regional, and Area Offices with responsibilities for administering the Voluntary Protection Programs.
       
    3. Information Offices. State designees, OSHA Directorates of Compliance Programs, Construction, Policy, Office of Public Affairs, and Office of the Solicitor.
       
  7. Federal Program Change This instruction describes a Federal Program Change for which State adoption is not required.
     
  8. Definitions
     
    1. 1-Year Conditional Goal. A target for correcting deficiencies in safety and health management system elements or sub-elements identified by OSHA during the onsite evaluation of a Star site. Such deficiencies, which indicate that a site no longer fully meets Star requirements, must be corrected within 90 days, and the site must then operate at the Star level for 1 year, for the site's conditional status to be lifted.  Failure to meet this requirement will result in termination from VPP.
       
    2. 90-Day Items Compliance related issues that must be corrected within a maximum of 90 days, with effective protection provided to employees in the interim.
       
    3. Annual Evaluation. A participant's yearly self-assessment to gauge the effectiveness of all required VPP elements and any other elements of the site's safety and health management system.
       
    4. Annual Submission. A document written by a participant and submitted to OSHA by February 15th each year, consisting of the following information: Updated names and addresses; the site's and applicable contractors' injury and illness case numbers and rates, average annual employment and hours worked for the previous calendar year; a copy of the most recent annual evaluation of the site's safety and health management system; descriptions of significant changes or events, progress made on the previous year's recommendations, Merit or 1-Year Conditional goals (if applicable); and any success stories. [See Appendix D for the Annual Submission Format.]
       
    5. Applicable Contractor. A contractor whose employees worked at least 1,000 hours at the site in any calendar quarter within the last 12 months and are not directly supervised by the applicant/participant.
       
    6. Accepted Application. An application that has been reviewed by the Regional Office -- or the National Office for certain Demonstration Program applications -- and found to be complete.  Also referred to as a completed application.
       
    7. Backup Team Leader. A member of an onsite evaluation team who provides assistance to the team leader and can assume his/her duties when necessary.
       
    8. Compliance Officer.  A Federal compliance safety or health officer (CSHO).
       
    9. Contract Employees. Workers who are employed by a company that provides services under contract to the VPP applicant or participant, usually at the VPP applicant's or participant's worksite.
       
    10. Days Away, Restricted, and/or Transfer Case Incidence Rate The rate of all injuries and illnesses resulting in days away from work, restricted work activity, and/or job transfer. This rate is calculated for a worksite for a specified period of time (usually 1 to 3 years). [See Appendix A.]
       
    11. Demonstration Program. Hereafter called the Star Demonstration Program.  The program within VPP that enables companies and/or worksites with Star quality safety and health protection to test alternatives to current Star eligibility and performance requirements. If a Demonstration Program is judged successful, its alternative ways to achieve safety and health excellence may lead to changes in VPP criteria.
       
    12. Directorate of Cooperative and State Programs (DCSP). The Directorate responsible for coordinating and overseeing OSHA's VPP, located in OSHA's National Office.
       
    13. DCSP Regional Coordinator. A DCSP VPP staff member who is assigned to coordinate VPP related Regional activities, including the review and processing of reports and resolution of policy issues.
       
    14. Federal Register. The official Federal government publication, published by the Government Printing Office (GPO), in which OSHA announces the philosophy and criteria for VPP approval and participation in a public notice commonly referred to as the "VPP Federal Register Notice".
       
    15. General Contractor. A construction site owner or site manager who controls construction operations and has contract responsibility for assuring safe and healthful working conditions at a worksite.
       
    16. Injury/Illness Rates. Numerical rates that represent recordable injuries and illnesses at a worksite and that are an important factor when OSHA assesses a site's qualification for VPP.  [See VIII. J. above and VIII.GG. below.)
       
    17. Mentoring.  The assistance that a VPP participant provides to another worksite to improve that site's safety and health management system or prepare it for VPP application or participation.  The Mentoring Program is coordinated by the Voluntary Protection Programs Participants' Association (VPPPA).  [See Appendix B.]
       
    18. Merit Goal A target for improving one or more deficient safety and health management system elements at a site approved to the Merit program. A Merit goal must be met in order for a site to achieve Star status.
       
    19. Merit Program. The program within VPP designed for worksites that have demonstrated the potential and commitment to achieve Star quality, but that need to further improve their safety and health management system. OSHA gives a Merit Program participant specified Merit goals that it must meet in order to achieve Star status and continue within VPP.
       
    20. Onsite Assistance Visit.   A visit to an applicant or participant site by an OSHA VPP Manager, Compliance Assistance Specialist, or other non-enforcement personnel, to offer assistance to the site including help with their application, conduct a records review, and/or make general observations about the site's safety and health management system.
       
    21. Onsite Evaluation.  A visit to an applicant or participant site by an OSHA onsite evaluation team to determine whether the site qualifies to participate, continue participation, or advance within the VPP.
       
    22. Onsite Evaluation Report.  A document written by the OSHA onsite evaluation team and consisting of the site report and site worksheet [see Appendix E]. This document contains the team's assessment of a site's safety and health management system and the team's recommendation regarding approval of the applicant or reapproval of the participant in VPP.
       
    23. Onsite Evaluation Team.  An interdisciplinary group of OSHA professionals and sometimes other government employees who conduct onsite evaluations. The team normally consists of a team leader, a backup team leader, safety and health specialists, and other specialists as appropriate.
       
    24. Recommendations.  Suggested improvements noted by the onsite evaluation team that are not requirements for VPP participation but that would enhance the effectiveness of the site's safety and health management system. (Compliance with OSHA standards is a requirement, not a recommendation.)
       
    25. Resident Contractor.  A company that provides ongoing, onsite services to a VPP applicant/participant.
       
    26. Safety and Health Management System. For the purposes of VPP, a method of preventing worker fatalities, injuries and illnesses through the ongoing planning, implementation, integration, and control of four interdependent elements: Management Leadership and Employee Involvement; Worksite Analysis; Hazard Prevention and Control; and Safety and Health Training.
       
    27. Small Business. A company having no more than 250 employees at any one facility, and no more than 500 employees nationwide.
       
    28. Special Government Employee (SGE). An employee volunteer from a VPP site or corporation, knowledgeable in safety and health management system assessment, formally trained by OSHA in the policies and procedures of the VPP, and determined by OSHA to be qualified to perform VPP onsite evaluations, who participates as a team member on VPP onsite evaluations.
       
    29. Star Program. The program within VPP designed for sites whose safety and health management systems operate in a highly effective, self-sufficient manner and meet all VPP requirements.  Star is the highest level of VPP participation.
       
    30. State Plan.  A state-operated occupational safety and health program that has received approval and partial funding from Federal OSHA.
       
    31. Team Leader. The OSHA staff person who coordinates the OSHA onsite evaluation team and ensures that all evaluation activities are performed. [See Chapter 6.II.C.2.]
       
    32. Temporary Employees. Employees hired on a non-permanent basis by the applicant/participant site.
       
    33. Termination. Formal removal by OSHA of a VPP participant from the program.
       
    34. Total Case Incidence Rate (TCIR). A number that represents the total recordable injuries and illnesses per 100 full-time employees, calculated for a worksite for a specified period of time (usually 1 to 3 years). [See Appendix A.]
       
    35. VPP Activity Log. The monthly log of VPP activity that is submitted to DCSP by the Regional Offices. [See Appendix C.]
       
    36. VPP Annual Data Spreadsheet.  The yearly report prepared by the VPP Manager and submitted to DCSP electronically that provides information on the annual TCIR and DART rates of participating sites.
       
    37. VPP Application Status Report. A monthly report prepared by the VPP Manager and submitted to DCSP that provides information on VPP applications, including the number of applications pending in the Region and the number of applicant sites where an onsite evaluation has not yet commenced.
       
    38. VPP Approval Ceremony. An event planned by the approved worksite and normally held at the site, where a representative from OSHA recognizes the site's achievement, presents the VPP certificate or plaque, and presents the VPP flag.
       
    39. VPP Automated Data System (VADS). A database that includes information on approved VPP sites (under Federal or state plan jurisdiction) and VPP applicants (under Federal jurisdiction).
       
    40. VPP Manager.  The Regional staff person directly responsible for the day-to-day operations of the VPP in each Region.
       
    41. Voluntary Protection Programs Participants' Association (VPPPA).  A nonprofit 50l(c)(3) organization whose members are involved in the VPP. The mission of the VPPPA is to promote safety, health, and environmental excellence through cooperative efforts among employees, management, and government.
       
    42. VPP Site Representative. The person designated by an applicant or participant as the primary contact regarding VPP activity at the worksite.
       
    43. Withdrawal. Decision by the applicant or participant to discontinue pursuing or participating in the VPP.
       
    44. Worksite.  For VPP purposes, a worksite is a location where work is carried on by employees of an employer. [See Chapter 5.II.B.]
       
  9. Background. The Occupational Safety and Health Administration (OSHA) on July 2, 1982, announced establishment of the Voluntary Protection Programs (VPP) to recognize and promote effective worksite-based safety and health management systems. In the VPP, management, labor, and OSHA establish cooperative relationships at workplaces that have implemented comprehensive safety and health management systems.  Approval into VPP is OSHA's official recognition of the outstanding efforts of employers and employees who have created emplary worksite safety and health management systems.  OSHA offers assistance to sites committed to achieving the VPP level of excellence.

    The enabling legislation for VPP is Section (2)(b)(1) of the OSH Act, which declares the Congress's intent "to assure so far as possible every working man and woman in the Nation safe and healthful working conditions and to preserve our human resources B (1) by encouraging employers and employees in their efforts to reduce the number of occupational safety and health hazards at their places of employment, and to stimulate employers and employees to institute new and to perfect existing programs for providing safe and healthful working conditions. . ."
     
  10. VPP Principles. The following principles are embodied in the Voluntary Protection Programs:
     
    1. Voluntarism. Participation in VPP is strictly voluntary. The applicant who wishes to participate freely submits information to OSHA on its safety and health management system and opens itself to agency review.
       
    2. Cooperation.  OSHA has long recognized that a balanced, multifaceted approach is the best way to accomplish the goals of the OSH Act. VPP's emphasis on trust and cooperation between OSHA, the employer, employees, and employees' representatives complements the agency's enforcement activity, but does not take its place. VPP staff and participating sites work together to resolve any safety and health problems that may arise. This partnership enables the Agency to remove participating sites from programmed inspection lists, allowing OSHA to focus its inspection resources on establishments in greater need of agency oversight and intervention. However, OSHA continues to investigate valid employee safety and health complaints, fatalities, catastrophes, and other significant events at VPP participant sites.
       
    3. A Systems Approach. Compliance with the OSH Act and all applicable OSHA requirements is only the starting point for VPP sites. VPP participants develop and implement systems to effectively identify, evaluate, prevent, and control occupational hazards so that injuries and illnesses to employees are prevented. Star sites, in particular, are often on the leading edge of hazard prevention methods and technology.  As a result, VPP worksites serve as models of safety and health excellence, demonstrating the benefits of a systems approach to worker protection. NOTE:  Federal agencies participating in VPP also must comply with Executive Order 12196 and 29 CFR 1960, in addition to Section 19 of the OSH Act.
       
    4. Model Worksites for Safety and Health. OSHA selects VPP participants based on their written safety and health management system, the effective implementation of this system over time, and their performance in meeting VPP requirements. Not all worksites are appropriate candidates for VPP.  At qualifying sites, all personnel are involved in the effort to maintain rigorous, detailed attention to safety and health. VPP participants often mentor other worksites interested in improving safety and health, participate in safety and health outreach and training initiatives, and provide OSHA with input on proposed policies and standards. They also share best practices and promote excellence in safety and health in their industries and communities.
       
    5. Continuous Improvement. VPP participants must demonstrate continuous improvement in the operation and impact of their safety and health management systems. Annual VPP self-evaluations help participants measure success, identify areas needing improvement, and determine needed changes. OSHA onsite evaluation teams verify this improvement.
       
    6. Employee and Employer Rights. Participation in VPP does not diminish employee and employer rights and responsibilities under the OSH Act and, for Federal agencies, under 29 CFR 1960 as well.
       
  11. Categories of Participation. VPP consists of:
     
    1. Star Program. The Star Program recognizes the safety and health excellence of worksites where workers are successfully protected from fatality, injury, and illness by the implementation of comprehensive and effective workplace safety and health management systems. These worksites are self-sufficient in identifying and controlling workplace hazards.
       
    2. Merit Program. The Merit Program recognizes worksites that have good safety and health management systems and that show the willingness, commitment, and ability to achieve site-specific goals that will qualify them for Star participation.
       
    3. Star Demonstration Program. The Star Demonstration Program recognizes worksites that have Star quality safety and health management systems that differ in some significant fashion from the VPP model and thus do not meet current Star requirements. A Star Demonstration Program tests this alternative approach to protecting workers to determine if it is as protective as current Star requirements.
       
  12. The Elements. To qualify for VPP, a site must operate a comprehensive safety and health management system that includes four essential elements and their sub-elements.  These elements, when integrated into a site's daily operations, can reduce the incidence and severity of illnesses and injuries:
     
    1. Management leadership and employee involvement
       
    2. Worksite analysis
       
    3. Hazard prevention and control
       
    4. Safety and health training
       

 

 

 

 

 


 

 

 

 

 

 

Chapter II
Responsibilities

 

 

 

  1. Introduction. This chapter describes OSHA's responsibilities for managing the Voluntary Protection Programs (VPP). These responsibilities must be carried out by the identified individual or his/her designee.
     
  2. Assistant Secretary. The Assistant Secretary is responsible for all decisions relating to approval of new participants, approval from the Merit Program to the Star Program, approval of Star Demonstration Programs, lifting of 1-Year Conditional status, granting a second term in the Merit Program, and termination of participation.
     
  3. Directorate of Cooperative and State Programs (DCSP). DCSP is responsible for:
     
    1. Policies and Procedures. DCSP must develop, interpret, and revise, as needed, policies and procedures for the administration and management of the VPP, including the Federal Register Notices and the VPP Policies and Procedures Manual.
       
    2. Training. DCSP in coordination with the OSHA Training Institute (OTI) must develop and deliver training curricula for OSHA staff nationwide and Special Government Employees (SGEs) in the knowledge and skills required to effectively administer the VPP.
       
    3. Review of Applications and Onsite Evaluation Reports. DCSP must:
       
      1. Assist regions in the review of VPP applications, when requested.  DCSP also must review applications for Star Demonstration Programs in accordance with the terms of a particular Star Demonstration.
         
      2. Review all onsite evaluation reports and Regional Administrators' recommendations or re- approvals, to ensure that national formatting requirements are met and evidence that the VPP requirements are met is clearly documented.
         
      3. Prepare appropriate documentation for the Assistant Secretary's decisions and signature.
         
      4. Notify the appropriate VPP Manager of the Assistant Secretary's final decision.
         
      5. Forward copies of the following documents to the site, appropriate labor unions, Regional Administrator, VPP Manager, and the Voluntary Protection Programs Participants' Association (VPPPA).
         
        1. Assistant Secretary's approval or congratulatory letter.
           
        2. The onsite evaluation report for newly approved participants.
           
    4. Support.  DCSP must:
       
      1. Provide regions with program support when requested and when resources are available.
         
      2. Assist in the development of Star Demonstration Programs and make recommendations to the Assistant Secretary concerning approval.
         
      3. Maintain liaison with the VPPPA.
         
      4. Respond to Congressional inquiries and provide information to the public upon request.
         
    5. State Plan Changes. DCSP must consider proposed change supplements relating to VPP in state plans, in accordance with the State Plan Policies and Procedures Manual, STP 2-0.22B.
       
    6. Maintenance of Records and Data. DCSP must:
       
      1. Maintain a public file on all approved participants that includes:
         
        1. The General Information section from the application.
           
        2. DCSP Director's memorandum to the Assistant Secretary requesting approval of a VPP onsite evaluation report.
           
        3. Onsite evaluation reports.
           
        4. The Assistant Secretary's letter to the participant (which includes notification of a copy sent to any and all collective bargaining agents).
           
        5. Congressional and Gubernatorial letters.
           
        6. Any formal correspondence to and from the Regional Administrator, the VPP site, or the public.
           
      2. With support from the Directorate of Information Technology (IT), develop and maintain a comprehensive national database of VPP participants' information including, but not limited to, name, location, contact person, telephone number, approval date, VPP status, and DART rate, union information if applicable, and number of employees.
         
      3. Generate and distribute to appropriate offices monthly VPP information, including:
         
        1. VPP Onsite Evaluation Log.
           
        2. VPP Application Status Log.
           
        3. Monthly Statistical Charts.
           
        4. SGE Usage Report.
           
        5. Regular information updates for the OSHA VPP web site.
           
        6. Monthly information for inclusion in publications.
           
        7. Monthly information for inclusion in OSHA's Government Performance and Results Act (GPRA) and Strategic Plan reports.
           
  4. Regional Administrators. Regional Administrators are responsible for the overall management of the VPP in their jurisdictions. The Regional Administrator must:
     
    1. Meet VPP goals and objectives established by the Assistant Secretary.
       
    2. Ensure that VPP Managers have access to resources and expertise as needed to effectively manage the program.
       
    3. Review all VPP onsite evaluation reports. Make recommendations or decisions for participation, as appropriate.  (For the Regional Administrator's approval authority, see Chapter 7.I.A.2.)
       
    4. Forward the onsite evaluation report plus recommendation or decision to DCSP.
       
    5. Review any requests to extend the period between onsite evaluations for a site and determine whether the extension will be granted.
       
    6. Develop Star Demonstration Programs for review by DCSP and approval by the Assistant Secretary, as necessary.
       
    7. Actively promote the VPP.
       
    8. Attend, whenever possible, VPP ceremonies and conferences.
       
    9. VPP in State Plans
       
      1. Work with states that operate OSHA-approved state plans to establish, implement, or expand their VPPs.
         
      2. State Plan Changes: Review and process state plan change supplements for VPP in accordance with the State Plan Policies and Procedures Manual, STP 2-0.22b.
         
  5. VPP Managers. VPP managers are responsible for the day-to-day management of the VPP at the Regional level. They must develop and maintain a working knowledge of the VPP and must:
     
    1. Application Processing Review and process applications to the VPP in accordance with Chapter 5. In addition:
       
      1. Provide application information and assistance to interested employers, employee groups, and other parties such as trade associations, state and local governments.
         
      2. Obtain from the OSHA website and review the applicant's OSHA inspection history to determine its eligibility for VPP.
         
      3. Forward to DCSP copies of the general information sections of completed applications.
         
    2. Onsite Evaluations
       
      1. Ensure an onsite evaluation is conducted within 6 months of accepting an application.
         
      2. Schedule onsite evaluations, taking into consideration due dates, deadlines, priorities, and coordination with company officials.
         
      3. Inform the Area Director so that the site can be removed from the programmed inspection list. Such removal may occur no more than 75 days prior to the onsite evaluation.
         
      4. Ensure that an onsite evaluation report is drafted onsite, including a preliminary recommendation for the Regional Administrator's consideration.
         
      5. Determine, in coordination with DCSP, whether an application to participate in a Star Demonstration Program has sufficient merit to warrant an onsite evaluation, and make recommendation to DCSP.
         
    3. Approval
       
      1. Ensure completion of onsite evaluation reports.
         
      2. Forward to DCSP onsite evaluation reports and Regional Administrators' memos regarding their recommendations or reapproval decisions.
         
      3. Inform applicants of the Assistant Secretary's decisions regarding approval.
         
      4. Inform the Area Director of the site's approval.
         
    4. Annual Submissions from VPP Participants (See Appendix D.)
       
      1. Ensure that each VPP participant's annual submission is received by February 15th of each year. On a case-by-case basis, additional time, not to exceed 45 days, may be negotiated by the VPP Manager and a company's VPP representatives. If, after 45 days, the annual submission has not been received, the site may be asked to withdraw from the program.
         
      2. Review the annual submissions and:
         
        1. Request an explanation from the site if a substantial increase (or decrease) in rates or some problem with the program evaluation is noted.
           
        2. If an unresolved serious problem is evident, make arrangements with the company for an onsite assistance visit.
           
      3. As a courtesy, notify the site in writing that the annual evaluation submission has been received. Note any areas of concern.
         
      4. Complete, and return via e-mail, the VPP Annual Data Spreadsheet to DCSP by March 30th.
         
    5. Reapproval
       
      1. Track current VPP participants and ensure that onsite evaluations to determine a recommendation for reapproval are scheduled and conducted in accordance with Chapter 6.II.A.
         
      2. Obtain the Regional Administrator's approval for any requests to extend with just cause the period between onsite evaluations.
         
      3. Any approved extensions of time between onsite evaluations must be documented and copied to both DCSP and the Regional case file.
         
    6. Withdrawal or Termination Upon receiving a withdrawal letter from a participant, or upon termination of a participant, the VPP Manager must:
       
      1. Remove the participant's application, onsite evaluation reports, approval letters, and annual evaluations from the public file.
         
      2. Notify the Area Director of the withdrawal or termination so that the site may be returned to the programmed inspection list, if applicable, at the time of the next inspection cycle.
         
      3. Notify the Regional Administrator and DCSP in writing of any withdrawals or terminations and the reason(s) for withdrawal.
         
    7. Special Circumstances
       
      1. Discuss any change in ownership, organization, and union representation (if applicable) with the site representative, and schedule an onsite visit if needed to evaluate the change's impact. Forward to DCSP any resultant updates to the site's information.
         
      2. Coordinate and review any formal or non-formal complaints, referrals, fatali­ties or catastrophes, accidents or incidents, and resultant inspection reports or letters. (See Chapter 8.)
         
    8. Ongoing Assistance. The VPP manager will be available to assist participants as needed, e.g., when changes occur at the site that may affect continued participation.
       
    9. Maintenance of Site Files. The VPP manager must maintain a public file of all approved sites in the Region and make available to the public on request:
       
      1. VPP application and amendments.
         
      2. Onsite evaluation reports.
         
      3. Regional Administrator's letter of recommendation and the Regional Administrator's transmittal memoranda to Assistant Secretary (via the Director of DCSP).
         
      4. Assistant Secretary's and Regional Administrator's approval letters.
         
      5. Memorandum to the appropriate Area Director removing an approved site from the general inspection list.
         
      6. Related, formal correspondence.
         
    10. VPP in State Plans
       
      1. Refer inquiries regarding VPP in state plans and any applications to the appropriate State Designee.
         
      2. Encourage State plans to update DCSP with general site information and end-of-year information regarding new and existing VPP participants.
         
      3. Ensure that updated promotional materials and changes to policy or procedures are promptly distributed to State Designees.
         
    11. OSHA Area Directors. In addition to being knowledgeable about the VPP and its participants, the Area Director must:
       
      1. Inspection Deferral
         
        1. Ensure that programmed inspections of applicants are deferred for no more than 75 days prior to their scheduled onsite evaluation.
           
        2. Remove approved sites­ from any programmed inspection lists for the duration of par­ticipation, unless a site chooses otherwise.
           
        3. Return sites that have withdrawn or been terminated to the programmed inspection list, if applicable, at the time of the next inspection cycle.
           
      2. Upon the Regional Administrator's request, the Area Director must assign properly trained compliance officers (CSHOs) to serve as VPP team members or team leaders.
         
      3. The Area Director must use routine procedures for conducting complaint, referral, and/or fatality/catastrophe investigations at VPP worksites and:
         
        1. Notify the VPP Manager when a complaint (including an informal complaint responded to by letter) is received from a VPP participant and of the subsequent disposition of the complaint. (See Chapter 8.)
           
        2. Immediately notify the VPP Manager of any fatalities, catastrophes or other accidents, or incidents requiring enforcement that occur at a VPP work­site.
           
        3. Send the VPP Manager a copy of any report resulting from an enforcement case.
           
      4. Promoting VPP. In promoting VPP, Area Directors must:
         
        1. Respond completely and promptly to public inquiries about VPP.
           
        2. Promote VPP publicly and within OSHA by:
           
          1. Giving speeches and presentations and attending VPP ceremonies.
             
          2. Ensuring that CSHOs are knowledgeable about VPP requirements and objectives and encouraging them to identify possible candidate sites. 
             
          3. Referring likely VPP candidates to the VPP Manager.
             
          4. Maintaining communication with VPP sites about OSHA standards and policies, training needs, and outreach.
             
          5. Supporting Regional VPP activity to the greatest extent possible.
             
        3. Encourage VPP sites, where appropriate, to assist OSHA with accomplishing the Agency's mission, e.g., ask VPP participants to "sell" the value of safety and health to sites on the Site Specific Targeting (SST) list.
           
        4. Notify the VPP Manager of each VPP outreach.
           

 

 

 

 

 


 

 

 

 

 

 

Chapter III
Requirements for Star, Merit, Resident Contractor,
Construction  Industry, and Federal Agency Worksites

 

 

 

  1. Introduction. This chapter delineates requirements for the Star and Merit programs as well as the unique requirements for the construction industry, for Federal agencies , and for resident contractors at VPP sites.
     
  2. The Star Program. The Star Program recognizes the very best workplaces that are in compliance with OSHA regulations and that operate outstanding safety and health management systems for worker protection. All of the VPP requirements, published in Federal Register Notice 65 FR 45650-45663 and detailed below, must be in place and working effectively for at least 1 year prior to Star approval.
     
    1. Term of Participation. There is no limit to the term of participation in Star, as long as a site continues to meet all Star requirements and to maintain Star quality.
       
    2. Injury and Illness History Requirements. Injury and illness history at the site is evaluated using a 3-year total case incident rate (TCIR) and a 3-year day away, restricted, and/or transfer case incident rate (DART rate). (See Appendix A.) The 3-year TCIR and DART rates must be compared to the most recently published Bureau of Labor Statistics (BLS) national average for the three or four‑digit (if available) Standard Industrial Classification code (SIC). The TCIR and DART rates must be compared to the five- or six-digit North American Industrial Classification System (NAICS) code for the industry in which the applicant is classified when the NAICS system is adopted.  The BLS publishes SIC and NAICS industry averages 2 years after data is collected. (For example, in calendar year 2003, calendar year 2001 national averages will be available and used for comparison).
       
      1. Both the 3-year TCIR  and the 3-year DART rate  must be below the most recently published BLS national average for the specific SIC or NAICS code.
         
      2. Some smaller worksites may be eligible to use the best 3 out of the most recent 4 years for calculating incidence rates. (See Appendix A.)
         
      3. Transition to OSHA 300 logs:

        VPP will institute the following policy until such time as three consecutive years of recording data that utilizes the new recordkeeping standard has been published. Until that time, and to address the variability that is expected in the industrial accident rate averages, the following policy will be in effect:

        The requirement for a Star sight to have a 3-year injury and illness rate that is below their respective industry is to be modified such that an applicant/participant's rate must be below their respective industries injury and illness rate plus 10%.

        As a result a Star worksite may have an injury and illness rate above the national average if it is within 10% of that BLS average.
         
    3. Comprehensive Safety and Health Management System Requirements. The following safety and health management system elements and sub-elements must be implemented. For small sites, at the discretion of the onsite team, some of the requirements may be implemented and documented less formally.
       
      1. Management Leadership and Employee Involvement
         
        1. Management Commitment. Management demonstrates its commitment by:
           
          • Establishing, documenting, and communicating to employees and contractors clear goals that are attainable and measurable, objectives that are relevant to workplace hazards and trends of injury and illness, and policies and procedures that indicate how to accomplish the objectives and meet the goals.
             
          • Signing a statement of commitment to safety and health.
             
          • Meeting and maintaining VPP requirements.
             
          • Maintaining a written safety and health management system that documents the elements and sub-elements, procedures for implementing the elements, and other safety and health programs including those required by OSHA standards.
             
          • Identifying persons whose responsibilities for safety and health includes carrying out safety and health goals and objectives, and clearly defining and communicating their responsibilities in their written job descriptions.  
             
          • Assigning adequate authority to those persons who are responsible for safety and health, so they are able to carry out their responsibilities.
             
          • Providing and directing adequate resources (including time, funding, training, personnel, etc.) to those responsible for safety and health, so they are able to carry out their responsibilities.
             
          • Holding those assigned responsibility for safety and health accountable for meeting their responsibilities through a documented performance standards and appraisal system.
             
          • Planning for typical as well as unusual/emergency safety and health expenditures in the budget, including funding for prompt correction of uncontrolled hazards.
             
          • Integrating safety and health into other aspects of planning, such as planning for new equipment, processes, buildings, etc.
             
          • Establishing lines of communication with employees and allowing for reasonable employee access to top management at the site.
             
          • Setting an example by following the rules, wearing any required personal protective equipment, reporting hazards, reporting injuries and illnesses, and basically doing anything that they expect employees to do.
             
          • Ensuring that all workers (including contract workers) are provided equal, high-quality safety and health protection.
             
          • Conducting an annual evaluation of the safety and health management system in order to:
             
            • Maintain knowledge of the hazards of the site.
               
            • Maintain knowledge of the effectiveness of system elements.
               
            • Ensure completion of the previous years' recommendations.
               
            • Modify goals, policies, and procedures.
               
        2. Employee Involvement. Employees must be involved in the safety and health management system in at least three meaningful, constructive ways in addition to their right to report a hazard. Avenues for employees to have input into safety and health decisions include participation in audits, accident/incident investigations, self-inspections, suggestion programs, planning, training, job hazard analyses, and appropriate safety and health committees and teams. Employees do not meet this requirement by participating in incentive programs or simply working in a safe manner.
           
          • Employees must be trained for the task(s) they will perform. For example, they must be trained in hazard recognition to participate in self-inspections.
             
          • Employees must receive feedback on any suggestions, ideas, reports of hazards, etc. that they bring to management's attention. A site must provide documented evidence that employees' suggestions were followed up and implemented when appropriate and feasible.
             
          • All employees, including new hires, must be notified about the site's participation in VPP and employees' rights (such as the right to file a complaint) under the OSH Act. Orientation training curriculum must include this information.
             
          • Employees and contractors must demonstrate an understanding of and be able to describe the fundamental principles of VPP.
             
        3. Contract Worker Coverage. Contract workers must be provided with safety and health protection equal in quality to that provided to employees.
           
          • All contractors, whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of the host site.
             
          • VPP participants must have in place a documented oversight and management system covering applicable contractors. Such a system must:
             
            • Ensure that safety and health considerations are addressed during the process of selecting contractors and when contractors are onsite.
               
            • Encourage contractors to develop and operate effective safety and health management systems.
               
            • Include provisions for timely identification, correction, and tracking of uncontrolled hazards in contractor work areas.
               
            • Include a provision for removing a contractor or contractor's employees from the site for safety or health violations. Note: A site may have been operating effectively for 1 year without actually invoking this provision if just cause to remove a contractor or contractor's employee did not occur.
               
          • Injury and Illness Data Requirements
             
            • Nested contractors (such as contracted maintenance workers) and temporary employees who are supervised by host site management are governed by the site's safety and health management system and are therefore included in the host site's rates.
               
            • Site management must maintain copies of the TCIR and DART rate data for all applicable contractors based on hours worked at the site. (See Appendix A.)
               
