- Part Number:1926
- Part Number Title:Safety and Health Regulations for Construction
- Subpart:1926 Subpart CC
- Subpart Title:Cranes and Derricks in Construction
- Standard Number:
- Title:Inspections.
- GPO Source:
Modified equipment.
Repaired/adjusted equipment.
Post-assembly.
Each shift.
If any deficiency in paragraph (d)(1)(xiv) of this section (safety devices/operational aids) is identified, the action specified in §§ 1926.1415 and 1926.1416 must be taken prior to using the equipment.
Monthly.
Annual/comprehensive.
Severe service. Where the severity of use/conditions is such that there is a reasonable probability of damage or excessive wear (such as loading that may have exceeded rated capacity, shock loading that may have exceeded rated capacity, prolonged exposure to a corrosive atmosphere), the employer must stop using the equipment and a qualified person must:
Equipment not in regular use. Equipment that has been idle for 3 months or more must be inspected by a qualified person in accordance with the requirements of paragraph (e) (Monthly) of this section before initial use.
[Reserved]