            • Sites must report all applicable contractors' TCIR and DART rate data to OSHA annually.
               
          • Training. Managers, supervisors, and non-supervisory employees of contract employers must be made aware of:
             
            • The hazards they may encounter while on the site.
               
            • How to recognize hazardous conditions and the signs and symptoms of workplace-related illnesses and injuries.
               
            • The implemented hazard controls, including safe work procedures.
               
            • Emergency procedures.
               
        4. Safety and Health Management System Annual Evaluation. There must be a system and written procedures in place to annually evaluate the safety and health management system.  The annual evaluation must be a critical review and assessment of the effectiveness of all elements and sub-elements of a comprehensive safety and health management system. An annual evaluation that is merely a workplace inspection with a brief report pointing out hazards or a general statement of the sufficiency of the system is inadequate for purposes of VPP qualification.
           
          • The written annual evaluation must identify the strengths and weaknesses of the safety and health management system and must contain specific recommendations, time lines, and assignment of responsibility for making improvements.  It must also document actions taken to satisfy the recommendations.
             
          • The annual evaluation may be conducted by site employees with managers, qualified corporate staff, or outside sources who are trained in conducting such evaluations.
             
          • At least one annual evaluation and demonstrated corrective action must be completed before VPP approval.
             
          • The annual evaluation must be included with the participant's annual submission to OSHA. Appendix D provides a suggested format.
             
      2. Worksite Analysis. A hazard identification and analysis system must be implemented to systematically identify basic and unforeseen safety and health hazards, evaluate their risks, and prioritize and recommend methods to eliminate or control hazards to an acceptable level of risk. Through this system, management must gain a thorough knowledge of the safety and health hazards and employee risks. The required methods of hazard identification and analysis are described below.
         
        1. Baseline Safety and Industrial Hygiene Hazard Analysis. A baseline survey and analysis is a first attempt at understanding the hazards at a worksite. It establishes initial levels of exposure (baselines) for comparison to future levels, so that changes can be recognized. Systems for identifying safety and industrial hygiene hazards, while often integrated, may be evaluated separately. Baseline surveys must:
           
          • Identify and document common safety hazards associated with the site (such as those found in OSHA regulations or building standards, for which existing controls are well known), and how they are controlled.
             
          • Identify and document common health hazards (usually by initial screening using direct-reading instruments) and determine if further sampling (such as full-shift dosimetry) is needed.
             
          • Identify and document safety and health hazards that need further study.
             
          • Cover the entire work site, indicate who conducted the survey, and when it was completed.
             
          The original baseline hazard analysis need not be repeated subsequently unless warranted by changes in processes, equipment, hazard controls, etc.
           
        2. Hazard Analysis of Routine Jobs, Tasks, and Processes. Task-based or system/process hazard analyses must be performed to identify hazards of routine jobs, tasks, and processes in order to recommend adequate hazard controls. Acceptable techniques include, but are not limited to: Job Hazard Analysis (JHA), and Process Hazard Analysis (PrHA).
           
          • Hazard analyses should be conducted on routine jobs, tasks and processes that:
             
          • Have written procedures.
             
          • Have had injuries/illnesses associated with them or have experienced significant incidents or near-misses.
             
          • Are perceived as high-hazard tasks, i.e., they could result in a catastrophic explosion, electrocution, or chemical over-exposure.
             
          • Have been recommended by other studies and analyses for more in-depth analysis.
             
          • Are required by a regulation or standard.
             
          • Any other instance when the VPP applicant or participant determines that hazard analysis is warranted.
             
        3. Hazard Analysis of Significant Changes. Hazard analysis of significant changes, including but not limited to non-routine tasks (such as those performed less than once a year), new processes, materials, equipment and facilities, must be conducted to identify uncontrolled hazards prior to the activity or use, and must lead to hazard elimination or control.

          If a non-routine or new task is eventually to be done on a routine basis, then a hazard analysis of this routine task should subsequently be developed.
           
        4. Pre-use analysis. When a site is considering new equipment, chemicals, facilities, or significantly different operations or procedures, the safety and health impact to the employees must be reviewed. The level of detail of the analysis should be commensurate with the perceived risk and number of employees affected. This practice should be integrated in the procurement/ design phase to maximize the opportunity for proactive hazard controls.
           
        5. Documentation and Use of Hazard Analyses. Hazard analyses performed to meet the requirements of c. or d. above must be documented and must:
           
          • Consider both health and safety hazards.
             
          • Identify the steps of the task or procedure being analyzed, hazard controls currently in place, recommendations for needed additional or more effective hazard controls, dates conducted, and responsible parties.
             
          • Be used in training in safe job procedures, in modi­fying workstations, equipment or materials, and in future planning efforts.
             
          • Be easily understood.
             
          • Be updated as the environment, procedures, or equipment change, or errors are found that invalidate the most recent hazard analyses.
             
        6. Routine Self-Inspections. A system is required to ensure routinely scheduled self-inspections of the workplace.  It must include written procedures that determine the frequency of inspection and areas covered, those responsible for conducting the inspections, recording of findings, responsibility for abatement, and tracking of identified hazards for timely correction.  Findings and corrections must be documented.
           
          • Inspections must be made at least monthly, with the actual inspection schedule being determined by the types and severity of hazards.
             
          • The entire worksite must be covered at least once each quarter.
             
          • Top management and others, including employees who have knowledge of the written procedures and hazard recognition, may participate in the inspection process.
             
          • Personnel qualified to recognize workplace hazards, particularly hazards peculiar to their industry, must conduct inspections.
             
          • Documentation of inspections must evidence thoroughness beyond the perfunctory use of checklists.
             
        7. Hazard Reporting System for Employees. The site must operate a reliable system that enables employees to notify appropriate management personnel in writing -- without fear of reprisal -- about conditions that appear hazardous, and to receive timely and appropriate responses. The system can be anonymous and must include timely responses to employees and tracking of hazard elimination or control to completion.
           
        8. Industrial Hygiene (IH) Program. A written IH program is required. The program must establish procedures and methods for identification, analysis, and control of health hazards for prevention of occupational disease.
           
          • IH Surveys. Additional expertise, time, technical equipment, and analysis beyond the baseline survey may be required to determine which environmental contaminants (whether physical, biological, or chemical) are present in the workplace, and to quantify exposure so that proper controls can be implemented.
             
          • Sampling Strategy.  The written program must address sampling protocols and methods implemented to accurately assess employees' exposure to health hazards. Sampling should be conducted when:
             
            • Performing baseline hazard analysis, such as initial screening and grab sampling.
               
            • Baseline hazard analysis suggests that more in-depth exposure analysis, such as full-shift sampling, is needed.
               
            • Particularly hazardous substances (as indicated by an OSHA standard, chemical inventory, material safety data sheet, etc.) are being used or could be generated by the work process.
               
            • Employees have complained of signs of illness.
               
            • Exposure incidents or near-misses have occurred.
               
            • It is required by a standard or other legal requirement.
               
            • Changes have occurred in such things as the processes, equipment, or chemicals used.
               
            • Controls have been implemented and their effectiveness needs to be determined.
               
            • Any other instance when the VPP applicant or participant determines that sampling warranted.
               
          • Sampling Results.  Sampling results must be analyzed and compared to at least OSHA permissible exposure limits (PELs) to determine employees' exposure and possible overexposure. Comparison to more restrictive levels, such as action levels, threshold limit values (TLVs), or self-imposed standards is encouraged to reduce exposures to the lowest feasible level.
             
            • Documentation.  The results of sampling must be documented and must include a description of the work process, controls in place, sampling time, exposure calculations, duration, route, and frequency of exposure, and number of exposed employees.
               
            • Communication. Sampling results must be communicated to employees and management.
               
            • Use of Results. Sampling results must be used to identify areas for additional, more in-depth study, to select hazard controls, and to determine if existing controls are adequate.
               
          • IH Expertise. IH sampling should be performed by an industrial hygienist, but initial sampling, full-shift sampling, or both may be performed by safety staff members with special training in the specific procedures for the suspected or identified health hazards in the workplace.  
             
            • Procedures.  Standard, nationally recognized procedures must be used for surveying and sampling as well as for testing and analy­sis.
               
            • Use of Contractors. If an outside contractor conducts industrial hygiene surveys, the contractor's report must include all sampling information listed above and must be effectively communicated to site management. Any recommendations contained in the report should be considered and implemented where appropriate.    Use of contractors does not remove responsibility for the IH program, including identification and control of health hazards, from the VPP applicant or participant.
               
        9. Investigation of Accidents and Near-Misses. The site must investigate all accidents and near-misses and must maintain written reports of the investigations. Accident and near-miss investigations must:
           
          • Be conducted by personnel trained in accident investigation techniques. Personnel who were not involved in the accident or who do not supervise the injured employee(s) should conduct the investigation to minimize potential conflicts of interest.
             
          • Document the entire sequence of relevant events.
             
          • Identify all contributing factors, emphasizing failure or lack of hazard controls.
             
          • Determine whether the safety and health management system was effective, and where it was not, provide recommendations to prevent recurrence.
             
          • Not place undue blame or reprisal on employees, although human error can be a contributing factor.
             
          • Assign priority, time frames, and responsibility for implementing recommended controls.
             
          • The results of investigations (to include, at a minimum, a description of the incident and the corrections made to avoid recurrence) must be made available to employees on request, although the actu­al investigation records need not be provided.
             
        10. Trend Analysis. The process must include analysis of information such as injury/illness history, hazards identified during inspections, employee reports of hazards, and accident and near-miss investigations for the purpose of detecting trends. The results of trend analysis must be shared with employees and management and utilized to direct resources; prioritize hazard controls; and determine or modify goals, objectives, and training to address the trends.
           
      3. Hazard Prevention and Control. Management must ensure the effective implementation of systems for hazard prevention and control and ensure that necessary resources are available, including the following:
         
        1. Certified Professional Resources. Access to certified safety and health professionals and other licensed health care professionals is required. They may be provided by offsite sources such as corporate headquarters, insurance companies, or private contractors.  OSHA will accept certification from any recognized accrediting organization.
           
        2. Hazard Elimination and Control Methods. The types of hazards employees are exposed to, the severity of the hazards, and the risk the hazards pose to employees should all be considered in determining methods of hazard prevention, elimination, and control.  In general, the following hierarchy should be followed in determining hazard elimination and control methods.  When engineering controls have been studied, investigated, and implemented, yet still do not bring employees' exposure levels to below OSHA permissible exposure limits; or when engineering controls are determined to be infeasible, then a combination of controls may be used. Whichever controls a site chooses to employ, the controls must be understood and followed by all affected parties; appropriate to the site's hazards; equitably enforced through the disciplinary system; written, implemented, and updated by management as needed; used by employees; and incorporated in training, positive reinforcement, and correction programs.
           
          • Engineering. Engineering controls directly eliminate a hazard by such means as substituting a less hazardous substance, by isolating the hazard, or by ventilating the workspace. These are the most reliable and effective controls.
             
            • Protective Safety Devices. Although not as reliable as true engineering controls, such methods include interlocks, redundancy, failsafe design, system protection, fire suppression, and warning and caution notes.
               
          • Administrative. Administrative controls significantly limit daily exposure to hazards by control or manipulation of the work schedule or work habits. Job rotation is a type of administrative control.
             
          • Work Practices. These controls include workplace rules, safe and healthful work practices, personal hygiene, housekeeping and maintenance, and procedures for specific operations.
             
          • Personal Protective Equipment (PPE).  PPE to be used are determined by hazards identified in hazard analysis. PPE  should only be used when all other hazard controls have been exhausted or more significant hazard controls are not feasible.
             
        3. Hazard Control Programs. Applicants and participants must be in compliance with any hazard control program required by an OSHA standard, such as PPE, Respiratory Protection, Lockout/Tagout, Confined Space Entry, Process Safety Management, or Bloodborne Pathogens.  VPP applicants and participants must periodically review these programs (most OSHA standards require an annual review) to ensure they are up to date.
           
        4. Occupational Health Care Program
           
          • Licensed health care professionals must be available to assess employee health status for prevention, early recognition, and treatment of illness and injury.
             
          • Arrangements for needed health services such as pre-placement physicals, audiograms, and lung function tests must be included.
             
          • Employees trained in first aid, CPR providers, physician care, and emergency medical care must be available for all shifts within a reasonable time and distance.  The applicant or participant may consider, based on site conditions, providing Automated External Defibrillators (AEDs) and training in their use.
             
          • Emergency procedures and services including provisions for ambulances, emergency medical technicians, emergency clinics or hospital emer­gency rooms should be available and explained to employees on all shifts. Also see paragraph h below.
             
        5. Preventive Maintenance of Equipment. A written preventive and predictive maintenance system must be in place for monitoring and maintaining workplace equipment. Equipment must be replaced or repaired on a schedule, following manufacturers' recommendations, to prevent it from failing and creating a hazard. Documented records of maintenance and repairs must be kept. The system must include maintenance of hazard controls such as machine guards, exhaust ventilation, mufflers, etc.
           
        6. Tracking of Hazard Correction. A documented system must be in place to ensure that hazards identified by any means (self-inspections, accident investigations, employee hazard reports, preventive maintenance, injury/illness trends, etc.) are assigned to a responsible party and corrected in a timely fashion. This system must include methods for:
           
          • Recording and prioritizing hazards, and
             
          • Assigning responsibility, time-frames for correction, interim protection, and follow-up to ensure abatement.
             
        7. Disciplinary System. A documented disciplinary system must be in place. The system must include enforcement of appropriate action for violations of the safety and health policies, procedures, and rules. The disciplinary policy must be clearly communicated and equitably enforced to employees and management. The disciplinary system for safety and health can be a sub-part of an all-encompassing disciplinary system.
           
        8. Emergency Preparedness and Response. Written procedures for response to all types of emergencies (fire, chemical spill, accident, terrorist threat, natural disaster, etc.) on all shifts must be established, must follow OSHA standards, must be communicated to all employees, and must be practiced at least annually. These procedures must list requirements or provisions for:
           
          • Assessment of the emergency.
             
          • Assignment of responsibilities (such as incident commander).
             
          • First aid.
             
          • Medical care.
             
          • Routine and emergency exits.
             
          • Emergency telephone numbers.
             
          • Emergency meeting places.
             
          • Training drills, minimally including annual evacuation drills.  Drills must be conducted at times appropriate to the performance of work so as not to create additional hazards. Coverage of critical operations must be provided so that all employees have an opportunity to participate in evacuation drills.
             
          • Documentation and critique of evacuation drills and recommendations for improvement.
             
          • Personal protective equipment where needed.
             
      4. Safety and Health Training
         
        1. Training  must be provided so that managers, supervisors, non-supervisory employees, and contractors are knowledgeable of the hazards in the workplace, how to recognize hazardous conditions, signs and symptoms of workplace-related illnesses, and safe work procedures.
           
        2. Training  required by OSHA standards must be provided in accordance with the particular standard.
           
        3. Managers and supervisors must understand their safety and health responsibilities and how to carry them out effectively.
           
        4. New employee orientation/training must include, at a minimum, discussion of hazards at the site, protective measures, emergency evacuation, employee rights under the OSH Act, and VPP.
           
        5. Training  should be provided for all employees regarding their responsibilities for each type of emergency. Managers, supervisors, and non-supervisory employees, including contractors and visitors, must understand what to do in emergency situations.
           
        6. Persons responsible for conducting hazard analysis, including self-inspections, accident./incident investigations, job hazard analysis, etc., must receive training to carry out these responsibilities, e.g., hazard recognition training, accident investigation techniques, etc.
           
        7. Training attendance must be documented. Training frequency must meet OSHA standards, or for non-OSHA required training, be provided at adequate intervals. Additional training must be provided when s in work processes, new equipment, new procedures, etc. occur.
           
        8. Training curricula must be up-to-date, specific to worksite operations, and modified when needed to reflect changes and/or new workplace procedures, trends, hazards and controls identified by hazard analysis.  Training curricula must be understandable for all employees.
           
        9. Persons who have specific knowledge or expertise in the subject area must conduct training.
           
        10. Where personal protective equipment (PPE) is required, employees must understand that it is required, why it is required, its limitations, how to use it, and maintenance.
           
  3. Merit Program. The Merit program recognizes worksites that have good safety and health management systems but must take additional steps to reach Star quality. If OSHA determines that an employer has demonstrated the commitment and possesses the resources to meet Star requirements within 3 years, the employer may enter the Merit program with set goals for reaching Star.
     
    1. Injury and Illness History Requirements. The TCIR  and DART rate must be calculated and compared to the industry average in the same manner as for the Star Program, except that the 3-year rates do not have to be below the industry average. The following restrictions apply:
       
      1. If the site has either or both the TCIR  and DART rate  above the industry average, the site must set realistic, concrete goals for reducing both rates within 2 years and must specify the methods (approved by the VPP Manager) to be used to accomplish the goals.
         
      2. It must be programmatically and statistically feasible for the site to reduce its TCIR  and DART rate  to below the industry average within 2 years.
         
    2. Comprehensive Safety and Health Management System Requirements. The basic elements and sub-elements described for Star participation (Management Leadership and Employee Involvement, Worksite Analysis, Hazard Prevention and Control, Safety and Health Training ) must all be operational or, at a minimum, in place and ready for implementation by the date of approval. In addition, all minimum requirements (MRs) must be met.  (See Appendix E.)
       
    3. Merit Goals.  If the Onsite evaluation team recommends participation in the Merit program, the site must then complete a set of goals in order to maintain Merit status and qualify for the Star Program.
       
      1. Merit goals must address Star requirements not presently in place or aspects of the safety and health management system that are not up to Star quality.
         
      2. Methods for improving the safety and health management system that will address identified problem areas must be included in Merit goals.
         
      3. Correction of a specific hazardous condition must be a 90-day item, not a Merit goal.  However, when a safety and health management system deficiency underlies a specific hazardous condition, then corrections to the system must be included as Merit goals.
         
      4. Reducing a 3-year TCIR  or DART rate  to below the national average is not, by itself, an appropriate Merit goal.  Corrections to safety and health management system deficiencies underlying the high rate must be included in the Merit goals.
         
    4. Term of Participation. The length of term is dependent on the time necessary to accomplish Merit goals; however, initial approval to Merit will be for a single term not to exceed 3 years. [See Chapter 6.VIII.C.2.]
       
      1. A site must meet Star rate requirements within the first 2 years of its Merit participation. This is to afford an additional year's experience, for a total of no more than 3 years to gain Star approval.
         
      2. A Merit sites qualifies for Star when it has met its Merit goals, Star rate requirements, and when all other safety and health elements and sub-elements are operating at Star quality.
         
      3. A Merit site may qualify for the Star Program before the end of its Merit term if the site meets all conditions in 2. above.
         
  4. Resident Contractors Contractors working at a VPP site may apply to VPP. The requirements for the resident contractor are identical to those of VPP generally, with the following additions:
     
    1. The host site must be an approved VPP (Star or Merit) site before the resident contractor may submit its application. In addition, the resident contractor must have a minimum of 12 months on site before submitting an application.
       
    2. The type of work being conducted by the resident contractor must be evaluated to determine the appropriate industry classification.
       
      1. If the resident contractor is fulfilling a function that would normally be filled by the host (such as general maintenance), then the resident contractor should be assigned the host's industry classification.
         
      2. If the resident contractor is independent and would not normally be associated with the host site's industry or service, then the contractor's own industry classification should be assigned.
         
    3. If the resident contractor has less than 3 years on site, apply the injury and illness history requirements for construction. [See V.A. below.]
       
    4. The resident contractor's participation, once approved, is contingent upon the host site's continued participation in VPP.
       
    5. A general contractor (GC) of a large construction project at an approved VPP site can submit a separate application for VPP.  The requirements for construction apply.
       
    6. Replacement of an Approved Resident Contractor. When a VPP resident contractor at a VPP site is replaced by a new resident contractor, whether VPP approval will transfer to the new resident contractor depends on several factors.
       
      1. VPP status can transfer if 75% or more of the employees remain employed with the new resident contractor and if the new resident contractor:
         
        1. Submits a new letter of management commitment,
           
        2. Submits a new self-evaluation, and
           
        3. Receives a satisfactory OSHA onsite evaluation within 12 months (6 months is preferred).
           
      2. A new VPP application is required if fewer than 75% of the employees remain employed with the new resident contractor.
         
    7. Continuing VPP status of an approved subcontractor to the initial resident contractor depends on the status of the new resident contractor.
       
      1. If VPP status transfers to the new resident contractor, as in F1.above, the subcontractor maintains its VPP status.
         
      2. If the new resident contractor is required to submit a new VPP application, as in F2.above, the subcontractor must withdraw from VPP and then reapply after approval of the new resident contractor.
         
  5. VPP Requirements for the Construction Industry A construction appli­cant must be the general con­tractor (GC), owner, or an organization that provides overall management at a site, controls site operations, and has ultimate responsibility for assuring safe and healthful working conditions at the site. The project must have been in operation for at least 12 months prior to approval.  Construction applications cover individual sites only.
     
    1. Injury/Illness History
       
      1. To qualify for the Star Program, the site's TCIR  and DART rate (including all subcontractor workers at the site) from site inception until time of application must be below the national average for the industry classification.
         
      2. If a site has rates which exceed the BLS average for it's SIC, then the general contractor may qualify for the Merit program if the company-wide 3-year TCIR and DART rate are below the national average.

        The site may use nationwide employment data, or may designate, with OSHA approval, an appropriate geographical area to determine employee coverage.
         
    2. Comprehensive Safety and Health Management System Requirements. The requirements for the Star and Merit programs are identical to those of VPP generally, with the following additions:
       
      1. Safety and Health Management System Evaluation. The evaluation must be conducted annually and immediately prior to completion of construction.  If a construction company does not provide the final evaluation, OSHA will not consider subsequent VPP applications for other sites operated by that company.
         
      2. Routine Self-Inspections.  These inspections must cover the entire worksite at least weekly, due to the changing nature of construction sites.
         
      3. The applicant or participant is responsible for ensuring the correction of any identified hazards, including those created by subcontractors.
         
      4. General Contractors must make subcontractors and their employees aware of the VPP application or participation and of their rights, roles and responsibilities.  Evidence that all subcontractors at the site rec­ognize these conditions is necessary and may include:
         
        1. The contractual agreement.
           
        2. A written statement of willingness to cooperate.
           
        3. Attendance at safety meetings.
           
        4. Orientation sessions for incoming subcontractor employees.
           
      5. Employee Involvement.  Employees at construction sites must be involved in safety and health at the site to the degree practical based on the time they will spend on the site. Examples of short-term involvement include attending daily toolbox talks on safety and health, and participating in daily self-inspections.  The more time they spend on site, the more involvement OSHA expects. The onsite evaluation team will judge the sufficiency of employee involvement through interviews and observations.
         
  6. VPP for Federal Agencies   Federal agency worksites that are covered by 29 CFR 1960 and fall under OSHA's jurisdiction are eligible to participate in the VPP.
     
    1. Requirements for Federal agencies are identical to those of VPP generally, with the following additions:
       
      1. In addition to complying with 29 CFR 1910 or 1926, Federal agency worksites must also be in full compliance with 29 CFR 1960.
         
      2. Federal worksites must notify their Designated Agency Safety and Health Official (DASHO) in writing of their intent to apply to the VPP and must submit a copy of that written notification with their application.
         
      3. Federal worksites must make available to the OSHA onsite evaluation team their agency's current Annual Occupational Safety and Health Report to the Secretary of Labor.  Any applicable elements should be noted and corrected.
         
      4. Federal worksites must make available to the OSHA onsite evaluation team copies of their OSHA 200/300 logs and Federal Occupational Injury and Illness Log for the most recent 3 calendar years.
         
      5. Federal worksites must not have any open Notices.
         
      6. Federal worksites may be subject to strict contract language and regulations governing selection and removal of contractor workers, making it contractually impossible to pre-screen particular contractors based on injury/illness rates. In such cases, OSHA may accept alternative strategies to assure worker safety and health protection.
         
    2. Injury/Illness History The following additional requirements apply to Federal agency worksites:
       
      1. Federal agency worksites must keep, in addition to their Federal Occupational Injury and Illness Log, OSHA 300 logs for the previous 3 calendar years. These will be compared to their private sector counterparts.
         
      2. If using the calendar year creates a recordkeeping burden, Federal agency worksites may use the fiscal year to calculate injury/illness rates.
         

 

 

 

 

 


 

 

 

 

 

 

Chapter IV
Star Demonstration Programs

 

 

  1. Purpose of Star Demonstration Programs Star Demonstration Programs enable OSHA to work with companies and industries to demonstrate the effectiveness of methods for achieving excellence in safety and health management systems that are potential alternatives to current Star requirements. OSHA may approve Star Demonstration Programs for such purposes as:
     
    1. Exploring the application of VPP in industries where OSHA lacks substantial experience.
       
    2. Testing an alternative approach that, if successful, will allow previously ineligible sites to participate in VPP.
       
    3. Exploring the feasibility of VPP in worksites with joint Federal agency oversight in the area of safety and health management, such as nuclear power plants.
       
    4. Exploring the feasibility of permanently establishing a new level or type of participation in VPP.
       
    5. Experimenting with an alternative approach that, if successful, will be an improvement over current standards in safety and health management.
       
    6. Exploring other opportunities to develop innovations and improvements in safety and health management.
       
  2. Term of Program Star Demonstration Programs will be approved for an agreed upon period of time not to exceed 5 years.
     
  3. Process Overview Star Demonstration Programs are established in a two-phase process. First, a Star Demonstration Program proposal is developed for consideration by the Assistant Secretary.  If the Assistant Secretary approves the proposal as a new Star Demonstration Program, appropriate candidates may apply to participate in that particular Star Demonstration Program.
     
  4. Proposal Development Approval of Star Demonstration Programs.  Parties interested in developing proposals must work with the Director of Cooperative and State Programs or the Regional Administrator, one of whom will take the lead as the primary point of contact with the proposing party.
     
    1. Who May Submit a Proposal. Either OSHA or any stakeholder may propose a Star Demonstration Program. In addition to individual worksites, proposals may come from corporations, unions, or other organizations for example, a group of small businesses that have joined to provide a complete system of safety and health protection for affected employees.
       
    2. Proposal Components.    At a minimum, proposals must include a detailed description of the proposed Star Demonstration Program, including a discussion of:
       
      1. The desirability of establishing the proposed program, and how it would serve the goals of VPP.
         
      2. The alternative approach(es) to be tested, including proposed methodology and potential benefits.
         
      3. Star requirements, if any, that will not be met while testing the alternative approach(es).
         
      4. Measures to be put in place to ensure that all employees and contractors will receive the protection of a Star quality safety and health management system.
         
      5. System to evaluate the Star Demonstration Program to determine its success or failure.
         
    3. Exceptions to Star Requirements.  A Star Demonstration Program proposal may include exceptions to normal Star requirements, so long as all employees and contractors continue to receive Star quality protection. 
       
      1. Alternative methods of implementing the four basic elements may be the subject of a Star Demonstration Program.
         
      2. If appropriate to the testing of an alternative approach, an applicant may not be required to address all the specific sub-elements that comprise each basic element.
         
      3. OSHA will consider other proposed exceptions to normal Star requirements
         
  5. Review and Approval of Star Demonstration Program Proposals. The National and affected Regional Offices jointly review all Star Demonstration Program proposals using the above criteria. The review process is as follows:
     
    1. The Review Process:
       
      1. The Regional Administrator and the Director of Cooperative and State Programs must discuss the merits and disadvantages of the proposal.
         
      2. OSHA's lead contact with the proposing party, either the Director of Cooperative and State Programs or the Regional Administrator, must prepare for DCSP a written program description and recommendation regarding the advisability of pursuing the proposed program.
         
      3. The Director of Cooperative and State Programs must decide whether it is advisable to pursue the proposed program. [See B. below]
         
        1. If it appears advisable, the next step is for OSHA's lead to negotiate program-specific requirements with the proposing party.
           
    2. Recommendation.  If the Director of Cooperative and State Programs decides to recommend approval of the proposed program, he/she must forward the recommendation to the Assistant Secretary.  If the Director of Cooperative and State Programs decides that the proposal should not be approved, he/she must provide the affected Regional Administrators with a detailed explanation of why the proposed Star Demonstration program is being rejected, and the OSHA lead contact must provide this detailed explanation to the proposing party.
       
    3. The Assistant Secretary's Decision. Upon receiving a recommendation to approve from the Director of Cooperative and State Programs, the Assistant Secretary must decide whether to approve the proposed program.
       
      1. If approved, the Star Demonstration Program is opened to applications on the day it is announced to the public. DCSP announces new Star Demonstration Programs to the public by means such as fact sheets, press releases, and OSHA's web site.
         
      2. If the Assistant Secretary decides against approval, the Director of Cooperative and State Programs must provide the affected Regional Administrators with an explanation of why the proposed program has been rejected, and the OSHA lead contact will provide this explanation to the proposing party.
         
  6. Approval of Applicants in Star Demonstration Programs
     
    1. Application Review. OSHA will review applications and determine if they meet the requirements of the particular Star Demonstration Program.  If deemed complete and acceptable, an onsite evaluation will be scheduled.
       
    2. Onsite Evaluations: Onsite evaluations must be conducted according to the general procedures described in Chapter 6, except that:
       
      1. Any specific requirements unique to the particular Star Demonstration Program must also be considered.
         
      2. Three recommendation options are available to the onsite evaluation team:  approval to the Star Demonstration Program, approval directly into the Star Program [see Chapter 6.VII.B.2], or denial.
         
    3. Approval to Participate. The Assistant Secretary will decide whether to approve the applicant to the Star Demonstration Program. The official approval date is the date of the Assistant Secretary's approval letter.
       
    4. Term of Participation.  Participants may be approved for a period of time agreed upon in advance of the approval. This period may not exceed 5 years, which is the maximum length of time a Star Demonstration Program may operate.
       
    5. Frequency of Onsite Evaluations.  Onsite evaluations must be conducted according to the procedures described in Chapter 6 and must occur at least every 12-18 months.
       
  7. Outcome of a Star Demonstration Program
     
    1. Regional Comment Period.  After the expiration of a Star Demonstration Program, the Director of Cooperative and State Programs must request and consider an analysis of program results from affected Regional Administrators. The Regional Administrators must submit their comments no more than 90 days after the expiration of the program.
       
    2. Report to the Assistant Secretary. Based on the comments submitted by affected Regional Administrators, the Director of Cooperative and State Programs must prepare and submit to the Assistant Secretary a recommendation on changing Star requirements to include or be replaced by the Star Demonstration Program requirements. The Director must submit the recommendation no more than 60 days after the end of the Regional Administrators' comment period.
       
    3. Assistant Secretary's Decision.
       
      1. If the Assistant Secretary decides to change Star requirements:
         
        1. The changes become effective on the day they are announced to the public by DCSP by such means as, for example, fact sheets, a press release, or OSHA's web site.
           
        2. Star Demonstration Program participants may begin the process of seeking Star Program approval.
           
        3. If less than 18 months have passed since a participant's last onsite evaluation, that site may be approved to Star status automatically. The official approval date is the day the Star requirement changes became effective.
           
        4. If more than 18 months have passed since a participant's last onsite evaluation, an evaluation must be conducted before the site can be recommended for Star status. The official approval date is the day of the Assistant Secretary's approval letter.
           
      2. If the Assistant Secretary decides that the Star Demonstration was not successful, the participants will not qualify for Star status, and their VPP participation must end.
         
  8. Termination of a Star Demonstration Program
     
    1. OSHA must terminate a Star Demonstration Program or a Star Demonstration Program participant when the demonstration period has expired or if the program is:
       
      1. Likely to endanger workers.
         
      2. Unlikely to result in changes to Star requirements.
         
      3. Unlikely to result in the creation of a new type or level of VPP participation.
         
    2. If the Assistant Secretary decides to terminate a Star Demonstration Program or Star Demonstration Program participant, the Director of Cooperative and State Programs must prepare and distribute a memorandum explaining reasons for the termination to:
       
      1. All affected Regional Offices.
         
      2. All affected Star Demonstration Program participants.
         
      3. Other affected stakeholders such as corporate headquarters, unions, or the VPPPA.

 

 

 

 


 

 

 

 

 

 

Chapter V
The Application Process

 

 

 

  1. Eligibility and Program Requirements
     
    1. Eligibility The VPP accepts applications from general industry in the private sector, maritime and construction worksites, and from Federal agency worksites that have implemented a safety and health management system meeting the requirements of 29 CFR 1960. VPP accepts applications from owners and site managers who control site operations and have ultimate responsibility for assuring safe and healthful working conditions at the site. VPP also accepts applications from resident contractors at participating VPP sites. Applications for participation are subject to the following conditions.
       
      1. Employees' Support of Participation. Employees must support the site's participation in VPP. Requirements vary according to whether the site has a recognized employee representative, as explained in the Federal Register 65 FR 45650, July 24, 2000.
         
      2. OSHA Inspection History   If OSHA has inspected an applicant site in the 36 months preceding the application, the inspection, abatement, and any other history of interaction with OSHA must indicate good faith attempts by the employer to improve safety and health at the site. This includes verification of correction of all serious violations. In addition, the existence of any of the following at the site precludes the site's participation in VPP:
         
        1. Open enforcement investigations.
           
        2. Pending or open contested citations or notices under appeal at the time of application.
           
        3. Affirmed willful or 11(c) violations during the 36 months prior to application.
           
        4. Unresolved, outstanding enforcement actions such as long term abatement agreements or contests.
           
        OSHA history pertaining to a non-VPP site of the same company will not adversely affect VPP participation, unless it is determined that a corporate decision, program, or policy which applies to all company sites does not meet OSHA standards.
         
    2. Program Requirements.  Applicants must understand and agree, through assurances, to fulfill program requirements for participation in the VPP.  
       
      1. Applicants must assure that:
         
        1. The applicant will comply with the Act and, in the case of Federal agencies, 29 CFR 1960, and will correct in a timely manner all hazards discovered through self-inspections, employee notification, accident investigations, an OSHA onsite review, process hazard reviews, annual evaluations, or any other means. The applicant will provide effective interim protection as necessary.
           
        2. Site deficiencies related to compliance with OSHA requirements and identified during the OSHA onsite review will be corrected within 90 days, with interim protection provided to employees.
           
        3. Site employees support the VPP application.
           
        4. VPP elements are in place, and the requirements of the elements will be met and maintained.
           
        5. Employees, including newly hired employees and contract employees when they reach the site, will have the VPP explained to them, including employee rights under the program and under the Act or 29 CFR Part 1960.
           
        6. Employees performing safety and health duties as part of the applicant's safety and health management system will be protected from discriminatory actions resulting from their carrying out such duties, just as Section 11(c) of the Act and 29 CFR 1960.46(a) protect employees who ercise their rights.
           
        7. Employees will have access to the results of self-inspections, accident investigations, and other safety and health management system data upon request. At unionized sites, this requirement may be met through the employee representative's access to these results.
           
        8. The information listed below will be maintained and available for OSHA review to determine initial and continued approval to the VPP:
           
          • Written safety and health management system.
             
          • All documentation enumerated in Chapter 6.IV.A.
             
          • Any agreements between management and the collective bargaining agent(s) concerning safety and health.
             
          • Any data necessary to evaluate the achievement of individual Merit or 1-Year Conditional goals.
             
        9. Each year by February 15, each participating site must send its annual evaluation submission to the appropriate VPP Manager. (See Appendix D.)
           
        10. Whenever significant organizational, ownership, union, or operational changes occur, such as but not limited to a change in management, takeover, or merger, the site will provide OSHA within 60 days a new statement of commitment signed by both management and any authorized collective bargaining agents, as appropriate.
           
      2. The applicant must demonstrate a willingness to follow through on all assurances.
         
      3. Employees must be aware of the recourse available to them if management fails to fulfill any of these assurances. This may include rescinding their support of VPP participation or ercising the right to file an OSHA complaint.
         
  2. Preparing the Application
     
    1. Pre-application Assistance. The VPP Manager may visit a prospective applicant's site to offer assistance in the application process or before scheduling the onsite evaluation to obtain additional information or clarification of information provided in the application. Pre-application assistance may also include referrals to the VPPPA Mentoring Program, to VPPPA conferences, and to VPPPA application workshops.
       
    2. Single or Multiple Applications.  In most cases, a single VPP application is sufficient. Exceptions may occur, such as the following circumstances:
       
      If: And: Then:
      The applicant operates at a worksite where operations are physically separated but where a single, effective onsite evaluation is still feasible. All applicant employees are covered by a single safety and health management system. A single application is required.
      The applicant is the General Contractor of a construction worksite where subcontractor employees are also covered by the same safety and health management system.
      Less than 50 percent of the predominant work* performed by employees is performed at off-site location(s), for example, the sales force of a manufacturing company.
      The applicant has multiple operations. A single application is required reflecting the appropriate SIC or NAICS code for the site.*
      More than 50 percent of the predominant work* performed by employees is performed at off-site location(s). The application is to the Mobile Workforce or other affected Demonstration Program. A single application is required.
      The applicant's operations are separated by distances that would prevent an effective, single onsite evaluation, All employees may or may not be covered by a single safety and health management system. More than one application is required.
      More than one employer at a single worksite is applying for VPP (for example, an office building), N/A
      *Follow the directions in the Standard Industrial Classification Manual or when adopted the North American Industrial Classification System (NAICS) Manual, to determine the predominant work and the appropriate SIC or NAICS code. If questions still exist, contact OSHA's National Office, Directorate of Information Technology.
       
    3. Confidentiality During the application process, prior to program approval, the application and all related information is confidential and therefore must be used solely for VPP related activities.  Only applications of approved participants will be kept in a public file. If an applicant withdraws, the original application and related documents must be returned. The assigned VPP Manager's marked working copy will be held in the appropriate Regional Office for 1 year in order to respond to any questions the applicant may have.
       
  3. Application Records The VPP Manager must submit updated application information to DCSP monthly, using the VPP Application Status Report and the VPP Activity Report. [See Appendix C.]
     
  4. Procedures for Receipt and Review of Applications
     
    1. The VPP Manager must process applications as received, except as instructed below:
       
      1. Priority One.  The highest priority must be assigned to worksites that are specifically identified by OSHA for VPP participation to support agency-wide initiatives outlined in the Strategic Plan.  Worksites also may be selected because they represent a potentially useful demonstration of the VPP concept in non-traditional workplaces. In addition, the Region may decide to select particular worksites for special attention because, for example, they have the potential to serve as good role models for key regional industries or they represent locally successful "turnaround" companies.
         
      2. Priority Two.  Second level priority must be given to those worksites whose participation would increase the number of small establishments in the program. A worksite is considered a small employer if it has no more than 250 employees at any one facility, and no more than 500 employees in the corporation nationwide.
         
      3. Priority Three.  The third level of priority must be assigned to worksites whose participation in VPP would increase the industrial diversity of the program. Whenever possible, give priority to worksites in industries other than SIC 28 (Chemicals and Allied), SIC 26 (Pulp, Paper and Allied), SIC 30 (Plastics and Foams), and SIC 22-23 (Textiles and Apparel), because these industries on a national basis are well represented already. In determining the priority for a worksite, however, the Region should take into consideration the VPP sites under its jurisdiction. Thus, it might be appropriate to provide priority to a chemical plant applicant if there are no other representatives of this industry in the Region.
         
      4. Priority Four.  Fourth level priority must be given to applicants in those industries that already have VPP participants.  Preferential treatment should be provided to those worksites that, based on an assessment of the application and other factors, appear to have a greater likelihood of achieving Star status during the initial onsite evaluation. (However, applicants that do not meet Star requirements will not be rejected.)
         
    2. Original Application.  Upon receipt of an application, the VPP Manager must stamp it with the date received and reserve it for placement in the public file, should the applicant be approved to VPP.
       
    3. Acknowledgment and Record of Receipt.  The VPP Manager must notify the applicant by letter or e-mail of receipt of the application within 15 working days.  The acknowledgment must also include the name and telephone number of the VPP Manager or a designee.
       
    4. Regional Office Review.  The VPP Manager must review the application to determine if it includes all required information listed in the most recent VPP application instructions, if the applicant is eligible for onsite review, to pinpoint any major deficiencies, and to notify the applicant that the identified deficiencies must be recti­fied prior to application acceptance. In general, application review should include an examination of the following:
       
      1. General Information.  Ensure that the general information includes but is not limited to: the applicant's site name, address, key contact personnel and titles, corporate identification, collective bargaining agent contact information, number of employees and contractor employees, type of work performed, and products produced.
         
      2. Injury and Illness Rates.  The rates supplied in the application must be examined as follows:
         
        1. For general industry, the reviewer of the appli­cation must calculate the last 3 complete calendar years' total case incidence rate (TCIR) for injuries and illnesses and similarly, the days away, restricted, and/or transfer (DART) rate for injuries and illnesses for the site's regular employees. [See Appendix A.]
           
        2. For construction, calculate ratesfor the life of the site, if less than 3 years. At a minimum, the most recent 12 months is required, and the data must include all em­ployees of contractors and subcontractors on the site. (On construction sites, all contractors are considered site employees for the purpose of rate calculations, and therefore are included in the site's rates).
           
        3. The reviewer must compare the 3-year site rates (a minimum of 1-year site rates for construction) to the most recent published BLS rates for the appro­priate Standard Industrial Classification (3 or 4‑digit SIC level) or NAICS, "Occupational Inju­ries and Illness in the United States by Industry," for the site's regular employees.
           
        4. The reviewer must determine if the applicant's injury and illness rates are low enough to warrant an onsite review.
           
      3. Safety and Health Elements: The reviewer must determine if the application describes how the applicant is meeting the VPP requirements, addressing each of the elements and sub-elements of an effective safety and health management system listed in Chapter III and as outlined below.
         
        1. Management Leadership and Employee Involvement: The applicant must describe top-level management leadership in the site's safety and health management system. Note: Management must clearly describe its commitment to meeting and maintaining the requirements of VPP. The applicant must also describe how employees are involved in safety and health.
           
        2. Worksite Analysis: The applicant must describe methods used to recognize, identify, and analyze hazards. Effective worksite analysis provides the information managers and employees need for a thorough understanding of all hazardous situations to which they may be exposed.
           
        3. Hazard Prevention and Control: The applicant must describe and give examples of how hazards are addressed, including preventative maintenance, occupational health care program, emergency preparedness, and hazard elimination employing the hierarchy of controls.
           
        4. Safety and Health Training: The applicant must describe its formal and informal safety and health training program for managers, supervisors, and employees. The information must include training protocols and schedules of training.
           
      4. Assurances.  The reviewer must determine that the application contains a signed statement of assurances and that all of the required assurances have been included. [See I.B. above.]
         
      5. Additional Attachments.  The reviewer must determine if the application contains the required additional attachments, as follows:
         
        1. Copy of top-level safety policy.
           
        2. Organization chart.
           
        3. Most recent annual evaluation.
           
        4. Site map.
           
        5. Signed statement of union support if applicable.
           
    5. Discussion with the Applicant. The appropriate program choice may need to be discussed with the applicant.
       
      1. Possible Merit Candidate.  If the applicant's 3-year injury and illness rates are at or above the national average for the site's industry, and/or the applicant has not had all of the required elements for Star in place for 1 year, the applicant must be contact­ed about the possibility of qualifying for Merit.
         
      2. Possible Star Demonstration Program Candidate. If an applicant, due to the nature of the work or the worksite, cannot meet all the requirements for Star or Merit, but appears to have a safety and health management system at Star quality, the applicant should be viewed as a possible Star Demonstration Program candidate. [See Chapter 4.]
         
    6. DCSP Review.  DCSP will review an application at the request of a Region or if required by a Star Demonstration Program.
       
    7. Incomplete Applications.  If the application is considered incom­plete, the VPP Manager must notify the applicant by letter, noting the missing elements and requesting that the missing information be submitted within 90 days.  If the additional information is not provided within that time, the application must be returned to the applicant.  It can be resubmitted when completed.
       
    8. Ineligible Applications.  If it is clear that the applicant cannot qualify for VPP, the VPP Manager must ask the applicant to withdraw the application within 30 days. If the application is not with­drawn, the VPP Manager must return the application with a letter indicating the reasons the application was denied by OSHA and forward a copy of the letter to DCSP.
       
    9. Voluntary Withdrawal of an Application.  An applicant may withdraw the application by notifying the Regional Administrator. The withdrawal is effective on the date the notification is received. Then:
       
      1. The VPP Manager must:
         
        1. Determine the cause of withdrawal and notify DCSP on the Monthly VPP Activity Log.
           
        2. Return the original application to the applicant within 10 working days. If the application had already been accepted, the VPP Manager must retain a working copy for 1 year, for use in re­sponding to questions that may arise.
           
      2. The Regional Administrator must acknow­ledge the withdrawal by letter, giving the official withdrawal date. The letter must include a statement that OSHA will entertain re-application if circumstances change.  A copy of the letter must be sent to DCSP.
         
    10. Decision to Conduct the Onsite Evaluation. Once an application is accepted, the VPP Manager must:
       
      1. Notify the site -- by letter or e-mail in a timely manner -- that an onsite evaluation will be conducted.  However, no onsite evaluation may be conducted until all enforcement actions have been closed.
         
      2. Notify the appropriate Area Office so that the site can be removed from any programmed inspec­tion lists, effective no more than 75 days prior to the scheduled onsite review.
         

 

 

 

 

 


 

 

 

 

 

 

Chapter VI

Onsite Evaluations

 

 

 

  1. Purpose   An onsite evaluation consists of a thorough evaluation of a VPP applicant's or participant's safety and health management system in order to recommend approval or reapproval. Onsite evaluation s are carried out by a team consisting of OSHA staff acting in a non-enforcement capacity and other qualified team members.
     
  2. Preparation for Onsite Evaluations
     
    1. Scheduling Onsite Evaluations.  Onsite evaluations must be scheduled according to the priorities described in Chapter 5.IV.A. For new applicants, an onsite evaluation must be conducted within 6 months of the receipt of a completed application. For participants, onsite evaluations must be conducted as follows:
       
      1. Star Participants.  The first evaluation must be conducted between 30 and 42 months following initial approval. Thereafter, onsite evaluations must be completed within 60 months of the preceding onsite evaluation.
         
      2. 1-Year Conditional Star Participants.  The onsite evaluation must be conducted within 15 months (90 days plus 1 year's experience operating at Star level)after the site was placed on conditional status.
         
      3. Merit Participants.  The first onsite evaluation must be conducted 18 to 24 months fol­lowing initial approval (18 months is preferred).  If the site is reapproved at the Merit level, another onsite evaluation must be performed at the end of the site's Merit term.
         
      4. Star Demonstration Program Participants. The frequency of onsite evaluations for a Star Demonstration Program participant is every 12 to 18 months.
         
      5. Scheduling Exceptions
         
        1. Onsite evaluations must be conducted earlier than normal scheduling requirements when:
           
          • Significant changes have occurred in management, process(es), or product(s) that may require evaluation to ensure the site is maintaining a VPP quality safety and health management system.
             
          • OSHA has learned of significant problems at the site, such as increasing injury and illness rates, serious deficiencies described in the site's annual evaluation of its safety and health management system, or deficiencies discovered through OSHA enforcement activity resulting from an employee complaint, fatality, catastrophe, or other event.
             
        2. An onsite evaluation may be conducted earlier when requested by a site.
           
    2. Arrangements with the Site.  Arrangements for the onsite evaluation must be coordinated by the team leader, who must contact the applicant or participant (site represen­tative) to:
       
      1. Set the date for the onsite evaluation and explain the onsite evaluation process.
         
      2. Inform the site represen­tative of the documents that must be reviewed by the onsite evaluation team.  OSHA 300 log s may be requested in advance of the onsite evaluation, if appropriate.
         
      3. The VPP Manager or team leader must inform the employer if a Special Government Employee (SGE) will be used as a member of the Onsite evaluationteam. The employer must agree with this arrangement.
         
      4. Employee Representation.  Where collective bargaining agents are involved, the team leader must tell the site representative that such agents must be in­cluded in the initial and closing conferences and allowed the opportunity to accompany the onsite evaluation team on the site walkthrough. Similar employee involvement must be encouraged at non-collective bargaining sites.
         
      5. Medical Access Order (MAO). The VPP Manager or team leader must prepare and submit a Medical Access Order (MAO) Request Form to the OSHA Office of Occupational Medicine. This form can be downloaded electronically on the OSHA Intranet web page at www.osha.gov/SLTC/medicalaccessorder/index.html.  The VPP Manager must then direct the applicant or participant to post the MAO in a prominent place at the worksite for at least 15 working days prior to the onsite evaluation.

        If the site did not receive the MAO prior to the onsite evaluation, the team leader must direct the applicant or participant to post a copy immediately after the opening conference. The posting must include a notice advising employees to inform site management of any objection to their medical records being reviewed, in confidence, by OSHA employees.
         
    3. The Onsite Evaluation Team
       
      1. Team Composition.  Team composition is based on the size of the site and nature of the process, and must include at least (a) through (c) below.
         
        1. Team Leader.
           
        2. Safety Engineer or Safety Specialist.
           
        3. Industrial Hygienist.
           
        4. Backup Team Leader.
           
        5. Additional Safety or Health Specialists, including others with knowledge and skills appropriate to the site.
           
        6. Special Government Employees (SGEs).
           
          • SGEs can comprise no more than 50% of the team.
             
          • Refer to TED 8.3, "Policies and Procedures Manual for Special Government Employee Special Government Employees" (SGE) Activity..." for guidance on selecting and requesting an OSHA SGE.
             
        7. Star Demonstration Program Coordinator. A Star Demonstration Program coordinator from the National Office may participate in Star Demonstration Program onsite evaluations, as requested.
           
      2. Selection of the Team.  The team leader must formally request team members. This may be done by e-mailing the proposed onsite evaluation schedule to OSHA Area Directors and SGEs.
         
        1. Basic Qualifications.  All team members must have at least the following:
           
          • Thorough knowledge of VPP policy.
             
          • OSHA Course 245, the SGE course (required of SGEs), or other formal classroom training in evaluating safety and health management systems.
             
          • Working knowledge and understanding of safety and health management systems.
             
          • In addition, at least one of the OSHA employees (not including SGEs) on the team must have safety and health expertise.
             
        2. Team Leader. The team leader must meet the qualifications in a. above, plus have experience on three onsite evaluations, including once as a team member, once as a backup team leader, and once as a team leader in training (with a qualified team leader as backup team leader).
           
        3. Compliance Officers. OSHA personnel whose current duties include en­force­ment responsibilities in the Area Office having jurisdiction over the site may be assigned to an onsite team under the following circumstances:
           
          • Such personnel are assigned to temporary duty with the Regional Office.
             
          • Such personnel are not permitted to subsequently engage in enforcement activity at the worksite for the following 5 years or until the site is no longer a VPP site, whichever comes first.
             
      3. Preparing the Onsite Evaluation Team
         
        1. In Advance. The team leader must supply the team with the following information in advance of arrival at the worksite to be evaluated.
           
          • VPP History. For new applicants, team members must be given relevant sections of the application and most recent self-evlauaiton.    For current participants, team members must be given a copy of the site's last onsite evaluation report. Ensure that any Merit or 1-Year Conditional goals to be evaluated are provided.   
             
          • Inspection History. Team members must be given the inspection history and a summary of past interactions between the applicant and OSHA.
             
          • Any Documents Obtained with the Application.  If any records were submitted in advance of the onsite evaluation, these should be shared with team members.
             
        2. Preparation Required of Onsite Evaluation Team Members. In advance of the onsite evaluation, team members must prepare in the following ways:
           
          • Review. When feasible, team members must carefully review the application and any previous onsite evaluation reports.
             
          • Onsite Evaluation Report Format. Team members must familiarize themselves with the onsite evaluation report format to ensure they understand what information they will be responsible for obtaining during the onsite evaluation. [See Appendices E and F.]
             
          • Interview  Questions. Team members must careful­ly review the interview questions in preparation for conducting onsite interviews. [See Appendix G.]
             
          • Personal Protective Equipment (PPE). Team members must equip themselves with any PPE, such as safety shoes and safety glasses, required for the onsite evaluation (unless they have been informed that PPE will be provided at the site).
             
        3. Onsite.  Once the team has arrived at the location, the team leader must hold a strategy meeting with all team members to prepare the team for the onsite evaluation and to make assignments.
           
  3. Conducting the Onsite Evaluation. The three primary methods of evaluation must be document review, walkthrough, and interviews.  Additional activities that must occur are the opening conference, daily briefings, report preparation, and closing conference.    The onsite evaluation team must evaluate each element and sub-element of the safety and health management system and VPP requirements as described in Chapter 3.  At the conclusion of the onsite evaluation, the onsite evaluation team must recommend to the Regional Administrator whether the site is suitable for participation or continued participation in VPP, and at what level of participation.
     
    1. Opening Conference. The opening conference with the employer and employee representatives will set the stage for the onsite evaluation, letting everyone know what to expect and what assistance will be needed. During this session the onsite evaluation team should be able to get a sense of the extent of commitment that exists at the work site. The team leader must convey the following information:
       
      1. Balanced Approach. Describe OSHA's view of the Voluntary Protection Programs and VPP's importance to OSHA's approach to balancing cooperative programs and enforcement.
         
      2. Purpose.  Clearly state the purpose of the onsite evaluation.
         
      3. Full Disclosure. Indicate that the onsite evaluation team expects the site will adhere to the signed full disclosure assurances submitted with the application.
         
      4. Schedule.  Outline the schedule for the onsite evaluation.
         
      5. Interviews. State that arrangements must be made to conduct private interviews with supervi­sors, union representative(s), maintenance personnel, recordkeepers, occupational health staff, and randomly selected employees, including contractor employees (if any).
         
      6. Responding to Hazards.  Explain the differences between the walkthrough and an enforcement or consultation visit, as well as the hazard correction requirements detailed in V. below.
         
      7. Status. Explain how the onsite evaluation team will keep the site representative updated daily on the progress of the onsite evaluation. When the onsite evaluation is completed, the VPP onsite evaluation team will discuss its findings with the site representative so that the recommendations are clearly understood.
         
      8. Employee Rights. Outline the rights of employees under the OSH Act and, for Federal agency employees, 29 CFR 1960.
         
    2. Document Review. The applicant's or participant's written safety and health management system must describe how each of the requirements outlined in Chapter 3 are being met. The documents listed below are part of the written safety and health management system. The documentation of the system must be site specific. On a case-by case basis for small businesses, some documentation need not be in writing, provided all employees have the same clear understanding of the particular policy. This will be verified by the onsite evaluation team.
       
      1. Injury/Illness Data. The following documents must be reviewed to verify that the site is properly and accurately recording injuries and illnesses.
         
        1. Summary of Occupational Injuries and Illnesses.
           
          • Review data for the most recent complete 3-year period, current year-to-date for the site, and any applicable contractors. 
             
          • Recalculate the total case incidence rate (TCIR) and the days away, restricted, and/or transfer case incidence rate (DART rate) using the instructions found in Appendix A.
             
        2. Incentive Programs.  The review of incentive programs must focus on ensuring that any incentive programs in operation at the site are not based solely on providing awards to employees for the reduction or absence of safety or health incidents. Instead, these programs should be innovative, positive, and promote safety awareness and worker participation in safety-related activities. The onsite evaluation will focus on the incentive program's potential impact on the accuracy of reporting, injury and illnesses data.
           
        3. First Reports of Injury.
           
        4. Accident and Near-Miss Investigation Reports. Verify that all accidents and near-misses are properly reported and investigated, and that all injuries and illnesses resulting from an accident are properly recorded.
           
        5. First-Aid Reports.  Verify that the first-aid incidents are properly categorized as such, and are not causing possible over-reporting. 
           
        6. Team-selected medical surveillance reports, such as audiometric testing records, respirator fit-test records, etc. [See II.B.4. above.]
           
        7. Any cause for under- or over-reporting, such as lack of training in OSHA recordkeeping requirements, an incentive program, mis-diagnosis of an injury or illness, etc., must be addressed.  Discuss any discrepancies or omissions with the recordkeeper. Determine corrective actions, and recalculate the 3-year TCIR and DART rate if necessary.
           
      2. Management Leadership
         
        1. Management's statement of commitment to safety and health.
           
        2. Written goals and objectives for safety and health.
           
        3. Annual safety and health evaluation.
           
        4. Job descriptions.
           
        5. Performance standards and appraisals (these reviews must be performed in a manner that protects confidentiality and anonymity).
           
        6. Resource documents including budget projections.
           
      3. Employee Involvement
         
        1. Safety and health committee minutes, if applicable.
           
        2. Self-inspection forms and records, accident investigations, hazard analyses, and employee reports of hazards.
           
        3. Documents attesting to union support if applicable.
           
      4. Worksite Analysis
         
        1. Baseline safety and industrial hygiene surveys.
           
        2. Self-inspection forms and records.
           
        3. Health hazard assessment and monitoring records (such as industrial hygiene surveys, sampling results, exposure calculations, and summary reports).
           
        4. Hazard analysis forms and reports.
           
        5. Accident/incident investigations to verify that all causes of an accident/incident are identified, undue blame or reprisal is not placed on employees, and recommendations for preventing future occurrence are listed.
           
        6. Hazard reporting system for employees.
           
        7. Annual safety and health management system evaluations, site audits, and when needed to demonstrate that VPP criteria are being met, corporate audits that a site voluntarily chooses to provide in support of its application.
           
        8. The system for managing contractor safety and health, and related documents.
           
        9. Trends analysis reports of injury/illness, accidents, employee hazard reports, etc.
           
      5. Hazard Prevention and Control
         
        1. Hazard control programs required by OSHA standards (such as Lockout/Tagout, Hazard Communication, Respiratory Protection, Process Safety Management, Bloodborne Pathogens, Confined Space Entry, Emergency Response, etc.).
           
        2. Preventive maintenance program, maintenance schedule, and examples of work orders.
           
        3. Engineering studies, to verify that any over-exposures to health hazards were adequately addressed and controlled following the hierarchy of controls.
           
        4. Hazard correction/work order and tracking reports.
           
        5. Safety rules, examples of safe work procedures and practices.  
           
        6. Disciplinary system, including a review of policy.
           
      6. Training
         
        1. New employee and contractor orientation curricula.
           
        2. Training curricula related to required OSHA standards.
           
        3. Additional safety and health training curricula to verify that personnel performing hazard analysis and accident investigation are trained to do so. Also to verify that information from hazard analysis, accident reports, etc., are incorporated into training.
           
        4. Training attendance records and tracking method.
           
      7. Any other related documents that support and verify that VPP requirements are being met.
         
    3. Walkthrough
       
      1. Scope. The onsite evaluation team must walk through the site to understand the type of work performed and to gain a sense of overall work condi­tions.   An orientation tour is conducted with the entire onsite evaluation team on the first day of the onsite evaluation.  The remainder of the onsite evaluation must include a walkthrough of the entire worksite, unless the size of the site or nature of the process does not allow for it, in which case a representative sampling of all major operating areas and supporting activities must be covered.
         
        1. Contractors.  The onsite evaluation team must review areas where work is performed by contract workers to ensure that they are provided equally effec­tive protec­tion.
           
        2. Hazard Analysis.  The safety and health specialists must examine the site in sufficient detail to understand the types of hazards that exist and to determine that such hazards are controlled systematically by the safety and health management system.
           
        3. Problem Areas.  The onsite evaluation team must examine areas where site reports of the following indicate that uncontrolled hazards may be present:
           
          • Baseline hazard analysis.
             
          • Trends in injuries or illnesses.
             
          • Employee complaints or concerns.
             
          • Recurring accidents.
             
          • Health hazard surveys.
             
          • Site self-inspections.
             
        4. Informal Interviews.  During the walkthrough (and at other times, as appropriate) the onsite evaluation team must question randomly selected employees (including contract employees) privately at their work stations about prescribed work proce­dures, hazards to which they may be exposed, and their knowledge of how to protect themselves from hazards, including how to use and main­tain their personal protec­tive equipment. The team must keep track of the number of employees interviewed, but employee names and addresses must not be recorded. [See Appendix G.]
           
      2. General Industry Safety and Health Review
         
        1. The safety specialist/engineer and industrial hygienist must:
           
          • Follow the process flow where possible.  Focus on areas where document review and/or interviews indicate that uncontrolled safety and health hazards may be present.
             
          • Look for evidence that hazards are appropriately controlled following the hierarchy of controls. [See Chapter 3.II.C.3.b.]
             
          • Identify and note any uncontrolled hazards that must be corrected. Ensure that a responsible member of management takes notes, as well, and agrees on a reasonable time period for correction.
             
          • If uncontrolled hazards are present, determine the causative deficiencies in the safety and health management system.
             
          • Relate hazards seen in the work areas to safety and health management system improvements that would control the hazards and prevent recurrence.
             
          • Inform the team leader of findings at the end of each day.
             
      3. The safety specialist/engineer and industrial hygienist must follow the procedures above and make every attempt to view all areas of construction covered by the application.  If the entire site is not viewed, ensure that all types of construction work in progress are seen.
         
      4. Process Safety Review.  A process safety review is required at all worksites producing or using highly hazardous chemi­cals.  Where possible, the review must be conducted in accordance with the Process Safety Management (PSM) Directive by a Level I trained Process Safety Man­agement Spe­cialist who must:
         
        1. Select at least one complete process and follow the process flow.
           
        2. Review process hazard analysis and operating pro­cedures.
           
        3. Check process lines as necessary to verify documented system protection.
           
        4. Ask questions concerning system failure procedures during informal interviews with appropriate operator, maintenance, and contract personnel.
           
        5. Formally interview maintenance personnel using questions in Appendix G.VI. and in the PSM Directive (OSHA Instruction CPL 2-2­.45A).
           
        6. Review training records.
           
        7. Look for evidence that all considerations have been addressed and that management has identified and is controlling all hazards and potential releases.
           
        8. Note any problem areas that require improvement; relate these problems to documents reviewed concerning process safety and training; and note program improvements needed, if any, to enhance the management systems.
           
    4. Interviews.
       
      1. Formal Interviews. Private formal interviews are conducted in a private area away from the workstation to ascer­tain the extent of safety and health involvement and program awareness of managers, supervisors, employees, and contractors.
         
      2. Informal Interviews. Informal interviews are conducted at employees' workstations during the walkthrough and at other times, as appropriate. [See C.1.d. above.]
         
      3. Persons to Be Interviewed
         
        1. Managers.  A representative number of managers must be interviewed to ascertain the depth of management leadership in the safety and health management system.
           
        2. Supervisors.  A representative number of supervisors must be interviewed.
           
        3. Line Employees. Conduct employee interviews with those individuals involved in the actual process or production at the site to verify aspects of the safety and health management system.
           
        4. Occupational Health Care Professionals.
           
        5. Maintenance Personnel. Maintenance personnel should be interviewed. At chemical plants making or using highly hazardous chemicals, they must be interviewed.
           
        6. Recordkeepers.  The person responsible for keeping injury and illness records must be interviewed to ensure that records are properly kept and that the recordkeeper understands the requirements and interpretations.
           
        7. Contract Employees
           
          • Temporary Employees. Temporary employees who are su­pervised by the applicant company's employees must be selected for formal interviews to es­tablish the quality of safety and health protection afforded them.
             
          • Other Contract Employees.  Contract employees who work under their own company's supervision must be interviewed to determine whether they are aware of all the hazards to which they are exposed, and whether they are protected by a safety and health management system equal in quality to the applicant's. Representatives from each craft should be interviewed, where possible.
             
      4. Selecting Persons to be Interviewed.  The selection of persons to be interviewed must be made by the onsite evaluation team, not by the employer.  The team must be flexible in choosing the most reasonable method of selection, given the characteristics of the site and any concerns expressed by the employer. Methods for selecting employees for interviews include:
         
        1. Identifying the most hazardous areas, selecting employees at random from those areas, and conducting informal interviews in these areas during the walkthrough.
           
        2. For formal interviews, the team leader may select appropriate employees at random from an employee roster or using a random selection protocol.
           
      5. Scheduling Formal Interviews.  Formal interviews lasting at least 15 minutes must be conducted in a manner that minimizes disruption.  The number of formal interviews is up to the team leader, based upon the size and nature of the site and whether a new applicant or current participant is being evaluated.
         
      6. Use of Interview Questions
         
        1. The reviewers must assure each interviewee that responses will be treated confidentially, and that no single answer they give will influence the team's recommendation. [See Appendix G for suggested interview questions.]
           
        2. Notes (without names or addresses) should be made of employees' responses to interview questions and other comments. These notes later will be used to support the team's recommendation and the Agency's decision.
           
  4. Discussion of Findings
     
    1. Daily Debriefings.  At the end of each day, the onsite evaluation team must meet privately to discuss members' findings.  The team leader is responsible for organizing the findings and conducting daily briefings with the site management and employees.
       
    2. Uncontrolled Hazards
       
      1. Informing Site Management.  As hazards are found and discussed during the walkthrough, the onsite evaluation team must add them to a written list of the uncontrolled hazards identified. This list will be used when the team briefs site management at the end of the day.
         
      2. Hazard Correction.  OSHA expects that every effort will be made by the site to correct identified hazards before the closing conference.  If hazard correction cannot be accomplished before the conclusion of the onsite evaluation, the onsite evaluation team and site management must discuss and agree upon correction methods and time frames.
         
        1. 90-Day Items.  The site may be given a maximum of 90 days to correct uncontrolled hazards, as long as interim protection is provided. These "90-day Items" must be corrected before the final onsite evaluation report can be processed. [See also Section XII.]

          Management must provide the team leader with a signed letter indicating how and when the correction will be made. The team leader may decide to return to the site to verify correction.
           
        2. If after repeated attempts to reach agreement, site management refuses to correct a situation that endangers the safety and health of employees, that situation must be referred to the Assistant Secretary for review and enforcement action, if necessary.
           
    3. Deficiencies in the Safety and Health Management System. Where the team detects deficiencies in the safety and health management system, even when physical hazards are not present, the onsite evaluation team must document these deficiencies as goals for correction, recommendations for improvement, or both.
       
      1. Goals. If the system deficiency is a requirement for VPP at the Star level, it must become the subject of a goal (either Merit or 1-Year Conditional). Implementation of goals is mandatory for VPP participation.  Time frames, interim protection, and methods of achieving goals must be discussed and agreed to with site management.
         
      2. Recommendations.  If improvement of the system deficiency is not necessarily a requirement for VPP, but will improve worker safety and health at the site, the improvement must be a recommendation. Implementation of recommendations is encouraged but is not mandatory for VPP participation.
         
  5. Final Analysis of Findings. When the documentation review, the walkthrough, and employee interviews have been completed, the onsite evaluation team must meet privately to review and summarize its findings.  The team leader must facilitate the discussion and assist the team members in drawing conclusions about the quality of the site's safety and health management system, based on their findings. In analyzing their findings, the onsite evaluation team must consider the following:
     
    1. Observations made in the work areas.
       
    2. The nature of injuries or illnesses recorded on the Summary of Occupational Injuries and Illnesses and reflected in the First Report of Injury data.
       
    3. The degree to which implementation of written programs has been verified.
       
    4. Responses to formal and informal interviews.  The reviewer must look for an overall pattern in the perceptions of managers, supervisors, employees, and contract employees regarding worksite conditions and the safety and health management system. Employee responses that are supported by informa­tion ob­tained by document review, observation, or other employee interviews should carry the most weight.
       
    5. When the applicant or participant site is very small or in a low-hazard industry, some of the requirements for formality may be relad (for example, informal programs or scaled-down documentation), providing that a strong case can be made to support the effectiveness of the safety and health management system.
       
  6. Recommendations for First-time Participation In the final private meeting prior to the closing conference, the onsite evaluation team must reach consensus on their recommendation for program participation. If they cannot reach consensus, they should consult with the Regional or National Office or both.
     
    1. General Applicants.  The onsite evaluation team must decide among the following recommendations:
       
      1. Star. When the onsite evaluation team finds that an applicant's safety and health management system meets all VPP requirements at Star quality, a recommendation for participation in the Star Program must be made.
         
      2. Merit.
         
        1. When the onsite evaluation team finds that an applicant's safety and health management system falls short of Star quality in one or more elements requiring long-term goals for correction, but does meet the requirements for Merit participation [See Chapter 3.III.], a recommendation for one 3-year (maximum) term of Merit Program participation must be made.
           
        2. Merit Goals.  The team leader, with input from the team members and site representatives, must develop Merit goals that relate to deficiencies in Star quality discussed in the onsite evaluation report. [See Chapter 3.III.C.]
           
      3. Withdrawal of Application. The onsite evaluation team must recommend withdrawal of the application if the site does not meet the requirements for either the Star or Merit Programs.
         
    2. Star Demonstration Program Applicants. The onsite evaluation team must determine whether employees are being protected by a Star quality program. If they are not receiving such protection, the onsite evaluation team must recommend withdrawal of the application. If employees are receiving Star quality protection, the team must decide among the following alternatives:
       
      1. The applicant has met all the requirements for the Star Demonstration Program and, where applicable, the special aspects of the site's safety and health management system are suitable for incorporation into Star requirements, if they prove successful.  The team must recommend approval to the Star Demonstration Program.
         
      2. The applicant has met all the requirements for the Star Program, and the onsite evaluation team has determined that no additional requirements are needed for this industry, part of industry, or operation.  The team must recommend approval to the Star Program without fur­ther testing or demonstration.
         
      3. The applicant needs to make some changes for its participation in the Star Demonstration Program to be useful.
         
  7. Recommendations for Participants The onsite evaluation team must decide among the following recommendations:
     
    1. Star Participants
       
      1. Recommendation for Star Reapproval.  When the onsite evaluation team has judged that the site's safety and health management system continues to meet all Star Program requirements, the team must recommend reapproval to the Star Program upon satisfactory completion of any 90-day items.
         
      2. Recommendation for 1-Year Conditional.  The onsite evaluation team must recommend conditional Star Program participation for 1 year (dating from the end of the 90-day deferral period) when the site meets the conditions of both a. and b. below:
         
        1. The participant's safety and health management system has fallen below Star quality in one or more requirements and those requirements can be satisfactorily met during a 90-day deferral of decision.
           
        2. The site does not meet the requirement of having 1 year's experience operating at Star quality.
           
        3. 1-Year Conditional Goals. The team leader, with input from the team members and site representatives, must establish goals to be accomplished in order for the site to return to full Star status. The 1-Year Conditional goals must meet the same criteria listed for Merit goals. [See VII.A.2. above.]
           
      3. 3-year Rates Above the National Average
         
        If: Then:
        The site's 3-year rates are above the national average, and an onsite evaluation has been conducted. The site must be placed on 1-Year Conditional status. The RA may also allow a 2-year rate reduction plan to provide the site more time to reduce its rates to below the national average.
        The site's 3-year rates are above the national average, and an onsite evaluation has not been conducted. The site must be placed on a 2-year rate reduction plan approved by the RA.


        In both cases, OSHA and the participant must determine the safety and health management system deficiencies related to the high rates.  The 1-Year Conditional goals, rate reduction plans, or both must address the deficiencies, correction methods, and time frames. Quarterly reports to OSHA are due during the year.
         
      4. Withdrawal. The onsite evaluation team must recommend withdrawal from VPP if a Star participant is deficient in one or more requirements and any of the following apply:
         
        1. Agreement cannot be reached on correction.
           
        2. Correction cannot be accomplished within a 90-day deferral of decision.
           
        3. The participant has not made good faith effort on agreed‑upon corrections.
           
    2. 1-Year Conditional Star Participants
       
      1. Lifting of 1-Year Conditional Status. If all 1-Year Conditional goals have been met and the safety and health management system has been restored to Star quality, then the onsite evaluation team must recommend lifting the 1-Year Conditional status and returning the site to full Star Program participation.
         
      2. Withdrawal. If all 1-Year Conditional goals have not been met, the onsite evaluation team must recommend that the site withdraw from the program. A former Star participant cannot be returned to the Merit Program.
         
    3. Merit Participants
       
      1. Recommending Approval to the Star Program. When the onsite evaluation team has judged that the Merit participant has met all agreed-upon goals, including Star requirements, the team must recommend approval to the Star Program. This may occur at the regularly scheduled onsite evaluation or earlier if the participant requests that OSHA return to the site ahead of schedule.
         
      2. Merit Reapproval
         
        1. When the First 3-Year Merit Term Has Not Expired. If a Merit participant is progressing satisfactorily, and the site has agreed with OSHA on resolution of any problems and is acting in good faith, then the team must recommend reapproval at the Merit level. Because the first term has not expired, the Regional Administrator can approve the onsite evaluation team's recommendation for reapproval.
           
        2. When the First 3-Year Merit Term Has Expired. If, due to unanticipated unique circumstances, a Merit participant has not met all agreed‑upon goals or Star requirements, then the onsite evaluation team may recommend a second term in Merit, with new goals. Second terms in Merit are very rare and must be approved by the Assistant Secretary.
           
      3. Automatic Termination Automatic termination must occur if a Merit participant has not met all agreed‑upon goals, including Star requirements, and one of the following situations exists:
         
        1. The first 3-year term has expired and there are no extenuating circumstances.
           
        2. The site has already had a second Merit approval.
           
        3. The first 3-year term has not expired, but the participant either is not making a good faith effort to achieve goals, or has serious problems and has either refused or failed to resolve them in a reasonable period of time.
           
    4. Star Demonstration Programs.  The onsite evaluation team must assess the effectiveness of the alternate criteria being used, in addition to the criteria used to measure Star participation.
       
      1. When the onsite evaluation team judges that the site's safety and health management system continues to meet all requirements at Star level, the team must recommend continuation as a Star Demonstration Program participant upon satisfactory completion of any 90-day items.
         
      2. If the participant has failed to maintain Star level, the team must recommend that the participant be asked to withdraw.
         
      3. The Regional Administrator must review the onsite evaluation report and recommend to the Assistant Secretary one of the following:
         
        1. Reapprove participation in the Star Demonstration Program;
           
        2. Recommend changes to the Star Program to include the alternate measures being demonstrated; or
           
        3. Terminate the Star Demonstration Program due to lack of tangible results.
           
  8. Closing Conference. The findings of the onsite evaluation team, including its recommendation to the Regional Administrator, must be presented to site management and appropriate employee representatives before the team leaves the site. During the closing conference, the team leader must review:
     
    1. Findings.  Review the team's findings, addressing each of the major VPP elements as outlined in Chapter 3. Also review the injury and illness rates and how they compare to the industry national average.
       
    2. The Onsite Evaluation Team's Recommendation to the Regional Administrator. Discuss and support the onsite evaluation team's recommendation to the Regional Administrator so that the applicant or participant has a clear idea of how the site measures up to the requirements of VPP.
       
    3. 90-day Items. Review all uncorrected hazards, expected correction methods, and time frames.
       
    4. Goals.  Review 1-Year Conditional or Merit goals and time frames for correction.
       
    5. Recommendations.  Review any recommendations made by the onsite evaluation team for improvement of the site's safety and health management system.
       
  9. The Onsite Evaluation Report
     
    1. Purpose of the Report.  The onsite evaluation team must write a report documenting the onsite evaluation to substantiate the team's recommendation to the Regional Administrator and Assistant Secretary for approval or reapproval of the site in VPP. If the site is approved or reapproved, the report and worksheet will become an official record in the public file along with the application, and will provide baseline data for future evaluation purposes. The report must include the following information:
       
      1. Verification of the application information submitted by an applicant.
         
      2. Documentation of the qualifications of the site for participation.
         
    2. Writing the Onsite Evaluation Report.  All attempts must be made to complete a draft report before leaving the site. The draft report must reflect the consensus of the onsite evaluation team. Each team member must complete the sections of the onsite evaluation report assigned by the team leader, following the format in Appendix E.
       
      1. Review of the Draft Onsite Evaluation Report Once the draft is complete, the team must review it and make any needed changes.
         
      2. Presentation of the Draft Onsite Evaluation Report.    If the draft onsite evaluation report is completed onsite, the draft must be presented at the closing conference. If the draft report is not presented at the time of the closing conference, the team leader must advise the applicant approximately when the draft report will be available for review.
         
      3. Site's Comments and Revised Draft Report.  After the draft report is presented to the site, the team leader must allow the applicant or participant 30 days to review and comment on the draft report. A revised version of the onsite evaluation report must be prepared by the team leader following receipt of the site's comments.
         
    3. Star Demonstration Program Reports.  Onsite evaluationreports of Star Demonstration Program sites must describe in detail the departures from Star requirements and the rationale for their use, and explain how the alternatives provide Star quality employee protection.
       
    4. Completing the Final Onsite Evaluation Report. The team leader must compile the final report and submit it to the VPP Manager and/or Regional Administrator for processing.
       
    5. Deferral of Final Onsite Evaluation Report Due to Uncorrected Hazards. The final report may be deferred from submission to the Regional VPP Manager, Regional Administrator, or both if uncorrected hazards are still present at the site after the closing conference or after the team leaves the site.
       
    6. Deferral Period. The final report may be deferred for up to 90 days from the closing conference or until the site has corrected all uncontrolled hazards identified by the onsite evaluation team, whichever occurs first.
       
  10. Correction of Remaining Hazards
     
    1. Hazard Correction Plan.  Within a week of the closing conference, the site must document in a letter to the VPP Manager or his/her designees any hazard correction plans (this can be the list of 90-day items) and dates that have been agreed to. This letter will be kept on file until a correction letter [see XII.A.] is received.
       
    2. Verification of Hazard Correction.
       
      1. When the site has corrected the hazards, it must send a signed letter to the VPP Manager or his/her designee indicating how and when the corrections were made.
         
      2. The team leader, VPP Manager, or Regional Administrator may decide to conduct a return visit to the site to verify the corrections. The findings of this visit must be written in a correction letter and kept on file.  The correction letter may be made available to a Onsite evaluation team at a later date.
         
    3. Finalizing the Onsite Evaluation Report. When hazard correction has been verified, the team leader must remove any lists of uncorrected hazards from the final report before submitting the report to the Regional Administrator.
       
    4. Failure to Correct Hazards by End of Deferral Period. If the deferral period has expired, the site has not corrected the hazards, and the Regional Administrator has made every attempt to resolve the problem in a manner consistent with the cooperative spirit of the VPP, then:
       
      1. The VPP Manager or Regional Administrator must inform the applicant or participant that the matter is being referred to the Assistant Secretary. The referral, detailing the hazard(s) and the cooperative efforts made by the Region to achieve resolution, must be sent to DCSP for concurrence.
         
      2. The Assistant Secretary must review the situation and make a decision regarding enforcement action. If the Assistant Secretary decides that all cooperative efforts have failed and that OSHA must ensure hazard correction, he/she must send a memorandum to the Regional Administrator instructing the Regional Administrator to inform the appropri­ate Area Office to take enforcement action. [See Chapter 8.]
         
      3. For withdrawal, termination, and reapplication procedures, refer to Chapter 7.IX.

 

 

 

 

 


 

 

 

 

 

 

Chapter VII
Participation Decisions and Management

 

 

 

  1. Report Processing After an onsite evaluation has been conducted and the onsite evaluation report has been completed, the VPP Manager must coordinate clearance of the report through the appropriate Regional Office.
     
    1. Final Decision on Participation. All decisions are based on the onsite evaluation, final evaluation report, and recommendations.
       
      1. In each of the following cases, the Regional Administrator must recommend an action to the Assistant Secretary, and the Assistant Secretary must decide on the course of action regarding:
         
        1. Approval of new participants,
           
        2. Approval from the Merit Program to the Star Program,
           
        3. Approval of Star Demonstration Programs and participants,
           
        4. Lifting of a Star participant's 1-Year Conditional status,
           
        5. Approving a second term to Merit participants,
           
        6. Withdrawal or termination of participation.
           
      2. In each of the following cases the Regional Administrator has responsibility to:
         
        1. Reapprove (or not approve) participation in the Star program.
           
        2. Reapprove (or not approve) participation in the Merit Program if the first Merit term has not expired.
           
        3. Place a Star participant on 1-Year Conditional status.
           
        4. Application withdrawal.
           
    2. Transmittal to DCSP.  No later than 30 working days following the completion of the final onsite evaluation report, the Regional Administrator must transmit the following documents, electronically and as hard copy, to the Director of Federal-State Operations for concurrence.
       
      1. The final onsite evaluation report.
         
      2. A transmittal memo making clear the Regional Administrator's recommendation or decision for approval or reapproval. It must contain:
         
        1. Noteworthy aspects of the site's safety and health management system that the DCSP can highlight for the Assistant Secretary.
           
        2. The name, title, and address of the person to whom the approval letter should be addressed.
           
        3. The name of the designated contact person, if this person is not the VPP Manager.
           
        4. Where there are collective bargaining agents at the site, the names and addresses of these agents.
           
        5. In the case of a reapproval, the approval letter that was sent from the Regional Administrator to the site, following the format of the Assistant Secretary's letter. [See Appendix H]
           
    3. DCSP Review
       
      1. Pertinent site information must be entered into the National VPP Automated Data System (VADS).
         
      2. A technical and editorial review must be conducted by experienced DCSP staff.
         
      3. The VPP Manager must be notified if revisions or additions are needed.
         
  2. Preparing A Recommendation Package

    DCSP must prepare and submit a recommendation to the Assistant Secretary within 10 working days of receipt of the onsite evaluation report and signed Regional Administrator's memorandum. It must contain the following documents:
     
    1. A cover memorandum, drafted by the DCSP staff, that briefly sket­ches the applicant company's background and provides injury and illness rates, onsite evaluation team findings and recommendations, DCSP concurrence or nonconcurrence, and a request for action on the report recommendation.
       
    2. The onsite evaluation reports that recommend approval or lifting of a site's 1-Year Conditional status. (Onsite evaluationreports recommending reapproval are sent to the site by the Regional Administrator with his/her reapproval letter, and therefore are not sent to the site again by DCSP).
       
    3. A letter drafted by the DCSP staff, from the Assistant Secretary to the company official listed on the RA memo, notifying the company of OSHA's decision for VPP participation.  At sites with collective bargaining agents, copies of the letter must be prepared for these officials as listed on the Regional Administrator memorandum. The letter must be one of the following two types:
       
      1. Approval Letter.  For initial approvals, approval from the Merit Program to the Star Program, and lifting of 1-Year Conditional status, the letter must state that the Assistant Secretary concurs with the Regional Administrator's recommendations for participation, and is pleased to either approve the site into the VPP, approve the site into Star, or return the site to full Star status.
         
      2. Congratulatory Letter.  For reapproval, the letter must state that the Assistant Secretary is pleased to learn that the Regional Administrator has reapproved participation in the VPP.
         
    4. Congressional letters to the appropriate members of congress notifying them of the VPP participant.
       
  3. Final Onsite Evaluation Report and Participation Date. When the final onsite evaluation report is sent to the site with the Assistant Secretary's letter announcing the participation decision, approval becomes final.
     
    1. For new approvals, approvals from the Merit Program to the Star Program, lifting of a Star participant's 1-Year Conditional status, or the approval of a second Merit term, the effective date is the date the Assistant Secretary's approval letter is signed.
       
    2. For reapprovals, or placing a Star participant in 1-Year Conditional Star status, the effective date is the date the Regional Administrator's reapproval letter is signed.
       
  4. Notification
     
    1. When the Assistant Secretary's approval or congratulatory letter is signed, DCSP must immediately:
       
      1. Mail the letter and the final onsite evaluation report to the site. This mailing constitutes official notification that the site has been approved for participation in VPP.
         
      2. Notify the VPP Manager.
         
    2. Upon learning from DCSP of the approval of a site, the VPP Manager must:
       
      1. As a courtesy, inform the company of the approval and its effective date.
         
      2. Inform the site that an official letter of approval or congratulations will be sent by mail immediately, and that the award certificate and flag will be available in approximately 1 month.
         
      3. Inform the site that an award ceremony may be held and that OSHA officials may be requested to make a formal presentation.
         
  5. Award Certificates, Plaques, and Flags. Newly approved sites are awarded a certificate and flag. Reapproved sites are awarded a plaque.
     
    1. The VPP Manager must arrange for the printing and awarding of plaques for reapprovals. Plaques are awarded as follows:
       
      If it is the site's:
       
      ...and the site has been in the Star program for:
       
      ...then order the following type of plaque:
       
      1st award 3-5 years brown and gold
      2nd award 6-8 years green and gold
      3rd award 9-11 years blue and gold
      4th award 12-14 years maroon and silver
      5th award 15-17 years satin and silver
      6th award 18-20 years gold and silver
      7th award over 20 years gold and gold

       
    2. Flags. OSHA awards participants newly approved to a program a flag appropriate to that program. The VPP Manager must maintain an inventory of flags.
       
    3. Certificates.  The VPP Manager must arrange for the printing of the award certificate(s) for initial approvals.  DCSP must arrange for the award certificate(s) to be signed by the Assistant Secretary and forwarded to the Regional Administrator for presentation.
       
  6. Approval Ceremonies. Upon notification of approval, a site representative should contact the VPP Manager to schedule the ceremony.
     
    1. The Regional Administrator or the highest level Regional representative available must make the presentation. The Area Office Director may represent the Regional Administrator.
       
    2. The site may send an invitation to the appropriate Area Director, any Area Office personnel who were responsible for recruiting the site for VPP, as well as higher level OSHA officials. The onsite team may also be included on the invitation list. In addition, the VPP Manager should suggest other potential invitees such as local political officials, other area companies that might be potential VPP candidates, and local VPP liaison. If a site requests a National Office level OSHA representative or a specific official, the VPP Manager must relay that request to the DCSP in writing (email is acceptable).
       
    3. The VPP site may consult the Regional VPP staff for assistance with any press releases, and the VPP Manager should give the company names and telephone numbers of other VPP sites that have had good media coverage.
       
    4. It is highly encouraged that the Region issues a press release. [See Appendix H. for a sample].
       
  7. Withdrawal. Participants may withdraw of their own accord or be asked by OSHA to withdraw from the programs.  In either case, the VPP Manager must determine the cause of withdrawal and notify the Regional Administrator and DCSP of the reason and date of withdrawal.
     
    1. Participant Decides to Withdraw.  Any participant may choose to withdraw at any time after approval, following the procedures in C. below.
       
    2. OSHA Requests Withdrawal
       
      1. OSHA must request that a site withdraw from VPP if it is determined that the site is no longer meeting the requirements for VPP participation.
         
      2. When a Participant's Location Changes.
         
        1. If 75% or more of the employees remain with the employer, and the Regional Office jurisdiction remains the same, then the participant can maintain its VPP status, but must:
           
          • Submit a new letter of management commitment.
             
          • Submit a new self-evaluation including a comprehensive baseline hazard analysis
             
          • Receive a satisfactory OSHA onsite evaluation within 12 months (6 months is preferred).
             
        2. If fewer than 75% of the employees remain with the employer and/or the new location is under a different Regional Office jurisdiction, then the participant must withdraw and reapply.
           
    3. Withdrawal Process. The participant must write a letter addressed to the Regional Administrator and to the attention of the VPP Manager, stating that it is withdrawing from the program, with the reason(s) for withdrawal, effective on the date of the letter.
       
      1. The Regional Administrator must send the participant a letter acknowledging the withdrawal, with a copy to the Director of Federal-State Operations. The letter must also state:
         
        1. That the VPP flag and certificate are invalid and must no longer be used.
           
        2. That the company's application, onsite evaluation reports, approval letters, and annual evaluations will be removed from the public file.
           
        3. That the establishment must be returned to the programmed inspection list, if applicable, at the time of the next inspection cycle.
           
        4. That OSHA will consider the site's reapplication to VPP if and when eligibility requirements are met. [See IX. below.]
           
    4. Notification of Area Office. If applicable, the Regional Administrator must notify the appropriate Area Director that the withdrawn site is no longer participating in the VPP and must be returned to the programmed inspection list for the next inspection cycle.
       
  8. Termination. OSHA may terminate a site from the VPP for failure to maintain the requirements of the program. Except where employees appear to be at serious risk, termination by OSHA must occur only when all efforts for assistance have been exhausted.  An example is when OSHA has identified one or more serious prob­lems and recommended technologically feasible solutions, but the participant has refused.

    Termination may also occur when evidence exists that the trust and cooperation among labor, management, and OSHA, upon which approval was based, no longer exist, or when OSHA requests a site to withdraw and it does not.

    Other possible reasons for VPP participation ending include: a Merit term of approval has expired without a recommendation or approval for a second term; construction work has been completed; or resident contractor participation is no longer possible because the host site no longer participates in VPP. If a resident contractor leaves the hosting VPP participant site, the resident contractor will no longer be in the VPP.

    OSHA must handle the termination of a VPP participant as follows:
     
    1. Notice of Intent to Terminate. The Regional Administrator, through the VPP Manager, must notify DCSP, the participant, and union representative(s) in writing of OSHA's intent to terminate the site's participation in the VPP.
       
    2. Appeal Process. The participant has 30 days from the receipt of the notice to appeal the intent to terminate. It must provide to the Assistant Secretary, through the Regional Administrator, in writing, the reasons why it should not be removed from the VPP. Upon review of the site's justifications for continued participation, the Assistant Secretary in consultation with the Regional Administrator and DCSP must make the final decision.
       
      1. If the Assistant Secretary decides to terminate:
         
        1. Termination Package. The Regional Administrator through the VPP Manager must send all of the following to DCSP for concurrence:
           
          • A memorandum explaining the reason(s) for termination of participation.
             
          • Any documents supporting the decision that have not already been reviewed by DCSP staff.
             
        2. DCSP Concurrence. The Director of Federal-State Operations and the VPP staff must review the package and, after concurrence, transmit it to the Assistant Secretary along with a letter to the participant for the Assistant Secretary's signature. The letter must inform the participant of the ter­mination decision and its consequences [per VII.C.1. above] and the requirements for reinstatement.
           
        3. Notification of Termination. Once the Assistant Secretary has signed the termination letter:
           
          • DCSP must notify the VPP Manager immediately by telephone.
             
          • DCSP must notify the Regional Administrator by memorandum that the former participant must be returned to the programmed inspection list, if applicable, 30 days following the date of the termination letter.
             
          • The Regional Administrator must notify the Area Office immediately.
             
      2. If the Assistant Secretary finds the site's appeal valid, the site may continue in VPP.
         
  9. Reinstatement. Reinstatement requires reapplication. See table below for time frames.
     
    If: And: Then:
    An applicant withdraws its application or a participant withdraws from the program of its own accord. OSHA Inspection History conditions and Assurances are met [See Chapter 5]. The site can reapply at any time.
    An applicant withdraws its application or a participant withdraws from the program due to an OSHA enforcement inspection. The site can reapply when all enforcement activity is closed.
    An applicant withdraws its application or a participant withdraws from the program, due to withdrawal of union support. The site can reapply when a new letter of union support is received by the Regional VPP Manager.
    OSHA terminates a participant. N/A The site must wait 3 years to reapply.

 

 

 

 

 


 

 

 

 

 

 

Chapter VIII
Enforcement Activity at VPP Sites

 

 

 

  1. Additional VPP Assessment. This chapter describes the procedures followed by OSHA in the event of enforcement activity at a VPP applicant's or participant's site. Two types of enforcement activity trigger additional VPP assessment:
     
    1. Unprogrammed OSHA Inspections. Unprogrammed inspections occur in response to all referrals, formal complaints, fatalities, and catastrophes.
       
    2. Other Accidents or Events. Other accidents or events, whether or not injuries or illnesses have occurred and whether or not normal enforcement procedures apply to the situation, may trigger reassessment. OSHA may reassess the site's safety and health management system if there is reason to believe that a serious deficiency exists that would have an impact on the site's continued qualification for VPP.
       
  2. OSHA Personnel. A Compliance Officer who was a VPP onsite team member cannot conduct an enforcement inspection at that VPP site for the following 5 years or until the site is no longer a VPP participant, whichever occurs first.
     
  3. VPP Activity
     
    1. If the event that triggers enforcement activity occurs during the time between application and onsite evaluation, the onsite evaluation must be postponed until the enforcement case is closed. If there already is an open enforcement case at a site when the Area Director is notified by a VPP Manager of a pending onsite evaluation, the Area Director must inform the VPP Manager of the enforcement activity so the VPP evaluation can be postponed.
       
    2. If the event that triggers enforcement activity occurs during the time between the scheduling and the beginning of an onsite evaluation, the VPP onsite visit must be postponed until the enforcement case is closed.
       
    3. If the event that triggers enforcement activity occurs during the VPP onsite evaluation, VPP onsite team members must not switch to an enforcement capacity. They must contact the local Area Office, and the VPP onsite must cease until the enforcement case is closed.
       
  4. Initiation of Enforcement Activity
     
    1. When an Area Office receives a complaint, a referral other than from the onsite team, or is notified of a fatality, catastrophe, or other event requiring enforcement occurring at a VPP site, the Area Director must initiate an inspection following normal OSHA enforcement procedures.
       
    2. When an Area Office receives a referral from the VPP onsite team, the Area Director must notify the site and the Assistant Secretary. Enforcement action may be initiated only after the Assistant Secretary approves such action.
       
  5. Notification
     
    1. The Area Office must immediately notify the VPP Manager of any fatalities, catastrophes or other accidents, or incidents requiring enforcement that occur at a VPP work­site, as well as when a referral or complaint is received from a VPP worksite, including informal complaints that receive responses by letter.
       
    2. If the VPP Manager is the first person to be notified by the site of an event requiring enforcement, the VPP Manager must instruct the site to contact the appropriate Area and/or Regional office.
       
    3. Fatalities, catastrophes, and accidents or incidents involving significant publicity: If the event is catastrophic in nature, involves a fatality or multiple fatalities, and/or is highly visible with press coverage, then it is appropriate to contact the Director of Federal-State Operations. Press inquiries must be referred to the Regional Administrator and/or designated OSHA spokesperson.
       
      1. Upon being informed of the event, the VPP Manager must immediately provide a description of the event, by e-mail and/or telephone, to all of the following:
         
        1. The Office of the Assistant Secretary for OSHA.
           
        2. The Regional Administrator.
           
        3. Director of Cooperative and State Programs (DCSP).
           
        4. Director of the Office of Partnerships and Recognition within DCSP.
           
      2. The description of the fatality, catastrophe, or other significant event must include the following information:
         
        1. Site name.
           
        2. Current VPP status.
           
        3. Number of years in VPP.
           
        4. Last evaluation date.
           
        5. Last approval date.
           
        6. Date of event.
           
        7. Involved parties (employee, contractor, or both).
           
        8. Nature of event if known.
           
        9. IMIS inspection number.
           
      3. As soon as it is available, the VPP Manager must fax a copy of the Fatalities/Catastrophe (FATCAT) Report to DCSP, attention Director, Office of Partnerships and Recognition.
         
      4. As pertinent information relating to the event and its cause(s) becomes available, the VPP Manager must update the Office of the Assistant Secretary, the Director Cooperative and State Programs, and the Director, Office of Partnerships and Recognition.
         
  6. Inspection Results When enforcement activity is complete:
     
    1. The Area Office must send the VPP Manager a copy of all reports resulting from enforcement activity.
       
    2. The VPP Manager must review any reports of investigations triggered by referrals, formal or non-formal complaints, or letters written by the Area Office concerning conditions at the VPP site, fatalities/catastrophes, and other accidents or incidents requiring enforcement or involving publicity.
       
    3. The VPP Manager and Regional Administrator must assess whether deficiencies in the site's safety and health management system led to the event and, if so, must use their professional judgment and discretion to determine one of the following courses of action:
       
      1. In cases where there are no obvious systemic errors in the site's safety and health management system, the site was cooperative with the investigation, OSHA issued no willful violations, all cited hazards were abated, and VPP elements continue to be in place, a phone call with the site is sufficient to:
         
        1. Obtain assurances that site management and unions (if applicable) remain committed to VPP.
           
        2. Note any improvements in the site's systems, policies, procedures, and/or hazard controls.
           
        3. Determine whether the site remains qualified for VPP participation.
           
      2. In cases where there were minor systemic errors/failures in the site's safety and health management system or incorrect/inappropriate hazard control(s) selected, and where there may or may not have been fatalities, the site was cooperative with the investigation, OSHA issued no willful violations, and all cited hazards were abated, but where VPP elements may not be in place, the VPP Manager must visit the site to:
         
        1. Review conditions pertaining to the event.
           
        2. Obtain assurances that site management and unions (if applicable) remain committed to VPP.
           
        3. Determine if the site remains qualified for VPP participation.
           
      3. In cases where the enforcement inspection leads to concerns about major failures in the site's safety and health management system, or a fatality or multiple fatalities occurred indicating that VPP elements are not in place, or the site is due for reapproval, an onsite evaluation must be conducted to:
         
        1. Review all safety and health management system elements.
           
        2. Obtain assurances that site management and unions (if applicable) remain committed to VPP.
           
        3. Determine if the site remains qualified for VPP participation.
           
      4. In cases where willful violations were issued and upheld, the site's participation will not automatically be terminated; however, the VPP Manager will closely review the case. If it is obvious that the site no longer meets the requirements of VPP, then an onsite is not necessary, and procedures for withdrawal or termination outlined in Chapter 7 apply.
         
  7. Documentation and submission of assessment.The VPP Manager must prepare a report of findings as follows:
     
    1. If a telephone interview or onsite visit was conducted in the case of VI.C.1. or 2. respectively, above, the VPP Manager must prepare and submit a simplified report to the RA detailing the findings and recommendation for participation, withdrawal, or termination.
       
    2. If an onsite evaluation was conducted in the case of VI.C.3. above,
       
      1. The VPP Manager must prepare and submit a full onsite evaluation report to the RA detailing the findings and recommendation for participation, withdrawal, or termination.
         
      2. The VPP Manager must also submit a Significant Event Report (see Appendix C) to DCSP within 30 calendar days from the completion of the visit or a 90-day items period. (If a FATCAT report has been submitted, attach it and complete non-duplicative entries on Significant Event Report.)
         
  8. Decision to continue participation or recommend withdrawal or termination
     
    1. In the case of VI.C.1 or 2 above, the Regional Administrator may approve the site's continued participation. The RA must forward a memorandum to the Director of Federal-State Operations describing his/her decision. No further action is necessary. If the RA decides that termination is required, the procedures in Chapter 7 must be followed.
       
    2. In the case of VI.C.3. above, the Regional Administrator must make a recommendation regarding the site's continued participation.  The RA must forward a memorandum describing his/her recommendation to DCSP. DCSP must forward the Regional Administrator's memorandum to the Assistant Secretary.
       
      1. If the Assistant Secretary decides that termination is required, the procedures in Chapter 7 must be followed.
         
      2. If the Assistant Secretary decides that the site may continue its participation, the RA will be notified. After being notified of the Assistant Secretary's decision, the RA must:
         
        1. Notify the site of the Assistant Secretary's decision, and no further action is necessary, or
           
        2. Reapprove the site according to procedures in Chapter 7, if the purpose of the onsite was also to determine reapproval.
           
  9. Confidentiality. Information gathered during the VPP assessment cannot be used by the Area Office for any enforcement activity at the worksite unless the worksite has refused to correct hazards found by the VPP team, the team has recommended enforcement action, and the Assistant Secretary has initiated such action.

 

 

 

 

 


 

 

 

 

 

 

Appendix A
Instructions for Calculating Injury and Illness Rates

 

 

  1. Definitions
     
    1. Total Case Incidence Rate (TCIR).  Total number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.
       
    2. Days Away, Restricted, and/or Transfer (DART) Case Incidence Rate. Number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.
       
  2. Review of Rates. New applicants and current participants are required to calculate annual rates and 3-year rates for the last 3 complete calendar years. Use information recorded in the OSHA 300 log.

    VPP onsite teams will calculate the site's rates for the previous 3 full calendar years and year-to-date. When reviewing participating sites, the VPP onsite teams also will review the rates of each applicable contractor. Note: The 3-year review of applicable contractors' rates will not begin until 2003. (In the year 2002, 2000 and 2001 data will be reviewed).
     
  3. Contractor Rates
     
    1. Copies of each applicable contractor's hours worked and injury and illness data pertaining to the site must be maintained by site management.  (See glossary for definition of applicable contractor).
       
    2. Injury and illness data for temporary and contractor employees who are regularly intermingled with the owner's employees and under direct supervision by site management must be included in the site's rates.
       
  4. Construction Sites. Construction applicants must provide TCIR  and DART rates. All workers, including all subcontractors who worked at the site, must be included in the calculation. The rates must reflect experience from time of site inception until time of application, but must be at least 12 months. The site's SIC or NAICS code is determined by the type of construction project, not individual trades.
     
  5. Rate Calculations
     
    1. Annual rates are calculated by the formula (N/EH) x 200,000 where:

      N = Sum of the number of recordable injuries and illnesses in the year.

      For the TCIR  use the total number of injuries plus illnesses.

      For the DART rate use injuries and illnesses resulting in days away from work, restricted work activity, and/or job transfer.

      EH = total number of hours worked by all employees in the year.

      200,000 = equivalent of 100 full‑time workers working 40 hours per week, 50 weeks per year.
       
    2. 3-Year TCIR Calculation. To calculate 3-year TCIR, add the number of all recordable injuries and illnesses for the past 3 years and divide by total hours worked for those years.  Multiply result by 200,000.

      [(#inj + #ill) + (#inj + #ill) + (#inj + #ill)]     x 200,000
                  [hours +hours+hours]
       
    3. 3-year DART Rate Calculation. To calculate 3-year DART rate, use the same formula as in B. above, except add the number of all recordable injuries and illnesses resulting in days away from work, restricted work activity, and/or job transfer for the past 3 years.

      [(#DART inj + ill) + (#DART inj + ill) + (#DART inj + ill)]    x 200,000
                  [hours + hours + hours]
       
    4. Rounding Instructions. You must round the rates to the nearest tenth following traditional mathematical rounding rules. For example, round 5.88 up to 5.9; round 5.82 down to 5.8; round 5.85 up to 5.9.
       
  6. Comparison to National Averages.  Compare the 3-year TCIR  and DART rate to the most recently published Bureau of Labor Statistics (BLS) national average (available online at http://www.osha.gov/oshstats/work.html) for the three- or four‑digit (if available) SIC or the NAICS code for the industry in which the applicant is classified.
     
    1. These national averages, currently broken down by SIC code, are found in the Table of Incidence Rates of Non-fatal Occupational Injuries and Illnesses by Industry of the BLS Occupational Injuries and Illnesses Bulletin that BLS publishes each year. When BLS changes from the SIC classification system to the North American Industry Classification System (NAICS), VPP rates will be compared to the rates generated under NAICS.
       
    2. To calculate the percent above or below the national average use the following formula:

      Site rate - BLS rate x 100
            BLS rate
       
  7. Alternative Calculation for Small Worksites
     
    1. An alternative rate calculation is available to worksites where a single or relatively small number of incidences would cause the worksite's disqualification when using the normal 3-year rate calculation.
       
    2. If the following criteria are met, the TCIR and DART rate calculations can be based on the best 3 out of the most recent 4 complete calendar years' injury and illness incidence experience.
       
      1. Using the most recent calendar year's hours worked, calculate a hypothetical TCIR assuming the employer had two cases for the year.
         
      2. Compare the hypothetical rate to the most recently published BLS national average TCIR for the industry.
         
      3. If the hypothetical rate is equal to or higher than the BLS rate, the employer qualifies for the alternative rate calculation method.
         
      The following tables may be used in calculating rates and comparing them to the national averages. A separate Table 2 should be used for each applicable contractor, and the information should pertain to the site experience only, not the contractor's entire company.
       
      Table 1. Site Employee Recordable Nonfatal Injury and Illness Case Incidence Rates
      Year Total Work Hours Total number of Injuries Total number of Illnesses Sum of Injuries and Illnesses Total Case Incidence Rate for Injuries and Illnesses (TCIR) Total # of Injuries Involving Days Away from Work, Restricted Work Activity, and/or Job Transfer Total # of Illnesses Involving Days Away from Work, Restricted Work Activity, and/or Job Transfer Sum of Injury & Illness Cases Days Away from Work, Restricted Work Activity, and/or Job Transfer Rate(DART Rate
      3 Years Ago (annual)                  
      2 Years Ago (annual)                  
      Last Year (annual)                  
      3-Year Totals & Rates                  
      Current BLS Rates for SIC/NAICS          
      Percent above or below BLS National Average          
       
      Table 2. Site Applicable Contractor Recordable Nonfatal Injury and Illness Case Incidence Rates
      Year Total work hours Total number of injuries Total number of illnesses Sum of injuries and illnesses Total Case Incidence Rate for Injuries and Illnesses (TCIR) Total # of Injuries Involving Days Away from Work, Restricted Work Activity, and/or Job Transfer Total # of Illnesses Involving Days Away from Work, Restricted Work Activity, and/or Job Transfer Sum of Injury & Illness Cases Involving Days Away from Work, Restricted Work Activity, and/or Job Transfer Days Away from Work, Restricted Work Activity, and/or Job Transfer Rate(DART Rate)
      Last Year Totals and Rates                  
      Current BLS Rates for SIC/NAICS          

 

 

 

 


 

 

 

 

 

 

Appendix B
Voluntary Protection Programs Participants' Association (VPPPA)

 

 

 

  1. Purpose.  The Voluntary Protection Programs Participants' Association (VPPPA), a nonprofit 501(c)(3) organization founded in 1985, is a leader in promoting excellence in workplace safety and health and environmental protection through cooperative programs between government, management, and labor. The VPPPA works closely with the Occupational Safety and Health Administration (OSHA) to promote the growth of the VPP. As part of its efforts to share the benefits of cooperative programs, it also partners with OSHA, states operating their own safety and health plans, the Department of Energy (DOE), and the Environmental Protection Agency (EPA) in the development and implementation of cooperative programs within the agencies. Additionally, the VPPPA provides expertise to these groups in the form of comments and stakeholder feedback on proposed agency rulemaking and policies. The Association also provides comments and testimony to members of Congress regarding legislation impacting worker safety and health and the environment.

    The VPPPA has 10 regional chapters throughout the United States.  These regional chapters consist of representatives from approved VPP sites.

    The VPPPA maintains a website at www.vpppa.org.

    Note:  OSHA recognizes the many benefits available to the VPPPA's membership. However, there is no requirement that a VPP applicant or approved participant join the VPPPA.
     
  2. Conferences.
     
    1. National.  Each year, the Association holds its Annual National VPPPA Conference in a major U.S. city. The conference offers a unique forum for employees, managers, and government leaders to work and learn together to achieve better workplace safety, health, and environmental protection.

      The week-long event includes general sessions featuring top officials from OSHA and corporate America, several full days of workshops coordinated by VPPPA members, an Exhibit Hall, and several evening networking functions.
       
    2. Regional.  All regional VPPPA chapters hold annual regional conferences.
       
  3. Mentoring
     
    1. Purpose.  The goal of the VPPPA's Mentoring Program is to use proven skills found among employees at VPP sites to help protect workers at other sites, through implementation or improvement of safety and health management systems. The program is voluntary and coordinated from the National Office of the VPPPA in Falls Church, Virginia.
       
    2. Background.  The Mentoring Program was established in Spring 1994 by the VPPPA in consultation with OSHA. The program formalizes and expands the mentoring and assistance that VPP participants were providing to facilities interested in pursuing application to OSHA's VPP. The scope of the program has since been expanded to assist applicants to the DOE's VPP and any site that wants to improve its safety and health management system.  Mentors provide guidance in developing the VPP application and share techniques to improve a facility's safety and health management system.
       
  4. Mediation Program  The VPPPA offers free mediation services to VPP applicant and participant sites impeded in their efforts due to labor-management disputes. Mediator involvement takes place only when all parties agree to invite mediators to the site. This could occur when a facility is contemplating VPP involvement, or when one or more parties in a VPP partnership are considering withdrawing from the program.  Two-person co-mediator teams will travel to a site and assist parties in reaching an appropriate decision.  However, mediators have no authority to bind any party to a commitment. The VPPPA mediators have been trained in alternative dispute resolution techniques by the Federal Mediation and Conciliation Service.
     
  5. Workshops. The VPPPA offers courses and workshops throughout the United States tailored expressly for those interested in or already participating in an OSHA, DOE, or state plan VPP.
     
    1. The VPP101 Workshop.  This module is designed for worksites that are considering VPP participation. The workshop, developed by VPPPA and OSHA, introduces the VPP concepts and provides information and networking opportunities for those interested in pursuing a cooperative partnership.
       
    2. The VPP Application Workshop.  A 1-day event, tailored toward worksites interested in applying to the VPP through OSHA, DOE, or state plans.  Using materials from actual applications, a panel of OSHA and VPP site representatives teaches participants how to approach and build their respective applications.
       
    3. The Strengthening Star Quality Workshop (SSQ). This seminar offers experienced VPP participants a unique opportunity to exchange ideas and discover innovative approaches to meeting the requirements for VPP reapproval. The workshop focuses on "continuous improvement" in safety and health performance.

 

 

 

 

 


 

 

 

 

 

 

Appendix C
Regional Activity Reports

 

 

 

 

  1. VPP Program Data
     
    1. Data Submitted to the National Office
       
      1. As part of the ongoing process of maintaining current statistics and data on all approved VPP sites, VPP Managers must ensure that the following information is received in the National Office monthly. On the last business day of each month, report forms and other site updates must be sent to the National Office via fax or email to the attention of the Chief, Division of Voluntary Programs.
         
        1. VPP Activity Report (VPP Log) [See Attachment 1]
           
        2. VPP Application Status Report [See Attachment 2]
           
        3. Site information updates
           
      2. VPP Managers must ensure that they complete and send the annual data spreadsheet via e-mail to the National Office by March 30 of each year.
         
  2. Voluntary Protection Programs Automated Database System (VADS).  The Voluntary Protection Programs Automated Database System (VADS) is a database that includes approved VPP sites (Federal and state-plan jurisdiction) and Federal jurisdiction VPP applicants.  A record is maintained for each site with corporate, company, worksite, and onsite information. VADS is maintained by the National Office and is accessible only to authorized users.

    VADS contains information on all of the worksites that are now or previously were in the VPP. This data is stored in a three-tiered structure in the system. Once a site's application to the VPP is accepted, a copy of the application's general information section must be submitted to the National Office so that a record can be created in VADS to store pertinent data for the specific site, such as name of site, location, SIC or NAICS code, rates history, onsite history, etc.
     
  3. Data Charts.  On a monthly basis, DCSP generates monthly aggregate data charts/statistics that reflect current totals of all approved VPP sites (Federal and State). The data charts reflect the growth of VPP since its inception, the size (# of employees) of VPP sites, VPP sites by region, union and non-union sites, industry types in the VPP, and other pertinent information about the program.
     

 

 

 

 

 

 

 

 

 

Attachment I

 

 

 

 

 

 

 

 

REGION ______ DATE COMPLETED: ______________
DATE SUBMITTED: ______________

 

 

VPP ACTIVITY REPORT (VPP LOG) FOR THE MONTH OF ______________

 

 

  APPLICANT  DATA ONLY APPLICANT AND PARTICIPANT ONSITE DATA
ALL Applicants/ Participants (Company & Site) Name & Site Location Status* Date Rec'd Date Comp. Date of Delay(s) Reason for Delay** Date of Onsite Date of 90-day item comp. SGE(s) used?
Y/N - #
Date of RA Memo Date:
Approved/ Withdrawn
Date - A/W
Date of Ceremony Attendees
N.O. ___
R.O. ___
A.O. ___
                             
                             
                             
                             
                             
                             

* APPLICATION STATUS CODES
1 = Received/Unread; 2 = Received/Incomplete, 3 = Returned, 4 = Received/Complete
* *REASON FOR DELAY CODES
R = Delay in Scheduling of Pre-Approval Onsite Requested by Applicant
A = Administration Delay (e.g., National Office Places a Moratorium on Activity for a Company; Region Decided to Spread Out Several Applications from the Same Company)
O = Other (Explain here  __________________________________ )

 

 

 

INSTRUCTIONS FOR COMPLETING THE VPP ACTIVITY REPORT (VPP LOG)


Column 1 -- enter the name and site location of the applicant.

Column 2 B enter the application status code from those listed in the footnote.

Column 3 -- enter the date you received the application.

Column 4 -- enter the date you declared the application complete.

Column 5 -- enter any dates of delay in scheduling/conducting the pre-approval onsite.

Column 6 -- enter the appropriate Reason for Delay code from those listed in the footnote.

Column 7 -- enter the date the onsite is completed.

Column 8 -- enter the date any 90-day items were completed.

Column 9 -- enter the SGE data.

Column 10 -- enter the date the RA recommendation memo was signed.

Column 11 -- enter the date the applicant was approved or the date the applicant withdrew the application.

Column 12 -- enter the date of the approval ceremony.

Column 13 -- enter the number of OSHA attendees in each category.

 

 

 

 

Attachment 2
VPP APPLICATION STATUS REPORT: FEDERAL ONLY AS OF (               )

 

 

 

  Applications Less Than 6 Months Old Applications 6 Months Old or Older
 
 
1 2 3 4 5 6 7 8 9 10
Region Applications Received < 6 Months Ago, But Still Unread Applications Read < 6 Months Ago, But Found To Be Incomplete or Unacceptable Applications Accepted < 6 Months Ago, But Onsites Not Yet Initiated Total Applications Received 6 Months Ago,  But Still Unread Applications Read 6 Months Ago, But Found To Be Incomplete or Unacceptable or On Hold Applications Accepted 6 Months Ago, But Onsites Not Yet Initiated
BACKLOG
Total Total Accepted Applications With Onsites Not Yet Initiated(Cols. 4 & 8)
I                  
II                  
III                  
IV                  
V                  
VI                  
VII                  
VIII                  
IX                  
X                  
TOTAL                  

 

INSTRUCTIONS FOR COMPLETING THE VPP APPLICATION STATUS REPORT


Column 1 lists the Regions.

Column 2 -- enter the application status code.

Column 3 -- enter the number of applications received in the last 6 months but not read and reviewed.

Column 4 -- enter the number of applications received in the last 6 months that were found incomplete or unacceptable for some reason.

Column 5 -- enter the total of columns 2, 3, and 4.

Column 6 -- enter the number of applications received at least 6 months ago but not read and reviewed.

Column 7 -- enter the number of applications received at least 6 months ago that were found incomplete or unacceptable for some reason.

Column 8 -- enter the number of applications received at least 6 months ago that were accepted but onsites have not yet been initiated. This is also referred to as the APPLICATION BACKLOG.

Column 9 -- enter the total of columns 6, 7, and 8.

Column 10 -- enter the total of columns 4 and 8. This is the total number of applications that have been accepted but have not had onsites initiated

 

 

Attachment 3:  Significant Incident Report


Date Submitted: _____________________

 

 

 

 

Site Name:   Region:   Investigation Type:
Accident [ ]
Referral [ ]
Complaint [ ]
Other [ ]
Site Address:   SIC/NAICS:  
Last Approval Date:   Union (Y/N):   Classification:
Fatality [ ]
Incident [ ]
Catastrophe [ ]
Mishap Date:   # Employees:  
Investigation Date:   #Applicable Contractors:    
IMIS Reference #:   Years in VPP:    
Lead Investigator:   Citations (Y/N):    
Area Office:   VPP Program @ Time:    
Onsite Evaluation Date:   Press Coverage (Y/N):    
Citations: # of Injuries:    
# of Fatalities:
VPP Report (Y/N):
Persons Affected:
Mishap Description: Recommendations/Comments:
 
Program Recommendation:  

Onsite Evaluation Date: The date of the VPP evaluation conducted in response to the event. This includes the date of the phone call if that is what is done.

Citations: We are interested in the nature of the citations, i.e. Serious, Willful, Other-Than Serious, for example 2 Serious and 1 Other-Than- Serious.

Persons Affected: The answer can be employee, contractor or both.

Recommendation/Comments:  This section is very important and is used to describe the rationale for the basis for your recommendation for participation.

Program Recommendation: Several choices they are: Continued Star, Continued Merit, Conditional, Withdrawal

 

 

 

 

 

 


 

 

 

 

 

 

Appendix D
Format for Annual Submissions


Participation in the VPP requires each site to annually evaluate the effectiveness of its safety and health management system. The evaluation must include assessments of the effectiveness of all elements and sub-elements of the participant's safety and health management system. [See the July 24, 2000 VPP Revisions, Federal Register, Volume 65, No. 142, Section III.F.5.a. (8) Safety and Health Program Evaluation.  See also Chapter 3 of this Instruction for a complete description of the elements and sub-elements of a safety and health management system.]

The most comprehensive evaluation includes reviewing written programs, walking through the workplace, and interviewing employees. During this process participants should be answering the following questions relating to each element and sub-element of their safety and health management system:

 

 

 

 

  1. Is it comprehensive?
     
  2. Is it operating effectively and meeting established goals and objectives?
     
  3. What improvements can be made to make it even more effective?
     
  4. What goal modifications should be made for the upcoming year?
     

 


A self-evaluation is not a compliance audit. It is a critical review of all of the elements of the safety and health management system, including a review of site and applicable contractors' injury and illness data and trends.

The VPP revisions (published in the Federal Register of July 24, 2000) require program participants to submit their annual evaluation to their OSHA VPP Manager by February 15 of each year. OSHA expects the evaluation to include site and applicable contractors' injury and illness data, progress towards Merit or 1-Year Conditional goals (if applicable), and success stories.  OSHA uses the information to update records and statistics, to showcase successes related to implementation of the VPP requirements, and to demonstrate that participants are committed to continuously improving worker safety and health at their facilities.

The following is a suggested format.

 

 

 

 

Suggested Format for Site's Annual Submission


Section A: Summary Sheet

 

 

Site Name: Calendar Year Date Submitted
   
Corporate Information Name/Address
Phone:
Site Information Address
Phone:
Plant Manager
 
Site VPP Contact SIC/NAICS
FAX
 
e-mail VPP Status
#Applicable Contractors*
 
#Site Employees* Total Total Hours Worked
Site Injury & Illness Rate ** (Last Yr) TCIR: DART:
Applicable Contractor ** (name) TCIR: DART:
Applicable Contractor ** (name) TCIR: DART:

 

Union Name:  
Site Representative:  
Address:  
 
Local:    
Phone:   Fax:  
Email:  


*  Enter Average Employment figure as recorded in worksite's own records.

** Obtain from tables in Section B below. If you have more than one applicable contractor or union, copy and attach additional summary sheets.


Section B: Injury & Illness Rate Information

Please copy and submit separate tables (example below) for:
1). All site employees including temporary and contract workers who are directly supervised by site management,
2). Each applicable contractor's employees (contractor whose employees worked 1,000 hours or more in any calendar quarter). Report contractor injury and illness experience only for work at your site.

 

 

 

Recordable Injury and Illness Case Incidence Rates
1 2 3 4 5 6 7 8 9 10
Year Total Work Hours Total # of Injuries Total # of Illnesses Total # of Injuries & Illnesses Total Case incidence Rate for Injuries and Illnesses (TCIR Total # of Injuries Involving Days Away froM Work, Restricted Work Activity, and/or Job Transfer Total # of Injuries Involving Days Away from Work, Restricted Work Activity, and/or Job Transfer Sum of Injury & Illness Cases Involving Days Away from Work, Restricted Work Activity, and/or/ Job Transfer Days Away, Restricted, and/or Transfer Case Incidence Rate (DART rate)
Last Year                  
Most recent published BLS rate          
% above or below National Average          


column 2: Insert the total person hours worked for the year (not an estimate).
column 3: Insert the total number of OSHA recordable injuries for the year.
column 4: Insert the total number of OSHA recordable illnesses for the year.
column 5: Insert the sum of columns 3and 4.
column 6: (TCIR)=(total recordable injuries and illnesses ÷ total hours worked_ x 200,000
column 7: Insert the total number of OSHA recordable injuries involving days away from work, restricted work activity, and/or job transfer.
column 8: Insert the total number of OSHA recordable illnesses involving days away from work, restricted work activity, and/or job transfer
column 9: Insert the sum of columns 7 and 8.
column 10: (DART rate) = (total recordable injuries and illnesses resulting in days away, restricted work activity, and/or job transfer ÷ total hours worked) x 200,000
BLS data: Insert the TCIR and DART rate for your industry from BLS's Table of Incidence Rates of Nonfatal Occupational Injuries and Illnesses by Industry. Find the table at www.BLS.gov or obtain from your Regional VPP Manager.
Compare your rates to BLS:  Calculate the percent above or below the BLS national average for your TCIR and DART rate using the formula: [(Site rate - BLS rate) ÷ BLS rate] x 100

If your rates have increased since last year you must identify and describe the contributing factors and corrective actions taken in the body of the evaluation of each related element and sub-element in Section D below. If your 3-year rates are now above the national average, you must submit a rate reduction plan based on your findings. Contact your Regional VPP Manager to discuss the terms of your rate reduction plan.

 

 

 

 

Section C: Significant Changes or Events


Describe the impact of any significant changes (management, corporate buy-outs, etc.) and events (fatality, catastrophe, accident, complaints, etc.) and steps taken to ensure or restore worker safety and health.

 

 

 

 

Section D: Narrative Evaluation of Safety and Health Management System


In narrative form, assess the effectiveness of each of the four elements and their sub-elements in your safety and health management system. They are:

 

 

 

 

  1. Management Leadership and Employee Involvement
     
    1. Management Commitment to Safety and Health Protection and to VPP Participation
       
    2. Policy
       
    3. Goals, Objectives, and Planning
       
    4. Visible Top Management Leadership
       
    5. Responsibility and Authority
       
    6. Line Accountability
       
    7. Resources
       
    8. Employee Involvement
       
    9. Contract Worker Coverage
       
    10. Written Safety and Health Management System
       
  2. Worksite Analysis
     
    1. Hazard Analysis of Routine Jobs, Tasks, and Processes
       
    2. Hazard Analysis of Significant Changes, New Processes, and Non-Routine Tasks Including pre-use analysis and new baselines
       
    3. Routine Self-Inspections
       
    4. Hazard Reporting System for Employees
       
    5. Industrial Hygiene Program
       
    6. Investigation of Accidents and Near-Misses
       
    7. Trend/ Pattern Analysis
       
  3. Hazard Prevention and Control
     
    1. Certified Professional Resources
       
    2. Hazard Elimination and Control Methods
       
      • Engineering Controls
         
      • Administrative Controls
         
      • Work Practice Controls and Hazard Control Programs

            *  Safety and Health Rules and Disciplinary System
         
      • Personal Protective Equipment
         
    3. Process Safety Management (if applicable)
       
    4. Occupational Health Care Program
       
    5. Preventive/Predictive Maintenance
       
    6. Tracking of Hazard Correction
       
    7. Emergency Preparedness
       
  4. Safety and Health Training
     
    1. Managers
       
    2. Supervisors
       
    3. Employees
       
    4. Emergencies
       
    5. PPE
       
    For each sub-element include a description of:
     
    1. Improvements made since the previous year and completion of the previous year's recommendations.
       
    2. Any deficiencies identified, recommendations for improvement, the person(s) responsible for fulfilling each new recommendation, target dates for their completion, and the data/information reviewed to assess the effectiveness of the sub-element.
       

Section E: Summary Chart of Merit or 1-Year Conditional Goals

Please fill in the table below, using as many rows as necessary to summarize all of the goals currently awaiting completion of implementation, either from the previous year or the current year.

 

 

 

 

Goal Status
Goal 1:  
Goal 2:  
Goal 3:  

 


Section F: Success Stories

Please describe any success stories related to the implementation of VPP requirements. Include anecdotal as well as statistical evidence of improvements, non-routine safety and health activities, outreach, etc.

 

 

 

 

 

 


 

 

 

 

 

 

Appendix E
Onsite Evaluation Report Format


VPP SITE REPORT
Recommending
STAR APPROVAL
For

Company Name
City, State

April 1, 2001


Report Date
April 4, 2001

Evaluation Team
Name, Team Leader
Name, Backup Team Leader
Name, Safety Specialist
Name, Hygienist
Name, SGE

 

 

 

  1. Purpose and Scope of Review
     
    • Site name
       
    • Site location
       
    • Date of evaluation
       
    • Purpose of evaluation (Star approval, Merit approval, Demo approval)
       
    • VPP Team Members
       
    • VPP Volunteers
       
  2. Methods of Data Collection
     
    • Information on which report is based (application, previous reports, walk through, on site documentation, etc.)
       
  3. Employees at the Worksite
     
    • Number of employees
       
    • Contract workers and/or temporary workers
       
    • Collective bargaining agent(s) representing the employees
       
    • Number of interviews conducted with different types of workers
       
  4. The Worksite
     
    • SIC Code
       
    • Site description (one location or many, acreage, age, primary structures, etc.)
       
    • Basic description of processes, products, and applications
       
    • Covered under Process Safety Management
       
    • Housekeeping
       
  5. Worksite Hazards
     
    • Site hazards
       
  6. Injury and Illness Rates
     
    • Rates - TCIR, DART
       
    • Comparisons to BLS industry averages
       
  7. OSHA Activity
     
    • Prior OSHA inspection activity
       
    • Relationship with OSHA
       
  8. Elements of the VPP Review/Program Changes
     
    • Bulleted summary of VPP Elements with a reminder that all aspects of the Safety and Health program meet the VPP requirements as set forth in TED (Refer to the VPP Site Worksheet for specifics).
       
      • Management, Leadership, and Employee Involvement
         
      • Worksite Analysis
         
      • Hazard Prevention and Control
         
      • Safety & Health Training
         
        • For Reapproval evaluations, discuss significant program or site changes since the last visit. A bulleted list is acceptable.
           
  9. Areas of Excellence
     
    • Bulleted list and description of best practices (e.g., machine guarding, ergonomics, lockout/tagout, employee involvement)
       
  10. Recommendation for Participation
     
    • Recommendation
       
  11. Goals
     
    • Merit goals (if relevant)
       
    • 1-Year Conditional goals (if relevant)
       

 

 

A review of the OSHA 200/300 logs was made.  The following are the total incidence and lost workday case rates since 20XX:

 

 

Year Hours Total # of Cases TCIR Number of Cases Involving Days Away from Work, Restricted Activity or Job Tranfer DART Rate
1999 185,445 2 2.2 2 2.2
2000 216,212 2 1.9 1 0.9
2001 195,444 1 0.1 0 0
Total 597,791 7   5  
Three-Year Rate (1999-2001) 2.3   1.7
BLS National Average for 2001 (SIC 3728) 8.6   4.2
2002 YTD 43,315 0 0.0 0 0.0

 


For the period 1999-2001, the site's:

 

 

 

  • Total Case Incidence Rate (TCIR) is X.X (XX% above/below the 2000 BLS industry averages for SIC XXXX).
     
  • The Days Away from Work, Restricted Activity or Job Transfer (DART) case incidence rate is X.X (XX% above/below the 2000 BLS industry averages for SIC XXXX).
     

The information on the OSHA 300 log OSHA 300 logs supports the information provided in the application, and the company's first report of injury forms support the data in the logs. The Honeywell Health, Safety and Environmental (HS&E) Coordinator is responsible for the entries to the OSHA 300 log and verified the accuracy of the records. The HS&E Coordinator understands the recordkeeping requirements. Based upon interviews conducted with management and employees, the logs accurately reflect the injury and illness experience at this plant.

There were temporary employees at the worksite at the time of the team's visit. Injuries or illnesses experienced by temporary employees under the direct supervision of Honeywell Aircraft Landing Systems are recorded on the worksite's OSHA 300 log OSHA 300 log. There was one temporary employee injury recorded on the worksite's OSHA 300 log for 2001.

 

 

 

 

VPP SITE WORKSHEET
Recommending
STAR APPROVAL
For
Company Name
City, State

Evaluation Date
April 1, 2001

Report Date
April 4, 2001

Evaluation Team
Name, Team Leader
Name, Backup Team Leader
Name, Safety Specialist
Name, Hygienist
Name, SGE

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section I: Management Leadership & Employee Involvement
A. Written Safety &amp; Health Management System
A1. Are all the elements (such as Management Leadership and Employee Involvement, Worksite Analysis, Hazard Prevention and Control, and Safety and Health Training) and sub-elements of a basic safety and health management system part of a signed, written document? (For Federal Agencies, include 29 CFR 1960.)   If not, please explain.

      ♦
       
A2. Have all VPP elements and sub-elements been in place at least 1 year?  If not, please identify those elements
that have not been in place for at least 1 year.

      ♦
       
A3. Is the written safety and health management system at least minimally effective to address the scope and complexity of the hazards at the site? (Smaller, less complex sites require a less complex system.)  If not, please explain. MRX.

      ♦
       
A4. Have any VPP documentation requirements been waived (as per FRN page 656, paragraph F5a4)? If so, please explain.

      ♦
 
       

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section I: Management Leadership & Employee Involvement
B. Management Commitment & Leadership
B1. Does management overall demonstrate at least minimally effective, visible leadership with respect to the safety and health program (considering FRN items F5 A-H)? Provide examples. MRX.

      ♦
       
B2. How has the site communicated established policies and results-oriented goals and objectives for worker safety to employees?

      ♦
       
B3.Do employees understand the goals and objectives for the safety and health program?

      ♦
       
B4. Are the safety and health program goals and objectives meaningful and attainable? Provide examples supporting the meaningfulness and attainability (or lack-there-of if answer is no) of the goal(s). (Attainability can either be unrealistic/realistic goals or poor/good implementation to achieve them.) (See: TED Chapter 3 II C1a)

      ♦
 
       
B5. How does the site measure its progress towards the safety and health program goals and objectives? Provide examples.

      ♦
 
       

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section I: Management Leadership & Employee Involvement
C. Planning
C1. How does the site integrate planning for safety and health with its overall management planning process (for example, budget development, resource allocation, or training)?

      ♦
       
C2. Is safety and health effectively integrated into the site's overall management planning process? If not, please explain.

      ♦
       

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section I: Management Leadership & Employee Involvement
D.  Authority and Line Accountability
D1. Does top management accept ultimate responsibility for safety and health in the organization? (Top management acknowledges ultimate responsibility even if some safety and health functions are delegated to others.)   If not, please explain. MRX.

      ♦
       
D2. How is the assignment of authority and responsibility documented and communicated (for example, organization charts, job descriptions)?

      ♦
       
D3. Do the individuals assigned responsibility for safety and health have the authority to ensure that hazards are corrected or necessary changes to the safety and health management system are made?  If not, please explain

      ♦
       
D4. How are managers, supervisors, and employees held accountable for meeting their responsibilities for workplace safety and health? (Annual performance evaluations for managers and supervisors are required.)

      ♦
       
D5. Are adequate resources (equipment, budget, or experts) dedicated to ensuring workplace safety and health? Provide examples MRX.

      ♦
       
D6. Is access to experts (for example, Certified Industrial Hygienists, Certified Safety Professionals, Occupational Nurses, or Engineers), reasonably available to the site, based upon the nature, conditions, complexity, and hazards of the site?  If so, under what arrangements and how often are they used?

      ♦
       

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section I: Management Leadership & Employee Involvement
E. Contract Workers
E1. Does the site utilize contractors? Please explain.

      ♦
       
E2. Were there contractors onsite at the time of the evaluation?

      ♦
       
E3. When selecting onsite contractors, how does the site evaluate the contractor's safety and health programs and performance (including rates)? (See: TED Chapter 3 IV 3-19)

      ♦
       
E4. Are contractors and subcontractors at the site to maintain effective safety and health programs and to comply with all applicable OSHA and company safety and health rules and regulations? If so, please provide examples.

      ♦
       
E5. Does the site's contractor program cover the prompt correction and control of hazards in the event that the contractor fails to correct or control such hazards? Provide examples. MRX.

      ♦
       
E6. How does the site document and communicate oversight, coordination, and enforcement of safety and health expectations to contractors?

      ♦
       
E7. Have the contract provisions specifying penalties for safety and health issues been enforced, when appropriate? If not, please explain.

      ♦
       
E8. How does the site monitor the quality of the safety and health protection of its contract employees?

      ♦
       
E9. If the contractors' injury and illness rates are above the average for their industries, does the site have procedures that ensure all employees are provided effective protection on the worksite?  If not, please explain.

      ♦
       
E10. Do contract provisions for contractors require the periodic review and analysis of injury and illness data? Provide examples.

      ♦
       
E11 Based on your answers to the above items, is the contract oversight minimally effective for the nature of the site? (Inadequate oversight is indicated by significant hazards created by the contractor, employees exposed to hazards, or a lack of host audits.) If not, please explain. MRX

      ♦
       

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section I: Management Leadership & Employee Involvement
F.  Employee Involvement
F1. How were employees selected to be interviewed by the VPP team?

      ♦
       
F2. How many employees were interviewed formally?  How many were interviewed informally?

      ♦
       
F3. Do employees support the site's participation in the VPP Process? MRX

      ♦
       
F4. Do employees feel free to participate in the safety and health management system without fear of discrimination or reprisal?  If so, please explain. MRX

      ♦
       
F5. Please describe at least three ways in which employees are meaningfully involved in the problem identification and resolution, or evaluation of the safety and health program (beyond hazard reporting). (See: FRN Chapter 3 Paragraph II.C.1.b)

      ♦
       
F6. Are employees knowledgeable about the site's safety and health management system? If not, please explain.

      ♦
       
F7. Are employees knowledgeable about the VPP program?  If not, please explain.

      ♦
       
F8. Are the employees knowledgeable about OSHA rights and responsibilities?  If not, please explain.

      ♦
       
F9. Do employees have access to results of self-inspection, accident investigation, appropriate medical records, and personal sampling data upon request? If not, please explain.

      ♦
       

 

 

 

 

Section I: Management Leadership & Employee Involvement
Merit Goals:   Include cross reference to secion, subsection, and questions, e.g., I.B2)
1.

2.

 

 

 

 

90-Day Items:                   (Delete this section for final transmittal to National Office)
1.

2.

 

 

 

 

Best Practices:
1.

2.

 

 

 

 

Comments including Recommendations (optional)
1.

2.

 

 

 

 

Documents Referenced, Programs Reviewed (optional)
1.

2.

 

 

 

 

Section II: Worksite Analysis
A.  Baseline Hazard Analysis
A1. Has the site been at least minimally effective at identifying and documenting the common safety and health hazards associated with the site (such as those found in OSHA regulations, building standards, etc., and for which existing controls are well known)? If not, please explain. MRX

      ♦
       
A2. What methods are used in the baseline hazard analysis to identify health hazards? (Please include examples of instances when initial screening and full-shift sampling were used. See FRN page 45657, F5.B.2.b )

      ♦
       
A3. Does the site have a documented sampling strategy used to identify health hazards and assess employees' exposure (including duration, route, and frequency of exposure), and the number of exposed employees?  If not, please explain.

      ♦
       
A4. Do sampling, testing, and analysis follow nationally recognized procedures?  If not, please explain.

      ♦
       
A5. Does the site compare sampling results to the minimum exposure limits or are more restrictive exposure limits (PELs, TLVs, etc.) used?  Please explain.

      ♦
       
A6. Does the baseline hazard analysis adequately identify hazards (including health) that need further analysis? If not, please explain.

      ♦
       
A7. Do industrial hygiene sampling data, such as initial screening or full shift sampling data, indicate that records are being kept in logical order and include all sampling information (for example, sampling time, date, employee, job title, concentrated measures, and calculations)? If not, please explain the deficiencies and how they are being addressed.

      ♦
       

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section II: Worksite Analysis
B. Hazard Analysis of Significant Changes
B1. When purchasing new materials or equipment, or implementing new processes, what types of analyses are performed to determine their impact on safety and health? Is it adequate?

      ♦
       
B2. When implementing/introducing non-routine tasks, materials or equipment, or modifying processes, what types of analyses are performed to determine their impact on safety and health? Is it adequate?

      ♦
       

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section II: Worksite Analysis
C.  Hazard Analysis of Routine Activities
C1. Is there at least a minimally effective hazard analysis system in place for routine operations and activities? MRX

      ♦
       
C2. Does hazard identification and analysis address both safety and health hazards, if appropriate? If not, please explain.

      ♦
       
C3. What hazard analysis technique(s) are employed for routine operations and activities (e.g., job hazard analysis, HAZ-OPS, fault trees)?  Are they adequate?

      ♦
       
C4. Are the results of the hazard analysis of routine activities adequately documented? If not, please explain.

      ♦
       

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section II: Worksite Analysis
D. Routine Inspections
D1. Does the site have a minimally effective system for performing safety and health inspections (i.e., a minimally effective system identifies hazards associated with normal operations)? If not, please explain. MRX

      ♦
       
D2. Are routine safety and health inspections conducted monthly, with the entire site covered at least quarterly (for construction: entire site weekly)?

      ♦
       
D3. How do inspections use information discovered through the baseline hazards analysis, job hazard analysis, accident/incident analysis, employee concerns, sampling results, etc.?

      ♦
       
D4. Are those personnel conducting inspections adequately trained in hazard identification? If not, please explain.

      ♦
       
D5. Is the routine inspection system written, including documentation of results?  If not, please explain.

      ♦
       
D6.     Do the written routine inspection reports clearly indicate what needs to be corrected, by whom, and by when?    If not, please explain.

      ♦
       
D7. Did the VPP team find hazards that should have been found through self-inspection? If so, please explain.

      ♦
       

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section II: Worksite Analysis
E. Hazard Reporting
E1.      Does the site have a reliable system for employees to notify appropriate management personnel in writing about safety and health concerns?  Please describe.

      ♦
       
E2.      Do the employees agree that they have an effective system for reporting safety and health concerns?    If not, please explain.

      ♦
       
E3.      Is there a minimally effective means for employees to report hazards and have them addressed? MRX If not, please explain.

      ♦
       

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section II: Worksite Analysis
F. Hazard Tracking
F1.      Does the hazard tracking system address hazards found by employees, hazard analysis of routine and non-routine activities, inspections, and accident or incident investigations? If not, please explain.

      ♦
       
F2.      Does the tracking system result in hazards being corrected and provide feedback to employees for hazards they have reported. If not, please explain.

      ♦
       
F3.      Does the tracking system result in timely correction of hazards with interim protection established when needed? Please describe. If not, please explain.

      ♦
       
F4.      Does a minimally effective tracking system exist that results in hazards being controlled? If not, please explain. MRX

      ♦
       

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section II: Worksite Analysis
 
G.  Accident/Incident Investigations

      ♦
       
G1. Is there a minimally effective system for conducting accident/incident investigations, including near-misses?  If not, please explain. MRX

      ♦
       
G2. Are those conducting the investigations trained in accident/incident investigation techniques? If not, please explain.

      ♦
       
G3. Describe how investigations discover and document all the contributing factors that led to an accident/incident.

      ♦
       
G4. Were any hazards discovered during the investigation previously addressed in any prior hazard analyses (e.g., baseline, self-inspection)?If not, please explain.
      ♦
       

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section II: Worksite Analysis
 
H.  Safety and Health Program Evaluation

      ♦
       
H1. Briefly describe the system in place for conducting an annual evaluation.

      ♦
       
H2. Does the annual evaluation cover the aspects of the safety and health program, including the elements described in the Federal Register?  If not, please explain.

      ♦
       
H3. Does the annual evaluation include written recommendations in a narrative format?  If not, please explain.

      ♦
       
H4. Is the annual evaluation an effective tool for assessing the success of the site's safety and health system? Please explain.

      ♦
       
H5. What evidence demonstrates that the site responded adequately to the recommendations made in the annual evaluation?

      ♦
       

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section II: Worksite Analysis
 
I.  Trend Analysis

      ♦
       
I1. Does the site have a minimally effective means for identifying and assessing trends?MRX

      ♦
       
I2.       Have there been any injury and/or illness trends over the last three years?  If so, please explain.

      ♦
       
I3.       If there have been injury and/or illness trends, what courses of action have been taken? Are they adequate?

      ♦
       
I4.       Does the site assess trends utilizing data from hazard reports or accident/incident investigations to determine the potential for injuries and illnesses? If not, please explain.
      ♦
       

 

 

 

 

Section II: Worksite Analysis
Merit Goals:   Include cross reference to seciong, subsection, and questions, e.g., II.B2)
1.

2.

 

 

 

 

90-Day Items:                   (Delete this section for final transmittal to National Office)
1.

2.

 

 

 

 

Best Practices:
1.

2.

 

 

 

 

Comments including Recommendations (optional)
1.

2.

 

 

 

 

Documents Referenced, Programs Reviewed (optional)
1.

2.

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section III: Hazard Prevention and Control
 
A.  Hazard Prevention and Control

      ♦
       
A1.    Does the site select at least minimally effective controls to prevent exposing employees to hazards.MRX
      ♦
       
A2. When the site selects hazard controls, does it follow the preferred hierarchy (engineering controls, administrative controls, work practice controls [e.g lockout/tag out, bloodborne pathogens, and confined space programs], and personal protective equipment) to eliminate or control hazards?  Please provide examples, such as how exposure to health hazards were controlled.
      ♦
       
A3. Describe any administrative controls used at the site to limit employee exposure to hazards (for example, job rotation).
      ♦
       
A4. Do the work practice controls and administrative controls adequately address those hazards not covered by engineering or administrative controls?  If not, please explain.
      ♦
       
A5. Are the work practice controls (e.g. lockout/tag out, blood born pathogens, and confined space programs) recommended by hazard analyses implemented at the site? If not, please explain.
      ♦
       
A6. Are follow-up studies (where appropriate) conducted to ensure that hazard controls were adequate? If not, please explain.
      ♦
       
A7. Are hazard controls documented and addressed in appropriate procedures, safety and health rules, inspections, training, etc.?  Provide examples.
      ♦
       
A8.     Are there written worker safety procedures including a disciplinary system?  Describe the disciplinary system.
      ♦
       
A9. Has the disciplinary system been enforced equally for both management and employees, when appropriate? If not, please explain.
      ♦
       
A10.   Does the site have minimally effective written procedures for emergencies (TED 3-16 3h)? MRX
      ♦
       
A11.     Are emergency drills held at least annually?
      ♦
       
A12.   Does the site have a written preventative/predictive maintenance system?  If not, please explain.
      ♦
       
A13.   Did the hazard identification and analysis (including manufacturers' recommendations) identify hazards that could result if equipment is not maintained properly? If not, please explain.
      ♦
       
A14.   Does the preventive maintenance system adequately detect hazardous failures before they occur? If not, please explain.
      ♦
       
A15.   How does the site select Personal Protective Equipment (PPE)?
      ♦
       
A16.   Do employees understand the limitations and uses of PPE?  If not, please explain.
      ♦
       
A17.    Did the team observe employees using, storing, and maintaining PPE properly?  If not, please explain.
      ♦
       
A18.    Is the site covered by the Process Safety Management Standard (29 CFR 1910.119)? If not, skip to section B.
      ♦
       
A19.    Which chemicals that trigger the Process Safety Management (PSM) standard are present?
      ♦
       
A20. Please describe the PSM elements in place at the site (do not duplicate if included elsewhere in the report, such as under contractors, preventive maintenance, emergency response, or hazard analysis).
      ♦
       

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section III: Hazard Prevention and Control
 
B.  Occupational Health Care Program and Recordkeeping

      ♦
       
B1. Describe the occupational health care program (including availability of physician services, first aid, and CPR/AED) and special programs such as audiograms or other medical tests used.

      ♦
       
B2. How are licensed occupational health professionals used in the site's hazard identification and analysis, early recognition and treatment of illness and injury, and the system for limiting the severity of harm that might result from workplace illness or injury? Is this use appropriate?

      ♦
       
B3.  Is the occupational health program adequate for the size and location of the site, as well as the nature of hazards found here?  If not, please explain.

      ♦
       

 

 

 

 

Section III: Hazard Prevention and Control
Merit Goals:   Include cross reference to seciong, subsection, and questions, e.g., I.B2)
1.

2.

 

 

 

 

90-Day Items:                   (Delete this section for final transmittal to National Office)
1.

2.

 

 

 

 

Best Practices:
1.

2.

 

 

 

 

Comments including Recommendations (optional)
1.

2.

 

 

 

 

Documents Referenced, Programs Reviewed (optional)
1.

2.

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section IV: Safety and Health Training
 
A.  Safety and Health Training

      ♦
       
A1. What are the safety and health training requirements for managers, supervisors, employees, and contractors?

      ♦
       
A2. Who delivers the training?

      ♦
       
A3. How are the safety and health training needs for employees determined?

      ♦
       
A4.     Does the site provide minimally effective training to educate employees regarding the known hazards of the site and their controls?  If not, please explain.  MRX

      ♦
       
A5.     What system is in place to ensure that all employees and contractors have received and understand the appropriate training?

      ♦
       
A6. Who is trained in hazard identification and analysis?

      ♦
       
A7. Is training in hazard identification and analysis adequate for the conditions and hazards of the site? If not, please explain.

      ♦
       
A8. Does management have a thorough understanding of the hazards of the site?  Provide examples that demonstrate their understanding.

      ♦
       

 

 

 

 

Section IV: Safety and Health Training
Merit Goals:   Include cross reference to seciong, subsection, and questions, e.g., I.B2)
1.

2.

 

 

 

 

90-Day Items:                   (Delete this section for final transmittal to National Office)
1.

2.

 

 

 

 

Best Practices:
1.

2.

 

 

 

 

Comments including Recommendations (optional)
1.

2.

 

 

 

 

Documents Referenced (optional)
1.

2.

 

 

 

 

VPP TEAM COMPOSITION AND PROGRAM ACTIVITIES
DATA SHEET


Site Name:

Site Name and Address:

Small Business? (<250 employees onsite and <500 employees corporate-wide) (Y/N):
Region:
Dates of Onsite:
Date of 90-day Item Completion (if applicable):


Check one: ___Approval            ____Re-Approval

Report drafted onsite: ___Yes            ____No

 

 

 

 

TEAM COMPOSITION
LAST NAME ID* ROLE OSHA VOLUNTEER
       
       
       
       
       

* The ID is the first letter of last name, plus the last four digits of the person's social security #.

 

 

 

 

BEST PRACTICES CHECKLIST
_____ ERGO PROGRAM _____ CONFINED SPACE _____ LOCKOUT/TAGOUT
_____ PSM _____ HAZARD ANALYSIS _____ CONTRACTOR
_____ INSPECTIONS _____ ACCOUNTABILITY _____ TRACKING
_____ EMPLOYEE INVOLVEMENT    _____ INDUSTRIAL HYGIENE
_____ EMERGENCY RESPONSE TEAMS _____ ENGLISH/SECOND LANG.
_________________ OTHER (describe)

 

 

 

 

STRATEGIC PLAN FOCUS AREA
_____ AMPUTATIONS _____ LEAD EXPOSURES _____ NURSING HOMES
_____ SILICA _____ ERGONOMICS _____ LOGGING
_____ FOOD PROCESSING _____ SHIPYARDS  _____ CONSTRUCTION

 

 

 

 

 

 


 

 

 

 

 

 

Appendix F
VPP

VPP Site Report and Site Worksheet:
A User Guide
 

 

 

 

Voluntary Protection Programs
Occupational Safety and Health Administration

Date

 


Table of Contents

Page

Introduction
    1.1Overview of the Revised VPP Site Report and Worksheet
    1.2   Technical Requirements

VPP Site Worksheet
    2.1   Minimum Requirements (MR)
    2.2   Instructions for Completing the VPP Site Worksheet
    2.3   Instructions for Completing the Summary and Recommendations Section.
    2.4   Working with the VPP Site Worksheet Computer Files

        2.4.1    Dividing the VPP Site Worksheet Files among Team Members
        2.4.2    Compiling the Final VPP Site Evaluation Worksheet
        2.4.3    Single File Version
VPP Site Report.
    3. VPP Site Report
    3.1   Preparing the VPP Site Report
    3.2   OSHA Log Recordkeeping

        3.2.1    TCIR and DART Rate Calculation Table.
        3.2.2    Analysis of the TCIR and DART Rate
        3.2.3    Comparison of OSHA Injury and Illness Logs to Site's VPP Application
        3.2.4    Temporary Employees
    3.3   VPP Site Report Example
Site Worksheet Minimum Requirement Guidance
    4.1   VPP Minimum Requirement Defined
    4.2   Section I. Management Leadership and Employee Involvement

        4.2.1 Section I, Subsection Written Safety and Health Management System
        4.2.2 Section I, Subsection B.  Management Commitment and Leadership
        4.2.3    Section I, Subsection D.  Authority and Line Accountability
        4.2.4   Section I, Subsection E.  Contract Workers
        4.2.5    Section I, Subsection F.  Employee Involvement
    4.3 Section II. Worksite Analysis
        4.3.1    Section II, Subsection B.  Baseline Hazard Analysis
        4.3.2    Section II, Subsection C.  Hazard Analysis of Routine Activities
        4.3.3    Section II, Subsection E.  Routine Inspections
        4.3.4    Section II, Subsection F.  Hazard Reporting System
        4.3.5    Section II, Subsection G.  Accident/Incident Investigation
        4.3.6    Section II, Subsection I.  Trend Analysis
    4.4   Section III: Hazard Prevention and Control
        4.4.1    Section III, Subsection Hazard Prevention and Control
    4.5 Section IV. Safety and Health Training
        4.5.1    Section IV, Subsection A. Safety and Health Training

 

 

 

Section 1

 

 

Introduction

 


1.1 Overview of the Revised VPP Site Report and Worksheet

The Office of Partnerships and Recognition, in coordination with OSHA Regional Office staff, recently conducted a process improvement project to develop a new format for the Voluntary Protection Programs (VPP) Site Report. The goal of this project was to reduce the time required to both prepare and review the report while ensuring adequate documentation of the VPP onsite evaluation.

The new format divides the original VPP report into two separate sections:

 

 

 

  • The VPP Site Worksheet is a worksheet to be used on-site by the evaluation team to document their findings. The purpose of the VPP Site Worksheet is to provide the technical basis and rationale that support an evaluation team's findings and the resulting program participation recommendation.
     
  • The VPP Site Report is a summary of the findings and recommendations from the VPP on-site evaluation and is to be used by OSHA senior management to review the team's findings and recommendations. The VPP Site Report is designed to reflect the overall findings from the evaluation in a short and concise narrative format. The Site Report contains a summary of the evaluation, documentation of the site's injury and illness experience, and recommendation for program participation.
     

The revised VPP Site Worksheet and VPP Site Report replace the previous long-form narrative report. The major changes include:

 

 

 

 

  • Streamlining the VPP Site Worksheet to enable yes/no answers to many of the questions and use of bullet points to document findings, rather than lengthy explanations.
     
  • Replacement of the narrative report with a brief section that describes key program elements and the site evaluation team's recommendations.
     

Both the VPP Site Worksheet and the VPP Site Report are to be maintained in the site's public file and presented to the employer.

1.2       Technical Requirements

VPP on-site evaluation teams are required to complete the VPP Site Report and Worksheet using a laptop computer. The minimum technical specifications required to operate these programs effectively are:

 

 

 

 

  • list A Pentium III orequivalent CPU running at 600 MHz speed or faster (many are 900+)
  • list At least 256 MB RAM(Random Access Memory)
  • list At least a 10 GB harddrive
  • list Microsoft Word
  • list Access to e-mail from a remote location.

In addition, on-site evaluation teams should have access to a cellular (mobile) phone or pager. Additional items that evaluators have found to be useful, but not considered essential, include:

Computer projector (for example, InFocus LP 130)

Personal Desk Assistant (for example, a Palm Pilot) for scheduling and outreach/contact information.

Digital camera with the capability to load photos easily onto computer.  (Note: This is often requested so that evaluators can provide pictures of success stories. However, if photos are to be published, for example, in OSHA's Job Safety & Health Quarterly, the camera must be capable of high-resolution shots, with a minimum 300 dpi at 5x7 inches or larger. Such cameras are relatively expensive. A good alternative is a 35mm camera for hard copy prints, which can then be scanned and stored electronically.)

*    *    *     *   *     *    *    *     *   *     *    *    *    *   *     *    *    *     *   *     *    *    *     *   *     *  

The following pages contain detailed instructions for completing the revised VPP Site Worksheet and the VPP Site Report.

 

 

 

 

Section 2

 

 

VPP Site Worksheet


The VPP Site Worksheet requires evaluators to review the key topic areas related to a site's safety and health management system and its working conditions.  The VPP Site Worksheet has been streamlined from previous versions in several key ways:

 

 

  • The number of areas to be addressed and the number of questions to be answered have been reduced as a result of consolidation and an attempt to reduce the redundancy of questions.
     
  • Many of the questions are presented in a yes/no format, with a detailed response usually required only for those questions for which site evaluators answered "no."
     
  • Evaluators provide supplementary descriptive information in bullet form, rather than in narrative format.
     

The reduction in key topic areas in the VPP Site Worksheet has resulted in four major sections devoted to the following topics:

 

 

 

 

  • Section I -- Management Leadership and Employee Involvement
     
  • Section II -- Worksite Analysis
     
  • Section III -- Hazard Prevention & Control
     
  • Section IV -- Safety and Health Training.
     

The previous section entitled "A General Review of Safety and Health Conditions" is now part of the VPP Site Report and is no longer a stand-alone section in the VPP Site Worksheet.

At the end of each major section, an additional page has been included to enable evaluators to provide further information and discussion on such topics as Merit Goals, 90-Day Items, Best Practices, Recommendations, and Documents Referenced.

The VPP Site Worksheet's modular format allows evaluators to further break up the document to facilitate the on-site evaluation and reporting of findings. Key sections now contain several subsections of questions that address various aspects of the general topic. Each subsection is clearly identified and given a letter and a number to facilitate easy reference by the on-site evaluators. For example, Section I, Management Leadership and Employment Involvement, consists of the following six subsections:

 

 

 

 

  • Subsection A -- Written Safety and Health Management System
     
  • Subsection B -- Management Commitment and Leadership
     
  • Subsection C -- Planning
     
  • Subsection D -- Authority and Line Accountability
     
  • Subsection E -- Contract Workers
     
  • Subsection F -- Employee Involvement.
     

Evaluators should be consistent in their use of the format when addressing the questions in each of the four topic sections.   Please remember:

 

 

 

 

  • Evaluators are required to complete all questions.
     
  • Some of the questions will instruct evaluators to support their yes/no answers or explain why they believe that site performance in a particular area is adequate. It is important that evaluators answer the entire question.
     
  • Although evaluators are not required to provide comments for "yes" answers, they may wish to do so in order to highlight best business practices or document a unique or meaningful application that might benefit another site.
     

2.1       Minimum Requirements (MR)

The previous Policies and Procedures Manual VPP TED8.1a contained a checklist for the purpose of determining if the applicant/site met de-minimus requirements. The MR designator in the Site Worksheet allows the agency to eliminate that checklist.

Minimum Requirements (MR) represent those elements of a site's safety and health management system that must be in place and at least minimally effective in order for a site to be considered for participation in the Merit Program. If a site fails to meet even one MR, then it is not eligible for participation in the VPP and should be asked to withdraw its application.  Requirements that are considered MR will have the symbol: MR.

Section 4 of this document contains additional guidance intended to help you make a judgment on many of the questions identified as Minimum Requirements.


2.2       Instructions for Completing the VPP Site Worksheet

 

 

 

 

 

 

How Assessed
Yes or
No
Interview Observation Doc Review
Section I: Management Leadership & Employee Involvement
 
A. Written Safety & Health Management System

      ♦
       
A1. Are all the elements (such as Management Leadership and Employee Involvement, Worksite Analysis, Hazard Prevention and Control, and Safety and Health Training

      ♦
       
A2. Have all VPP elements and sub-elements been in place at least 1 year?  If not, please identify those elements that have not been in place for at least 1 year.

      ♦
       
A3. Is the written safety and health management system at least minimally effective to address the scope and complexity of the hazards at the site? (Smaller, less complex sites require a less complex system.)  If not, please explain. MR.

      ♦
       
A4. Have any VPP documentation requirements been waived?  If so, please explain.

      ♦
       

 


To complete these subsections, evaluators should follow the steps listed below.

 

 

 

 

 

 

  1. Read the question and answer "Yes" or "No" in the first column based upon the findings from the evaluation.
     
  2. If the question asks you to explain your "Yes" or "No" answer, please respond in bullet-point format.
     
  3. If the Yes or No column is shaded, then the evaluator is required to provide a detailed answer to the question. Please present your analysis in bullet-point format.
     
  4. In the section entitled "How Assessed," identify the source(s) of information used to answer the question. If you:
     
    • Used information obtained during interviews, put an X in the Interview column.
       
    • Used personal observation, put an X in the Observation column.
       
    • Reviewed documents, put an X in the Doc Review column. Evaluators must identify the documents reviewed.
       

There are various ways to identify the documents reviewed. One is to assign numbers to all of the documents reviewed in connection with a particular section of the VPP Site Worksheet. When you use a document to answer a question, put the number assigned to that document in the "Doc Review" column. For example, if you used an employee manual to answer a question, and you had identified the employee manual as Document 1, you would put a "1" in the "Doc Review" column. Then, at the end of the section, you would list the number and the title of each document in the Documents Referenced box. Another potential method is to list the documents reviewed in the bulleted area below the question. Either method is acceptable.

Once the evaluators have completed the six subsections, they must complete the summary and recommendations section, as described below.


2.3       Instructions for Completing the Summary and Recommendations Section

At the end of each section, there is a summary and recommendations section.  Instructions for its completion are presented below.

 

 

 

 

Section I:
Management Leadership & Employee Involvement
Merit Goals:   Include cross reference to seciong, subsection, and questions, e.g., I.B.2)
1.

2.

 

 

 

 

90-Day Items:                   (Delete this section for final transmittal to National Office)
1.

2.

 

 

 

 

Best Practices:
1.

2.

 

 

 

 

Comments including Recommendations (optional)
1.

2.

 

 

 

 

Documents Referenced (as appropriate)
1.

2.

 

 

 

 

  1. In the Merit Goal section, list the specific elements that the evaluators have determined to be deficient and in need of Merit goals. Also reference the section of the VPP Site Worksheet for which the Merit Goal applies, for example, B3. If this section is not applicable, write "N/A" in the first line.
     
  2. The 90-Day Items section should be used to document those actions that the site needs to take before OSHA can approve the site into the program. 90-Day Items should be limited to (a) compliance issues and (b) program element modifications that can be easily accomplished and that do not involve the "year-in-practice" requirement. Sites must demonstrate that they have addressed the items listed here within a 90-day period starting from the conclusion of the on-site visit.  Once the applicant site has completed these items, this section should be removed from the final report that is transmitted to the National Office. The report listing these items, however, should be kept in the evaluator's working file.
     
  3. The Site Evaluation Team can use the optional "Best Practices" box at the end of each Worksheet Section to recognize (and thus praise) one or more aspects of the site's safety and health management system where the site is performing particularly well.
     
  4. The Comments including Recommendations section, which is optional, provides evaluators the opportunity to document additional comments about the site's safety and health management system. Recommendations should be made in those areas where the site's element is already at Star quality, but still has room for improvement.  An appropriate recommendation is one that helps improve the element's reliability, effectiveness, or efficiency.  Like the 90-Day items, these recommendations should be removed from the report that is sent to the National Office.  The report listing evaluators' comments and recommendations, however, should be kept in the working file.
     
  5. In the Documents Referenced section, evaluators must list the documents that were reviewed in addressing the elements of this section.
     

Team members and the Team Leader must ensure that goals, items, comments, or recommendations provided at the end of a Worksheet Area do not contradict any of the Site Evaluation Worksheet answers. For example, if the Worksheet has a question that has been answered "Yes" without further explanation, but the goals, items, comments, or recommendations indicate that the answer should have been "No" with an explanation, the inconsistency should be resolved to make the Site Evaluation Worksheet as accurate as possible.

2.4       Working with the VPP Site Worksheet Computer Files

In analyzing the data from the pilot test of the VPP Site Worksheet, OSHA found that there were a number of "best practices" used by VPP evaluators that enabled them to use the Worksheet in an efficient manner. These best practices resulted in a significant reduction in the time required to complete the Worksheet.  Following are summaries of these best practices.

2.4.1    Dividing the VPP Site Worksheet Files among Team Members

One of the best practices used by evaluators in the pilot program was to split the worksheet files and divide responsibility for their completion among team members. The method used to do this is described below.

To reduce the size of the VPP Site Worksheet computer file, increase the ease of its use, and reduce potential computer malfunctions, the VPP Site Worksheet has been broken into a series of folders and files. Each area has a folder. Each section of the Worksheet has been saved as a unique file within the appropriate area folder. For example, Section I, Subsection A and Section I, Subsection B are saved as two separate and distinct files. Both files are saved in the Section I folder. In addition to the area folders, there is a folder that contains the entire Worksheet in one big file.

To successfully work with these files, on-site evaluators should use the following procedures to divide responsibilities for completion of the VPP Site Worksheet:

1)         The Team Leader should give all team members either a disk containing the full VPP Site Evaluation Worksheet if they will be able to complete the Worksheet on their own computers, or a hard (paper) copy of their assigned sections if computer resources are insufficient.

2)         Before individual team members separate to conduct the evaluation, the entire team should meet and briefly review their assignments. This is to ensure that all team members understand which sections they are responsible for, and what information is needed to complete their assigned portion of the Worksheet.

3)         When working with the files on the computer, team members should complete only their assigned sections.  They should save their work under a different file name, such as "Section I-B, Company XYZ, Billings, MT," to prevent its being mid up with the original document. This can be done by using the "Save as" function under the "File" menu on the word processing software. Change the name of the file in the "File name" window that appears.  If two team members are assigned to different sections of the same file, both should answer only their questions and then save their work with their own unique titles. The team leader will be able to open both files to copy and paste the information together as necessary (see instructions below for copying and pasting information).


2.4.2    Compiling the Final VPP Site Evaluation Worksheet

The following suggestions for compiling the VPP Site Worksheet sections into the final Worksheet are based on interviews with some of the team leaders.

1)         The Team Leader should get the disk or hardcopy back from each team member after the site evaluation.  Working alone to minimize group work (and thus person hours), the Team Leader should consolidate the different sections of the worksheet into a single document. To do this:

Open a blank MS Word document. Set the margins so that top and bottom are 1" and left and right are .5".

Insert the File titled "Cover Pages." To insert a file:

Put the cursor where you want to insert the file (in this case, at the top of the document).

Click on the Insert menu at the top of the document.

Click on File (to see this option you may have to expand the menu by clicking on the arrows at the bottom).

A browser window will appear. Use the browser to find the file you want to insert from its current location (in this case, most likely the A-drive, which is the floppy disk, or the C-drive if the file is already on the hard drive).

Double click on the file you want to insert.

Make all necessary changes to the cover pages of the VPP Site Worksheet.

Repeat the steps involved for inserting a file for all of the additional tables, gathered from the disks received from each team member.

Save the final document (you should also save as you go!).

2)         Since each team member may make additions to the "Additional Comments" file, the Team Leader should be prepared to copy and paste modifications in order to include all comments in the final report. To copy and paste sections of the document:

Highlight the section of the document you would like to copy. For sections of tables, highlight all the relevant cells or text, being sure to include the cells on the far right of the table, if necessary. If pasting into a blank document, be sure to set the margins for the top and bottom at 1" and the left and right margins at .5". This will ensure that the formatting remains consistent between the documents.

After highlighting a section, click on the Copy icon on the tool bar, or click on Copy under the Edit menu. If Copy is not given as a choice immediately, you may need to click on the extended-menu button (the double arrows at the bottom of the menu) to find it.

Place the cursor where you would like the information pasted. Click on the paste icon from the tool menu, or click on Paste from the Edit menu.

The Team Leader can edit the report sections either before compiling them or after consolidating them.


2.4.3    Single File Version

Team Leaders who do not wish to utilize the multiple file method may use a single file version. We do not recommend cutting and pasting the tables in this version. You are more likely to be successful if you keep just one master file and have team members take turns filling out their assigned sections on the master file.

 

 

 

 

Section 3

 

 

VPP Site Report


3. Vpp Site Report

The VPP Site Report replaces the previous Site Report. The purpose of the VPP Site Report is to provide the reviewers with a brief summary of the evaluators' findings upon completion of the site visit.  The VPP Site Report is to be prepared after the VPP Site Worksheet has been completed.

The VPP Site Report addresses ten basic topics and two conditional areas:

 

 

  • Purpose and Scope of Review
     
  • Method of Data Collection
     
  • Employees at the Worksite
     
  • The Worksite/Program Changes (for Re-Approvals)
     
  • Worksite Hazards
     
  • Injury and Illness Rates
     
  • OSHA Activity
     
  • Elements of VPP Review
     
  • Areas of Excellence (if applicable)
     
  • Recommendation
     
  • Merit Goals (if applicable)
     
  • OSHA Log Recordkeeping
     

An example of a completed VPP Site Report is located at the end of this section.

3.1 Preparing the VPP Site Report
< To complete the VPP Site report, evaluators should follow the steps listed below.

 

 

 

 

  1. First compile the information (from the VPP Site Worksheet) required for completion of the VPP Site Report.
     
  2. Once this information has been gathered and documented in the VPP Site Worksheet, present the information in paragraph form, as illustrated in the VPP Site Report Example in Section 3.3 below. Use the VPP Site Report Example as a model for developing a complete report.
     

3.2       OSHA Log Recordkeeping

Evaluators must review the VPP site's OSHA injury and illness logs as part of a complete on-site visit and include this analysis in the VPP Site Report. To ensure that the OSHA injury and illness logs are thoroughly reviewed, evaluators must address the following issues:

 

 

 

 

  • Prepare the Total Case Incidence Rate (TCIR) and Days Away from work, Restricted and Transferred (DART) activity case incidence rate calculation table.
     
  • Analyze the TCIR and DART rate
     
  • Compare the data contained in the site's OSHA injury and illness logs with the data presented in the site's VPP application.
     

The requirements for preparing each of these analyses are described below.

3.2.1    TCIR and DART Rate Calculation Table

Based on a review of the site's OSHA injury and illness logs, evaluators should first complete the TCIR and DART rate table. An example follows:

 

 

 

 

Year Hours Total # of Cases TCIR Number of Cases Involving Days Away from Work, Restricted Activity or Job Transfer DART Rate
1999 185,445 2 2.2 2 2.2
2000 216,212 2 1.9 1 0.9
2001 195,444 1 .1 0 0
Total 597,791 7   5  
Three-Year Rate (1999-2001) 2.3   1.7
BLS National Average for 2001 (SIC 3728) 8.6   4.2
2002 YTD 43,315 0 0.0 0 0.0

 


3.2.2    Analysis of the TCIR and DART Rate

In this section, site evaluators should present the site's TCIR and DART rate and the percentage above or below the BLS National Average for the appropriate SIC/NAICS code.

The analysis of the TCIR and DART rate in the above example should be presented as follows:

 

 

 

 

  • The Total Case Incidence Rate (TCIR) is 2.3 (73% below the 2001 BLS industry average for SIC 3728).
     
  • The Days Away from Work, Restricted Activity and Job Transfer (DART) Case Incidence Rate is 1.7 (60% below the 2001 BLS industry average for SIC 3728).
     

3.2.3    Comparison of OSHA Injury and Illness Logs to Site's VPP Application

Compare the site's OSHA injury and illness logs to the site's VPP application to determine whether the logs accurately reflect the injury and illness experience at the site. Also identify the individual responsible for maintaining the OSHA injury and illness log and verify that this individual understands OSHA's recordkeeping requirements.

3.2.4    Temporary Employees

To fully evaluate the injury and illness experience of temporary employees at the worksite, include the following information:

 

 

 

 

  • Whether temporary employees were at the worksite at the time of the site visit.
     
  • Whether injuries or illnesses experienced by temporary employees under the direct supervision of the site were recorded on the site's OSHA injury and illness log.
     
  • The number of temporary employee injuries recorded on the OSHA injury and illness log for the current year.
     

Review applicable contractor injury and illness data and make a judgment about whether the contractors at the site are experiencing the same quality level of safety and health protection as regular employees, and/or whether the site is transferring hazardous activities to applicable contractors in order to "hide" the hazards.

3.3       VPP Site Report Example

The following is an example of the VPP Site Report. Note that this example does not include the required analysis of the OSHA logs.

I. Purpose and Scope of Review

A VPP onsite evaluation recommending Star approval was conducted at Infinitium USA, L.P., Linden Technical Center, Linden, New Jersey from February 8 through February 10, 2002. The OSHA VPP Review Team (Team) consisted of: Tom Jones, Team Leader; Jim Jones, Industrial Hygienist; Mary Jones, Safety Specialist; Lisa Jones, Ph.D., a Chemical Engineering Specialist; and Michael Jones, VPP SGE.

II.        Data Collection Methods

The information for this report was obtained from the site's VPP application; documentation reviewed on-site, interviews with employees, and a walk-through of the plant. All areas of the plant were covered in at least one walk-through.

III.       Employees at the Worksite

There are 254 employees currently working on-site. In addition, 76 contractor employees are located on-site performing maintenance functions, implementing capital improvements, providing guard services, and staffing the cafeteria. The collective bargaining agents representing the employees on-site are the Independent Laboratory Employees Union , Inc. and the United Cafeteria Workers of America. Formal interviews were conducted with 20 employees and 10 contractors. In addition, informal interviews were conducted with 30 employees and 9 contractors.

IV.       The Worksite or Program Changes (for Re-Approvals)

The site is properly classified under the Standard Industrial Classification (SIC) code 2860 for industrial organic chemicals - not elsewhere classified. The site is a corporate research and development center built in 1998.  It consists of four buildings:  an office complex, a maintenance building, a blending operation, and a pilot plant. The buildings are spread across 75 acres. Non-hazardous organic chemicals are combined in the blending plant to produce a saline solution for use with contact lenses.  The pilot plant bottles and packages this solution for shipping. The site is not covered under OSHA's Process Safety Management (PSM) standard.

V. Worksite Hazards

The hazards located on this site are skin irritant chemicals; confined space hazards for the storeroom areas; uncontrolled hazardous energy sources from maintenance conveyers; sanitation process hazards, including exposure to sanitation chemicals; elevated noise levels; and material handling hazards, such as truck operations and extensive conveyers.

VI.       Injury and Illness Rates

The three-year Total Case Incidence Rate (TCIR) and Days Away from Work, Restricted Activity or Job Transfer (DART) case incidence rate for the period (1996-1999) are 0.3 and 0.1, respectively. The site TCIR is 92 percent below, and the DART rate is 94 percent below the 2001 BLS national industry average for SIC 2860.

VII.     OSHA Activity

There has been no OSHA inspection activity at the site in any of the last three years. The site has a positive relationship with the local OSHA office. The site contacted the OSHA Regional Office regarding participation in the VPP program.

VIII.    Elements of VPP Review

The OSHA VPP Review team examined each of the required elements of the site's safety and health management system and, in accordance with their application, found them to be consistent with the high quality of VPP programs.  The site meets all VPP requirements and all OSHA standards are appropriately covered. For specifics on the individual site program elements, consult the VPP Site Worksheet.

IX.       Areas of Excellence (if applicable)

There are two program elements of this site that are emplary and could be used as models for other sites in the same industry. These are:

 

 

 

 

  • Trend Analysis - The use of a safety and health database has resulted in trend analysis above and beyond what most sites in this industry address. They are able to pinpoint not only basic trends, but also potential interactive trends (particular locations and time of day, particular supervisors with a given piece of equipment on a particular shift) and have used this ability to target training, discipline, and corrective actions.
     
  • Machine Guarding - The machine guarding for the site is excellent. The guarding for the 200 Ton Press is particularly good. Such presses are difficult to guard effectively, but this site has found a rail, shield, and control panel system that is very effective.
     

X.        Recommendation for Participation

The OSHA VPP Review Team recommends participation of the Infinitium USA, L.P., Linden Technology Center, Linden, NJ, in the OSHA VPP Star Program.

XI.       Merit Goal

N/A

 

 

 

 

Section 4

 

 

Site Worksheet Minimum Requirement Guidance

 


This section will help evaluators to interpret VPP Minimum Requirements (MRs) found on the VPP Site Worksheet. Not every MR on the Site Worksheet is covered here; some items already have guidance written into the question. Instead, this section covers the MRs that require additional guidance to determine whether a site has met the MR and what other elements or sub-elements may have bearing on the MR.

Below is a definition of Minimum Requirement, followed by guidance for selected MRs. The specified sections and subsections are references to the Site Worksheet.


4.1       VPP Minimum Requirement Defined

A Minimum Requirement is a basic element or sub-element that the VPP considers critical to workplace safety and health. A Minimum Requirement must be at least minimally effective for the site to avoid regular or ongoing exposure of employees to serious workplace hazards.

A site is not "minimally effective" on an aspect of VPP if the site does not have one or more of the required elements of the program in operational status or ready for implementation. As a result employees may be exposed to a serious hazard or hazards. In some cases, the site may have the element, but it is so ineffective that it is as if the element did not exist.


4.2       Section I. Management Leadership and Employee Involvement

4.2.1    Section I, Subsection A. Written Safety and Health Management System


A3. Is the written safety and health management system at least minimally effective to address the scope and complexity of the hazards at the site? (Smaller, less complex sites require a less complex system).

 

 

 

  • This question is intended to elicit an overall professional judgment regarding the adequacy of the written program given the size and complexity of the site and it's hazards.
     
  • Things to consider include: size of the site, complexity of the site's work, and complexity of the hazards at the site.
     
  • As the worksite's size increases, it needs more formal communication and written documentation to reduce the likelihood of important elements being overlooked due to miscommunication or misunderstanding.
     

4.2.2    Section I, Subsection B. Management Commitment and Leadership

B1.  Does management overall demonstrate at least minimally effective, visible leadership with respect to safety and health? Provide examples.

 

 

 

 

  • Establishing clear linesof communication with employees.
     
  • Setting an example ofsafe and healthful behavior.
     
  • Creating an environmentthat allows for reasonable employee access to top site management.
     
  • Ensuring that all workersat the site, including contract workers, are provided equally high qualitysafety and health protection.
     
  • Clearly defining responsibility in writing, with no unassigned areas.  Each employee, at any level, must beable to describe his/her responsibility for safety and health.
     
  • Assigning commensurate authority to those who have responsibility.
     
  • Affording adequate resources to those who have responsibility and authority.  This includes such resources as time, training, personnel, equipment, budget, and access to information and experts, including appropriate use of certified safety professionals(CSP), certified industrial hygienists (CIH), other licensed health care professionals, and other experts as needed, based on the risks at the site.
     
  • Holding managers, supervisors, and non-supervisory employees accountable for meeting their safety and health responsibilities.  In addition to clearly defining and implementing authority and responsibility for safety and health protection, management leadership entails evaluating managers and supervisors annually, and operating a documented system for correcting deficient performance.
     

4.2.3    Section I, Subsection D. Authority and Line Accountability

D1.  Does top management accept ultimate responsibility for safety and health in the organization? (Top management acknowledges ultimate responsibility even if some safety and health functions are delegated to others.) If not, please explain.

 

 

 

 

  • The reliance on administrative controls makes it necessary that top management accept ultimate responsibility.  Without this acceptance, the administrative controls can easily fail.
     
  • OSHA believes that if a top manager attempts to delegate too much authority, safety and health efforts likely will fail.  There will be insufficient management leadership, which is necessary for successful injury and illness prevention.
     
  • It is also a problem when top managers delegate authority to persons who lack sufficient power or resources to ensure an effective safety and health management system.

D3. Do the individuals assigned responsibility for safety and health have the authority to ensure that hazards are corrected or necessary changes to the safety and health management system are made? If not, please explain.

 

 

 

 

  • Responsibility without commensurate authority to effect necessary changes often results in uncontrolled hazards or hazards with inferior/ineffective hazard controls.
     
  • Typically you'll find this situation when management has delegated responsibility to a safety and health person or someone with line function, but the person is unable to effect meaningful change.
     

D5.  Are adequate resources (for example, equipment, budget, or experts) dedicated to ensuring workplace safety and health? Provide examples.

 

 

 

 

  • Consistent with the definition of minimally effective, the key issue here is whether the lack of resources results in employees being exposed to serious uncontrolled hazards.
     

4.2.4    Section I, Subsection E. Contract Workers

E5.  Does the site's contractor program cover the prompt correction and control of hazards in the event that the contractor fails to correct or control such hazards? Provide examples.

 

 

 

 

  • If a site is failing to correct serious contractor-created hazards that either the original contractor or another contractor created and this results in exposing (any) employees to uncontrolled hazards, it is not minimally effective. This is more common in construction, for example, when a carpenter is exposed to hazards created by a mason and no one does anything about it, because "they" didn't create the problem and the mason is nowhere to be found.
     
  • Your answer here may have bearing on your response to the Minimum Requirement at Section I, Subsection B, B1. (See also FRN at III.F.5.d.)
     

E11.  Based on your answers to the above items, is the contract oversight minimally effective for the nature of the site? (Inadequate oversight is indicated by significant hazards created by the contractor, employees exposed to hazards, or a lack of host audits.)  If not, please explain.

 

 

 

 

  • Guidancehere is provided within the parenthetical portion of the question.
     
  • Youranswer here may have bearing on MR I.B.B1. (See also FRN atIII.F.5.d.)
     

4.2.5    Section I, Subsection F. Employee Involvement

F3. Do employees support the site's participation in the VPP Process?

 

 

 

 

  • To be minimally effective, overall, employees must be aware of the VPP program and must support the site's participation.
     
  • It is understood that some small number of employees may not support the participation, but the key consideration is whether there is sufficient support that the program can be effectively implemented.  Sufficient employee support is essential if administrative hazard controls are to be effective, because employees often must perform certain actions diligently.  Without employee support, it is likely that administrative controls will be compromised and employees exposed to uncontrolled hazards.
     

F4.  Do employees feel free to participate in the safety and health management system without fear of discrimination or reprisal? If not, please explain

 

 

 

 

  • The issue is whether employees can participate in activities in the safety and health management system without fear that their participation may lead to adverse consequences.
     
  • For example, there should be no reprisals for participating in an accident investigation or for reporting a hazard or near miss.
     

F9. Do employees have access to results of self-inspection, accident investigation, appropriate medical records, and personal sampling data upon request? If not, please explain.

 

 

 

 

  • It is not minimally effective if the employer refuses to provide such information when requested by employees, or otherwise deliberately prevents access to such records.
     
  • See CFR1910.1020 for appropriate records.
     

4.3       Section II. Worksite Analysis

4.3.1 Section II, Subsection B.  Baseline Hazard Analysis


B1.  Has the site been at least minimally effective at identifying and documenting the common safety and health hazards associated with the site (such as those found in OSHA regulations, building standards, etc., and for which existing controls are well known)?  If not, please explain.

 

 

 

 

  • A baseline survey and analysis is a first attempt at understanding the hazards at a worksite. It establishes initial levels of exposure (baselines) for comparison to future levels, so that changes can be recognized.  Systems for identifying safety and industrial hygiene hazards, while often integrated, may be evaluated separately. Baseline surveys must:
     
  • Identify and document common safety hazards associated with the site (such as those found in OSHA regulations or building standards, for which existing controls are well known), and how they are controlled.
     
  • Identify and document common health hazards (usually by initial screening using direct-reading instruments) and determine if further sampling (such as full-shift dosimetry) is needed.
     
  • Identify and document safety and health hazards that need further study.
     
  • Cover the entire worksite; indicate who conducted the survey, and when it was completed.
     
  • The original baseline hazard analysis need not be repeated subsequently unless warranted by changes in processes, equipment, hazard controls, etc.
     
  • Refer back to the definition of minimally effective provided above.
     
  • Your response to this item may have bearing on your answer to the Minimum Requirement at Section I, Subsection A, A3.
     

4.3.2    Section II, Subsection C.  Hazard Analysis of Routine Activities

C1.  Is there at least a minimally effective hazard analysis system in place for routine operations and activities?

 

 

 

 

  • The requirement is NOT for hazard analyses to be done routinely, but to be performed on routine activities.
     
  • Task-basedor system/process hazard analyses must be performed to identify hazards ofroutine jobs, tasks, and processes in order to recommend adequate hazardcontrols. Acceptable techniquesinclude, but are not limited to, Job Hazard Analysis (JHA) and ProcessHazard Analysis (PrHA).
     
  • Hazard analyses should be conducted on routine jobs, tasks and processes that:
     
    • Have written procedures.
       
    • Have had injuries/illnesses associated with them or have experienced significant incidents or near-misses.
       
    • Are perceived as high-hazard tasks, for example, tasks that could result in a catastrophic explosion, electrocution, or chemical overexposure.
       
    • Have been recommended by other studies and analyses for more in-depth analysis.
       
    • Are required by a regulation or standard.
       
    • Any other instance when the VPP applicant or participant determines that hazard analysis is warranted.
       
  • A good hazard analysis describes where it is happening (environment), who or what it is happening to (exposure), what precipitates the hazard (trigger), the outcome should it happen (consequence), and other contributing factors.
     
  • Your response to this item may have bearing on your answer to the Minimum Requirement at Section I, Subsection A, A3.
     

4.3.3 Section II, Subsection E.  Routine Inspections

E1. Does the site have a minimally effective system for performing safety and health inspections (a minimally effective system identifies hazards associated with normal operations)? If not, please explain.

 

 

 

 

  • Here the parenthetical provides guidance:  A minimally effective system will identify hazards associated with normal operations at the site.
     
  • A good inspection should verify that existing controls are still in place and effective.
     
  • A dynamic work environment where conditions change frequently may need more frequent inspections.
     

4.3.4 Section II, Subsection F.  Hazard Reporting System

F4.  Does a minimally effective tracking system exist that results in hazards being controlled?

 

 

 

 

  • A documented system must be in place to ensure that hazards identified by any means (self-inspections, accident investigations, employee hazard reports, preventive maintenance, injury/illness trends, etc.) are assigned to a responsible party and corrected in a timely fashion.  This system must include methods for:
    • Recording and prioritizing hazards.
       
    • Assigning responsibility, time frames for correction, interim protection, and follow-up to ensure abatement.
       
  • The Section I Minimum Requirements at D4 and D5 may influence your response to this MR.
     

F6.  Is there a minimally effective means for employees to report hazards and have them addressed?

 

 

 

 

  • To be minimally effective, employees must be free to report a hazard and mustbe able to have their concerns addressed, that is, reported hazards controlled.
     

4.3.5 Section II, Subsection G.  Accident/Incident Investigation

G1.  Is there a minimally effective system for conducting accident/incident investigations?

 

 

 

 

  • An investigation system is not minimally effective if
     
    • it does not include investigation of incidents (including near misses) where significant hazards are present.
       
    • investigations of accidents and incidents are conducted but do not include a reasonable attempt to identify contributing factors.
       

4.3.6 Section II, Subsection I.  Trend Analysis

I1.  Does the site have a minimally effective means for identifying and assessing trends?

 

 

 

 

  • The trend analysis is not minimally effective if the evaluation team finds easily observable trends that indicate serious uncontrolled hazards.
     
  • Your response to MR II. I4 may have bearing.
     

4.4 Section III: Hazard Prevention and Control

4.4.1 Section III, Subsection A. Hazard Prevention and Control

A1.  Does the site select at least minimally effective controls to prevent exposing employees to hazards?

 

 

 

 

  • The concern here is not whether the site followed the hierarchy of controls,but whether the selected controls protect employees from exposure toserious hazard.
     

A10. Does the site have minimally effective written procedures for emergencies?

 

 

 

 

  • The issue here is whether the site has a procedure for dealing with foreseeable emergencies.
     
  • If no emergency plan exists, or the plan is so limited that it does not address foreseeable emergencies (TED 3-16 3h), it is not minimally effective.
     

4.5 Section IV. Safety and Health Training

4.5.1 Section IV, Subsection A. Safety and Health Training

A4. Does the site provide minimally effective training to educate employees regarding the known hazards of the site and their controls?  If not, please explain.

 

 

 

 

  • If, in general, the employees are not knowledgeable about serious hazards at thesite and their controls, then the training cannot be considered minimally effective
     

 

 

 

 

 

 


 

 

 

 

 

 

Appendix G
Recommended Interview Questions

 

 

 

  1. Purpose.  Interviews are an important tool in assessing the effectiveness of a site's safety and health programming.  These questions are intended to guide the OSHA reviewer during oral employee interviews. To begin, explain the purpose of the interview and the reason for OSHA's presence at the site. Make employees aware that interviews are kept confidential and that the employee's responses will not in themselves determine company approval or disapproval.
     
  2. General Employee Interview Questions
     
    1. How long have you worked here?
       
    2. Tell me about your job.  What do you do during a typical day?
       
    3. What are the safety and health hazards of your job?
       
    4. How do you protect yourself from those hazards? What kind of personal protective equipment do you wear? Were you provided training?
       
    5. What type of safety and health training have you received?
       
    6. What happens if management disobeys a company safety rule? If an employee disobeys?
       
    7. How do you respond in the event of a fire, hazardous waste spill, alarm, or medical emergency?
       
    8. What does VPP mean to you?
       
    9. What is one method of reporting a safety or health concern? What was the last unsafe practice you reported and/or corrected?
       
    10. How do your supervisors demonstrate their involvement in safety and health?
       
    11. Have you ever seen anyone testing the air, noise levels, or conducting other surveys for possible health hazards? Do you know what the results were or what they meant?
       
    12. Have you or anyone you know ever been injured or experienced a job related illness? What is the procedure when someone is injured?
       
    13. How are you involved in the safety decision-making process?
       
    14. Is safety and health valued in your organization?
       
    15. What is one objective in your department's safety program?
       
    16. How does management support your involvement in safety?
       
    17. What are your rights under OSHA?
       
    18. Is there anything else you think we should know about the safety and health program here?
       
  3. Supervisors
     
    1. How long have you worked here?  When did you become a supervisor?  
       
    2. What do you see as your role in safety and health?
       
    3. To what kinds of hazards are you and/or your employees exposed?
       
    4. Has the company's upper management provided adequate resources for safety and health programming, such as funding, time, and technical support?
       
    5. What do you do when you discover a hazard in your area?
       
    6. What do you do when an employee reports a hazard in your area?
       
    7. Do you provide employee training in safety related topics? (If so, please describe.)
       
    8. Please give some examples where you had to use the disciplinary system for infractions of safety and health rules.
       
    9. When was the last emergency drill? What is your role in drills?
       
    10. How are you held accountable for ensuring safe and healthful working conditions in your area?
       
    11. At high hazard chemical plants only: Is maintenance satisfactory, particularly on release prevention equipment? Is there adequate supervision provided for work performed on all shifts?
       
    12. Do you have contract employees working in your area? If so, how do you control and address safety or health hazards relating to or created by them? 
       
    13. Are there routine or unannounced inspections? Who participates?
       
  4. Administrators and Executives
     
    1. How long have you been with (company)?
    2. Describe the type of safety and health hazards at this site.
       
    3. How does management ensure that employee exposure to those hazards is eliminated or controlled?
       
    4. How do you demonstrate leadership in and commitment to safety and health?
       
    5. What benefits will a VPP partnership provide for your company?
       
    6. What do you think are your facility's Abest practices@ in safety and health?
       
    7. How do you address the competing pressures of production and safety?
       
    8. How do you hold your supervisors accountable for safety and health? Have you ever had to discipline a supervisor for not following the rules?
       
    9. How are you held accountable for your safety and health responsibilities?
       
  5. Recordkeepers
     
    1. Who is responsible for recordkeeping?
       
    2. Is your site recordkeeping centralized? Is it computerized?
       
    3. Do you have a completed Summary of Occupational Injuries and Illnesses for the last 3 calendar years?  Do you have the supplemental documentation for each case entered on the log?
       
    4. Which form do you use as the supplementary record: OSHA's First Report of Injury, a State workers' compensation form, an insurer's form, or other?
       
    5. What is the process by which injury and illness information gets to the recordkeeper? After an injury or illness occurs, how long does it take to enter it on the log?
       
    6. What type of reference material do you refer to for guidance on keeping illness and injury records?  
       
    7. Who decides whether or not a case is recordable?
       
    8. How do you determine whether or not a case is work related?
       
    9. Do you record any cases on the OSHA forms that are not compensable under workers' compensation?
       
    10. How do you distinguish between an injury and an illness? Between medical treatment and first aid?
       
    11. When does a case involve lost workdays? What constitutes restricted work activity?
       
    12. What is your process for monitoring applicable contractor logs?
       
    13. How do you safeguard the confidentiality of medical records?
       
    14. How do you assure that any work restrictions are applied appropriately?
       
    15. How have you assured timely and clear communications with the health care professional?
       
  6. Occupational Health Care Professionals
     
    1. What are your qualifications and licenses?
       
    2. What procedures are in place to ensure that health care services are delivered consistently and effectively?
       
    3. What type of audit procedures do you use to compare your process with acceptable standards of practice and OSHA requirements?
       
    4. Are employees provided timely access to services?
       
    5. How do you assure that work restrictions or work removal are followed?
       
    6. How are you made aware of the job hazards at this facility? Are you included in identification of workplace hazards, or development of restricted duty jobs, or other onsite issues?
       
    7. What kinds of health surveillance programs are in place?
       
    8. How do you communicate health surveillance data to employees and management to reduce future risk?
       
    9. Explain how you evaluate the effectiveness of your occupational health care program.
       
  7. Maintenance Personnel
     
    1. Is there a scheduled preventive maintenance program? How is it carried out?
       
    2. At sites covered by Process Safety Management (PSM): Does the preventive maintenance program include:
       
      1. Critical instrumentation and controls?
         
      2. Pressure relief devices and systems?
         
      3. Metals inspection?
         
      4. Environmental controls, scrubbers, filters, etc.?
         
    3. At PSM sites: Does the design, inspection, and maintenance activity include procedures to prevent piping cross-connections between potable water systems and non-potable systems?
       
      1. How are these procedures carried out?
         
      2. How are systems monitored and inspected to find any cross-connections?
         
    4. Do maintenance personnel participate in safety functions?
       
    5. Is there a priority system for safety/environmental related maintenance items? Is it being followed?
       
    6. Does the preventive maintenance program include onsite vehicles, sprinkler systems, detection/alarm equipment, fire protection and emergency equipment?
       
    7. Do you have input concerning safety and ease of maintenance for new equipment and machinery purchases?
       
    8. Do you have an inventory of spare parts critical to safety and environmental protection?
       
    9. Are you trained in the control of hazardous energy and the proper use of locks and tags?
       
    10. Is there a system in place to track requests for repairs?
       
    11. What methods are used to monitor the condition of critical equipment?
       
    12. What is the ratio of scheduled versus unscheduled maintenance work?
       
    13. What has the trend been like over the past few years?
       
  8. General Questions for Onsite Evaluations to Determine Reapproval
     
    1. Describe any changes in your job or in the handling of safety issues since the last OSHA onsite evaluation.
       
    2. How familiar are you with VPP?  Has your awareness increased since the last visit?
       
    3. Do you have any increased knowledge of your rights under the program, including your right to receive upon request results of self-inspections or accident investigations?
       
    4. Do you feel that the VPP partnership has had a positive impact on your job and your safety?
       
    5. Have you noticed any changes in safety and health conditions here since the site's approval in VPP?
       

 

 

 

 

 


 

 

 

 

 

 

Appendix H
Sample Letters


Letters Related to the Application:

Letter Acknowledging Withdrawal:

Assistant Secretary Approval Letters:

Regional Administrator 2-Year Rate Reduction Plan Letter:

Regional Administrator 1-year Conditional Letter

Regional Administrator 1-year Conditional Plus2-Year Rate Reduction Plan Letter

Assistant Secretary Congratulatory Letters:

Congressional Letters

Press Release:

 

 

 

 

Sample Letter Acknowledging Receipt of an Application


[Inside Address]

Dear [Mr./Ms/Dr. Last Name]:

Thank you for your application to OSHA's Voluntary Protection Programs (VPP), which we received on [date received].

We will review your application against the program requirements and contact you to discuss the findings. When we determine that your application contains all of the information required, we will schedule the onsite evaluation.

We appreciate your interest in the VPP and look forward to working with you in your efforts to ensure your employees a safe and healthful workplace.  Please do not hesitate to contact me if you have any questions about the VPP or the preapproval process.

Sincerely,



[Name]

VPP Manager



cc: Area Director
     DCSP/VPP

 

 

 

 

Sample Letter Acknowledging Application Review and Requesting Additional Information


[Inside Address]

Dear [Mr./Ms/Dr. Last Name]:

Thank you for your application to OSHA's Voluntary Protection Programs (VPP).  I have reviewed your VPP application and found it to be comprehensive and well prepared. However, there are a few items that need additional clarification or explanation before we can consider the application as accepted. For your reference I am enclosing a copy of the application instructions.

Please respond to the following observations:

[Insert a bulleted list]

The VPP directive allows you up to 90 days to submit the requested information.

If you have any questions please call me at [telephone number]

Sincerely,



[Name]

VPP Manager

 

 

 

 

Sample Letter Returning an Application at the Applicant's Request.


[Inside Address]

Dear [Mr./Ms/Dr. Last Name]:

As requested in your letter dated [date of previous letter], we are returning your application to OSHA's Voluntary Protection Programs (VPP).  We consider this application withdrawn as of today.

We appreciate your efforts to ensure a quality safety and health management system for your facility and your interest in the VPP. I know that you are aware that you may reapply when you believe that all requirements have been met.

Please call [name], VPP Manager at [telephone number] if you have any questions.

Sincerely,



[Name]

Regional Administrator

cc: DCSP
     Area Director

 

 

 

 

Sample letter returning an application due to insufficient information.


[Inside Address]:

Dear [Mr./Mrs./Dr/ Last Name]:

Your application for the Voluntary Protection Programs (VPP) was received on [date application was received] and was found to be in need of additional information, as explained in our letter of [date of letter to site requesting additional information]. That letter was followed up on [date of follow-up]. Since we have not received the requested information we must, according to our written procedures, return your application and consider it as withdrawn as of today.

We appreciate your interest in the VPP and your commitment to ensuring a safe workplace for your employees. Please be assured that you may reapply to the VPP at any time.

Please call [name], VPP Manager at [telephone number] if you have any questions.

Sincerely,



[Name]

Regional Administrator

cc: DCSP/VPP

 

 

 

Sample Letter Acknowledging Withdrawal of a Participating Site


[Inside Address]

Dear [Mr./Ms/Dr. Last Name]:

This is to acknowledge your letter dated [date of previous letter] requesting withdrawal of your site from the Voluntary Protection Programs (VPP) because [reasons for withdrawal]. Your request has been accepted effective [date of withdrawal].

We appreciate your commitment to the safety and health of all of your employees and your commitment to the VPP. VPP Manager [Name] has told me of [his/her] very positive experiences with you and your company.

In view of the withdrawal, the VPP certificate and flag are no longer valid and may not be displayed. In addition, we have notified the local OSHA Area Office that you are no longer a VPP worksite.

You may reapply for the VPP at any time, without prejudice.

Please call VPP Manager [name] at [telephone number] if you have any questions.

Sincerely,



[Name]

Regional Administrator

cc: DCSP/VPP
      Area Director

 

 

Sample Approval Letter: Star


[Inside Address]

Dear [Mr./Ms/Dr. Last Name]:

It is my pleasure to inform you that your site has been approved for participation as a Star site in OSHA's Voluntary Protection Programs (VPP).  Please accept my hearty congratulations on this accomplishment. Enclosed is a copy of the VPP Onsite Evaluation Report recommending approval of [long/legal site name, city/state].  

Your designation as a VPP site is testament to sustained excellence in all areas of your safety and health management system. Your site will be removed from the scheduled OSHA inspection list.  Participation in the VPP does not, of course, diminish the rights and responsibilities extended to you and your employees by the Occupational Safety and Health Act of 1970.  Employee complaints, fatalities, catastrophes, chemical leaks/spills, or other significant events at your site will result in normal OSHA enforcement proceedings.

Each year by February 15th, please submit to OSHA your most recent safety and health management system evaluation. Also submit the following site-specific information for your facility and for each applicable contractor:

 

 

 

  1. Injury and illness numbers and rates
  2. Total hours worked
  3. Average annual employment
  4. Any success stories you would like to share
     

Send this information to the attention of [name], VPP Manager via:

 

 

 

 

[Name]
Regional Administrator
U.S. Department of Labor - OSHA
Address
City/State/Zip

The certificate and flag honoring your achievement will be delivered to [OSHA contact person] within 1 month. [He/She] will contact you at that time to arrange for its presentation.

Again, congratulations to you and the [site name] employees for your hard work and dedication to the principles embodied in the VPP. I wish you and your employees continued success in your safety and health efforts.

Sincerely,



[Name]

Assistant Secretary

Enclosure

 

 

 

 

Sample Approval Letter: Merit


[Inside Address]:

Dear [Mr./Ms/Dr. Last Name]:

It is my pleasure to inform you that your site has been approved for participation as a Merit site in OSHA's Voluntary Protection Programs (VPP).  Please accept my hearty congratulations on this accomplishment. Enclosed is a copy of the VPP Onsite Evaluation Report recommending approval of [long/legal site name, city/state].

Your designation as a VPP site is testament to the level of excellence you have achieved in your safety and health management system. Your site will be removed from the scheduled OSHA inspection list. Participation in the VPP does not, of course, diminish the rights and responsibilities extended to you and your employees by the Occupational Safety and Health Act of 1970.  Employee complaints, fatalities, catastrophes, chemical leaks/spills, or other significant events at your site will result in normal OSHA enforcement proceedings.

Your status as a Merit site is valid for up to 3 years. Of course, you can qualify for Star approval before that time if you meet your Merit goals.

Each year by February 15th, please submit to OSHA your most recent safety and health management system evaluation. Also submit the following site specific information for your facility and for each applicable contractor:

 

 

 

 

  1. Injury and illness numbers and rates
  2. Total hours worked
  3. Average annual employment
  4. Any success stories you would like to share
     

Send this information to the attention of [name], VPP Manager via:

 

 

 

 

[Name]
Regional Administrator
U.S. Department of Labor - OSHA
Address
City/State/Zip

The certificate and flag honoring your achievement should be delivered to [OSHA contact person] within 1 month. [He/She] will contact you at that time to arrange for its presentation.

Again, congratulations to you and the [site name] employees for your hard work and dedication to the principles embodied in the VPP. I wish you and your employees continued success in your safety and health efforts.

Sincerely,



Assistant Secretary

Enclosure

 

 

 

 

Sample Approval Letter: Merit to Star


[Inside Address]:

Dear [Mr./Ms/Dr. Last Name]:

It is my pleasure to approve the advancement of [site name] in the Star Voluntary Protection Program (VPP). Please accept my hearty congratulations on this accomplishment. Enclosed is a copy of the VPP Onsite Evaluation Report recommending approval of [long/legal site name, city/state].

The management and employees of the [site name] should take great pride in this accomplishment. You have completed your Merit goals in a timely fashion. Your dedication and perseverance have allowed you to set your safety and health benchmark at a level to which few companies can aspire.  Worksites like yours truly demonstrate the effectiveness of the VPP.

Your designation as a VPP site is testament to sustained excellence in all areas of your safety and health management system. Your site will continue to be removed from the scheduled OSHA inspection list. Participation in the program does not, of course, diminish the rights and responsibilities extended to you and your employees by the Occupational Safety and Health Act of 1970.  Employee complaints, fatalities, catastrophes, or significant chemical leaks/spills at your site will result in normal OSHA enforcement proceedings.

Each year by February 15th, please submit to OSHA your most recent safety and health management system evaluation. Also submit the following site-specific information for your facility and each applicable contractor:

 

 

 

 

  1. Injury and illness numbers and rates
  2. Total hours worked
  3. Average annual employment
  4. Any success stories you would like to share
     

Send this information to the attention of [name], VPP Manager via:

 

 

 

 

[Name]
Regional Administrator
U.S. Department of Labor - OSHA
Address
City/State/Zip

The certificate and flag honoring your achievement should be delivered to [contact person] within 1 month. [He/She] will contact you at that time to arrange for its presentation.

Again, congratulations to you and the [site name] employees for your hard work and dedication to the principles embodied in the VPP. I wish you and your employees continued success in your safety and health efforts. Sincerely,



[Name]

Assistant Secretary

Enclosure

 

 

 

 

Sample Letter for 2-Year Rate
(After review of annual submission)


[Inside Address]

Dear [Mr./Ms/Dr. Last Name]:

I have received the [year] annual evaluation submission for [site name, city, state]. Thank you for your timely correspondence. A review of your records indicates a 3-year [total case incidence rate (TCIR) and/or days away, restricted, and/or transfer DART rate ] of [x.x and/or x.x, respectively]. [This is x% or These are x% and x%, respectively] above the Bureau of Labor Statistics= (BLS) rate of [x.x and/or x.x]. The injury/illness rate computation chart is included for your information.

Policy mandates that whenever the 3-year TCIR or DART rate of a Star Program participant exceeds the latest national average published by BLS, the participant must develop a plan to improve the safety and health management system so that the site's 3-year TCIR and DART rates can once again be below the national average. This must be accomplished within 2 years. The participant remains in the Star Program during this time; however, if unable to accomplish this reduction within the allotted 2 years, the participant will be requested to withdraw from the VPP.

As a Star site, I am confident that you have already implemented such a plan.  To remain in the VPP Program, [site name] must decrease the 3-year [TCIR and/or DART rate ] to below the latest BLS industry rates by [Month Year]. Your plan to accomplish this reduction must be submitted to [VPP Manager or designee] at [address] as soon as possible.

If you have any questions or need additional information you may contact [VPP Manager or designee] at [telephone number].    

Sincerely,



[VPP Manager or designee]

Enclosure


For Regional Administrator reapproval letters that do not involve Conditional status or a Rate Reduction Plan, use the sample Assistant Secretary Approval Letter on page G-7 and modify accordingly.

 

 

 

 

Sample Regional Administrator's Reapproval Letter:
1-Year Conditional Star


[Inside Address]

Dear [Mr./Ms/Dr. Last Name]:

I have reapproved your site for participation in the Star Voluntary Protection Program on 1-Year Conditional status. Enclosed is a copy of the VPP Onsite Evaluation Report recommending approval of [long/legal site name, city/state].

I reviewed the report and am particularly pleased to see that you have [insert an aspect of the site's safety and health management system that remained at Star quality]. However, several of the VPP elements for an effective safety and health management system have not been maintained at Star quality. The VPP onsite team has assured me that you are fully committed to the VPP and will meet your 1-Year Conditional goal[s].

You must submit quarterly progress reports towards meeting your goal[s] to [name], VPP Manager at the address below. An onsite evaluation will be conducted 1 year from the end of the 90-day period, on or before [date]. If it is determined that your goal[s] [has/have] been accomplished, the Conditional status will be lifted.

Participation in the Star Program does not, of course, diminish the rights and responsibilities extended to you and your employees by the Occupational Safety and Health Act of 1970. Your site will continue to be removed from the scheduled OSHA inspection list; however, employee complaints, fatalities, catastrophes, or significant events at your site will result in normal OSHA enforcement proceedings.

In addition to your quarterly progress reports, each year by February 15, please submit to OSHA your most recent safety and health management system evaluation. Also submit the following site specific information for your facility and each applicable contractor:

 

 

 

 

  1. Injury and illness numbers and rates
  2. Total hours worked
  3. Average annual employment
  4. Any success stories which you would like to share
     

Send this information to the attention of [name], VPP Manager via:

 

 

 

 

[Name]
Regional Administrator
U.S. Department of Labor - OSHA
Address
City/State/Zip

Should you have any questions or need assistance, your contact person in OSHA's [City] Regional Office is [name].

I am confident that you will achieve your goal[s] and return to the highest level of safety and health excellence.

Sincerely,



[Name]

Regional Administrator

Enclosure

 

 

 

 

Sample Regional Administrator's Reapproval Letter:
1-Year Conditional Star Plus 2-Year Rate Reduction Plan


[Inside Address]

Dear [Mr./Ms/Dr. Last Name]:

This letter is to inform you that I have reapproved your site for participation in the Star Voluntary Protection Program (VPP) on 1-Year Conditional status with a 2-Year Rate Reduction Plan 2-Year Rate Reduction Plan" Enclosed is a copy of the VPP onsite evaluation report recommending approval of [long/legal site name, city/state].

I reviewed the report and I am particularly pleased to see that you have [insert an aspect of the sites safety and health management system that remained at Star quality]. However, several of the VPP elements for an effective safety and health management system have not been maintained at Star quality. This has resulted in a 3-year [total case incident rate (TCIR) and/or days away, restricted, and/or transfer (DART) rate] that [is/are] above the most recently published Bureau of Labor Statistic's (BLS) national average[s].

Policy mandates that whenever the 3-year TCIR or DART rate of a Star program participant exceeds the latest national average published by BLS, the participant must develop and submit a plan to improve the safety and health management system so that the site's 3-year TCIR and DART rates can once again be below the national average. This must be accomplished within 2 years.

In addition, the VPP onsite team has assured me that you are fully committed to the VPP and will meet your 1-Year Conditional goal[s]. You must submit quarterly progress reports towards meeting these goal(s).  An onsite evaluation will be conducted 1 year from the end of the 90-day period, on or before [date].  If it is determined that your goal[s] [has/have] been accomplished, the Conditional status will be lifted.

Participation in the Star Program does not, of course, diminish the rights and responsibilities extended to you and your employees by the Occupational Safety and Health Act of 1970. Your site will be continue to be removed from the scheduled OSHA inspection list; however, employee complaints, fatalities, catastrophes, or significant events at your site will result in normal OSHA enforcement proceedings.

In addition to your 2-year rate reduction plan and quarterly progress reports, each year by February 15, please submit to OSHA your most recent safety and health management system evaluation. Also submit the following site-specific information for your facility and each applicable contractor:

 

 

 

 

  1. Injury and illness numbers and rates
  2. Total hours worked
  3. Average annual employment
  4. Any success stories that you would like to share

Send this information to the attention of [name], VPP Manager via:

 

 

 

 

[Name]
Regional Administrator
U.S. Department of Labor - OSHA
Address
City/State/Zip

Should you have any questions or need assistance, your contact person in OSHA's [City] Regional Office is [name].

Congratulations on achieving a high level of worker safety and health protection.  I am confident that you will achieve your goal(s), prevent future injuries and illnesses, and return to the highest level of safety and health excellence.

Sincerely,



[Name]

Regional Administrator

Enclosure

 

 

 

 

Sample Assistant Secretary's Congratulatory Letter for Reapprovals


[Inside Address]

Dear [Name]:

I have been informed by Regional Administrator [name] that you were recently approved for continued participation in the Voluntary Protection Programs (VPP) as a [Star/Merit] site. Please accept my hearty congratulations on your sustained excellence in all aspects of workplace safety and health.

Your reapproval to the VPP is a strong endorsement of the continued dedication to workplace safety and health demonstrated by you and your employees at [site name]. [Insert some site individuality here.] As a participant in the VPP, you hold a position as an industry leader in workplace safety and health and serve as a model for what a safety and health management system can be. We encourage you to educate and mentor others in the benefits of worker safety and health.

A plaque honoring your achievement will be delivered to [name], VPP Manager, within 1 month. [He/She] will contact you at that time to arrange for its presentation. You and everyone who has worked to maintain this level of excellence should be very proud.

I wish you and your employees continued success in your safety and health efforts.

Sincerely,



[Name]

Assistant Secretary

 

 

 

 

Sample Assistant Secretary's Congratulatory Letter for One-Year Conditional Star


[Inside Address]

Dear [Name]:

I have been informed by Regional Administrator [name] that you were recently reapproved to the Star Voluntary Protection Program (VPP).  Although you have been temporarily placed on 1-Year Conditional status, the VPP review team assured me in its report that your commitment to safety and health and to the VPP principles remains strong.  As part of that commitment, you have agreed to implement [number] 1-Year Conditional goals to strengthen worker safety and health at [company name]. I am confident that you will be able to meet the goals and return to full Star participation.

I recognize that [company name] has been a longstanding participant in the VPP. As such, you hold a position as an industry leader in workplace safety and health and serve as a model for what a safety and health management system can be.

You should remain proud of all you have accomplished and strive for continuous improvement in the future. I wish you and your employees success in your safety and health efforts.

Sincerely



[Name]

Assistant Secretary


THIS INITIAL APPROVAL LETTER IS MAILED TO: 2 SENATORS [LIST FIRST AND LAST NAMES], 1 CONGRESSMAN [LIST FIRST AND LAST NAME] AND GOVERNOR [LIST FIRST AND LAST NAME].

The Honorable [FULL NAME] - see www.senate.gov (Senators)
United States Senate
Washington, DC 20510

Dear Senator [LAST NAME]:

OR

The Honorable [FULL NAME] - see www.house.gov (Congressman)
U.S. House of Representatives
Washington, DC 20515
Dear Congressman/Congresswoman [LAST NAME]:

OR

The Honorable [FULL NAME] - see www.nga.org (Governor)
Governor of [STATE]
[STREET ADDRESS]
[CITY, STATE AND ZIPCODE]
Dear Governor [LAST NAME]:

I am very pleased to inform you of the exceptional achievement of [WORKSITE NAME, CITY, STATE] in the field of occupational safety and health.  After considerable effort by the entire workforce and a rigorous review by the Occupational Safety and Health Administration (OSHA), your constituents have received this agencv's approval as a [STAR, DEMONSTRATION OR MERIT] participant in our Voluntary Protection Programs (VPP). Fewer than 650 worksites under Federal jurisdiction currently share the honor of VPP recognition.

Since 1982, OSHA has been recognizing American worksites that have emplary records and show continued commitment to workplace safety and health.  Sites meeting VPP's demanding requirements typically experience injury and illness rates 53 percent below their industry average.

VPP sites are good citizens and good neighbors. They become models for what employers and employees can achieve by working cooperatively with one another and with OSHA to achieve a level of worker protection that goes beyond compliance with government regulations.  VPP participants mentor other businesses, promote safety and health within their communities, and assist OSHA in important ways. For example, qualified volunteers from VPP sites worked alongside OSHA specialists in the effort to protect the recovery workers at the World Trade Center site.  Others, after training and designation as Special Government Employee Special Government Employees" s, join OSHA teams to perform onsite safety and health assessments of companies wishing to join VPP and current participants seeking reapproval. The owners of VPP sites generously bear the costs of such service; there is no cost to OSHA.

OSHA is pleased to work with and to recognize the men and women of [SITE NAME] for their commitment to workplace safety, and we appreciate the opportunity to let you know of your constituents' achievements in this area.

For your information, my letter approving the site to VPP has gone to [NAME, TITLE, SITE NAME AND ADDRESS FROM ASS'T SECY's APPROVAL LETTER].

Sincerely,



[Name]

Assistant Secretary


THIS REAPPROVAL LETTER IS MAILED TO : 2 SENATORS [LIST FIRST AND LAST NAMES], 1 CONGRESSMAN [LIST FIRST AND LAST NAME] AND GOVERNOR [LIST FIRST AND LAST NAME]:

The Honorable [FULL NAME] - see www.senate.gov (Senators)
United States Senate
Washington, DC 20510

Dear Senator [LAST NAME]:

OR

The Honorable [FULL NAME] - see www.house.gov (Congressman)
U.S. House of Representatives
Washington, DC 20515

Dear Congressman/ Congresswoman [LAST NAME]:

OR

The Honorable [FULL NAME] - see www.nga.org (Governors)
Governor of [STATE]
[CITY, STATE AND ZIP CODE]

Dear Governor [LAST NAME]:

I am very pleased to inform you of the continuing exceptional achievement of [WORKSITE NAME, CITY, STATE] in the field of occupational safety and health.  The considerable effort by the entire workforce was evident during a rigorous review that the Occupational Safety and Health Administration (OSHA) recently conducted. Consequently, I have reapproved your constituents to our Voluntary Protection Programs (VPP) at the [STAR, DEMONSTRATION, OR MERIT] level. [WORKSITE NAME] has now been a VPP participant for [# - SEE COVER SHEET] years.

Since 1982, OSHA has been recognizing American worksites that have emplary records and demonstrate commitment to workplace safety and health.  Fewer than 650 worksites under Federal jurisdiction currently share this honor. Sites meeting VPP's demanding requirements typically experience injury and illness rates 53 percent below their industry average.

VPP sites are good citizens and good neighbors. They become models for what employers and employees can achieve by working cooperatively with one another and with OSHA to achieve a level of worker protection that goes beyond compliance with government regulations.  VPP participants mentor other businesses, promote safety and health within their communities, and assist OSHA in important ways. For example, qualified volunteers from VPP sites worked alongside OSHA specialists in the effort to protect the recovery workers at the World Trade Center site.  Others, after training and designation as Special Government Employee Special Government Employees" s, join OSHA teams to perform onsite safety and health assessments of companies wishing to join VPP and current participants seeking re-approval. The owners of VPP sites generously bear the costs of such service; there is no cost to OSHA.

OSHA is pleased to work with and recognize the men and women of [SITE NAME] for their commitment to workplace safety, and I appreciate the opportunity to let you know of your constituents' achievements in this area.

For your information, my letter reapproving the site to VPP has gone to [NAME, TITLE, SITE NAME, AND ADDRESS FROM ASS'T SECY'S APPROVAL LETTER].

Sincerely,



[Name]

Assistant Secretary

 

 

 

 

Sample Press Release


Region [ ] News Release: [release #]DateContact:Phone:
[SITE NAME] [APPROVED or REAPPROVED] FOR PARTICIPATION IN OSHA'S VOLUNTARY PROTECTION PROGRAMS


[City, State]- A ceremony commemorating the [approval or reapproval] of [site name, location], in the Occupational Safety and Health Administration's (OSHA) [Star, Merit, or Demonstration] Voluntary Protection Program (VPP) will be held [date] at the plant to recognize the company for its [#-year] continued excellence in worker safety and health.

In evaluating the company's safety and health management system, the OSHA review team found excellence in safety and health management, employee training and involvement, and the application of appropriate resources into these areas," Regional Administrator [name] said. "We were impressed with the participation of top level management in [site's] systems for protecting employees and believe that management leadership and involvement is the key to [site's] success.br>
[Site] employs approximately [#] workers in the manufacture of [insert what the company manufactures]. The facility was first approved for the [Star, Merit, or Demonstration] Program on [date]. In addition to an emplary safety and health management system, the facility has an injury and illness recordable incidence case rate approximately [XX%] below the national average for its industry.

The VPP is designed to recognize and promote effective workplace safety and health management. In the VPP, management, labor and OSHA establish a cooperative relationship at a worksite that has implemented a strong safety and health management system. Star participants, who meet all VPP requirements, are at the top of the VPP recognition ladder.

Participants in VPP have shown that an investment in the OSHA program is an effective allocation of resources. VPP sites experience fewer employee injuries and illnesses, reduced workers' compensation costs, improved productivity, improved employee morale, and recognition in the community. In addition, sites' safety and health management systems are further improved over time through the internal and external reviews that are part of VPP's ongoing participation requirements.

OSHA will not target a VPP-approved worksite for any regularly scheduled programmed inspections, although a VPP site of course must continue to comply with all OSHA safety and health regulations. OSHA retains the responsibility for investigating worker complaints and serious accidents.

There are approximately # worksites nationwide in the VPP.

 

 

 

 

# # #


The text of this news release is on the Internet World Wide Web at www.osha.gov.

Editor's Note: Information kits about the VPP application and approval process are available from the VPP Manager at OSHA's [City, State] Regional Office, telephone [phone #]. Another source of information about VPP is the Voluntary Protection Programs Participants' Association (VPPPA), Falls Church, VA, a group of VPP membersdedicated to the exchange of safety and health information. The Association's phone number is 703-761-1146.

This information will be made available to sensory impaired individuals upon request. Voice phone: 816-426-5481, ADD* Message Referral Phone No. 1-800-347-8032. *Telecommunications Device for the Deaf

 

 

 

 


1-year conditional

2-Year Rate Reduction Plan

90-Day Items, 90-day item, 90-day items

Appeal

Ceremonies

Collective bargaining

Confidentiality

Construction

Contract employees

DART rate

Deferral

Eligibility

Employee involvement

Engineering controls

Fatality

Federal agencies

Hazard prevention and control

History

Interviews

Location

Management leadership

Merit Goal

Onsite evaluation

OSHA 300 log

Rate

Reinstatement

Resources

Sampling

Scheduling

Special Government Employees

State plan

TCIR

Temporary employees

Termination

Training

Union

VADS

Walkthrough

Withdrawal

Worksite analysis