- Part Number:1910
- Part Number Title:Occupational Safety and Health Standards
- Subpart:1910 Subpart N
- Subpart Title:Materials Handling and Storage
- Standard Number:
- Title:Derricks.
- GPO Source:
A derrick is an apparatus consisting of a mast or equivalent member held at the head by guys or braces, with or without a boom, for use with a hoisting mechanism and operating ropes.
A-frame derrick means a derrick in which the boom is hinged from a cross member between the bottom ends of two upright members spread apart at the lower ends and joined at the top; the boom point secured to the junction of the side members, and the side members are braced or guyed from this junction point.
A basket derrick is a derrick without a boom, similar to a gin pole, with its base supported by ropes attached to corner posts or other parts of the structure. The base is at a lower elevation than its supports. The location of the base of a basket derrick can be changed by varying the length of the rope supports. The top of the pole is secured with multiple reeved guys to position the top of the pole to the desired location by varying the length of the upper guy lines. The load is raised and lowered by ropes through a sheave or block secured to the top of the pole.
Breast derrick means a derrick without boom. The mast consists of two side members spread farther apart at the base than at the top and tied together at top and bottom by rigid members. The mast is prevented from tipping forward by guys connected to its top. The load is raised and lowered by ropes through a sheave or block secured to the top crosspiece.
Chicago boom derrick means a boom which is attached to a structure, an outside upright member of the structure serving as the mast, and the boom being stepped in a fixed socket clamped to the upright. The derrick is complete with load, boom, and boom point swing line falls.
A gin pole derrick is a derrick without a boom. Its guys are so arranged from its top as to permit leaning the mast in any direction. The load is raised and lowered by ropes reeved through sheaves or blocks at the top of the mast.
Guy derrick means a fixed derrick consisting of a mast capable of being rotated, supported in a vertical position by guys, and a boom whose bottom end is hinged or pivoted to move in a vertical plane with a reeved rope between the head of the mast and the boom point for raising and lowering the boom, and a reeved rope from the boom point for raising and lowering the load.
Shearleg derrick means a derrick without a boom and similar to a breast derrick. The mast, wide at the bottom and narrow at the top, is hinged at the bottom and has its top secured by a multiple reeved guy to permit handling loads at various radii by means of load tackle suspended from the mast top.
A stiffleg derrick is a derrick similar to a guy derrick except that the mast is supported or held in place by two or more stiff members, called stifflegs, which are capable of resisting either tensile or compressive forces. Sills are generally provided to connect the lower ends of the stifflegs to the foot of the mast.
Appointed means assigned specific responsibilities by the employer or the employer's representative.
ANSI means the American National Standards Institute.
Boom harness means the block and sheave arrangement on the boom point to which the topping lift cable is reeved for lowering and raising the boom.
The boom point is the outward end of the top section of the boom.
Derrick bullwheel means a horizontal ring or wheel, fastened to the foot of a derrick, for the purpose of turning the derrick by means of ropes leading from this wheel to a powered drum.
Designated means selected or assigned by the employer or employer's representative as being qualified to perform specific duties.
Eye means a loop formed at the end of a rope by securing the dead end to the live end at the base of the loop.
A fiddle block is a block consisting of two sheaves in the same plane held in place by the same cheek plates.
The foot bearing or foot block (sill block) is the lower support on which the mast rotates.
A gudgeon pin is a pin connecting the mast cap to the mast allowing rotation of the mast.
A guy is a rope used to steady or secure the mast or other member in the desired position.
Load, working means the external load, in pounds, applied to the derrick, including the weight of load attaching equipment such as load blocks, shackles, and slings.
Load block, lower means the assembly of sheaves, pins, and frame suspended by the hoisting rope.
Load block, upper means the assembly of sheaves, pins, and frame suspended from the boom.
Mast means the upright member of the derrick.
Mast cap (spider) means the fitting at the top of the mast to which the guys are connected.
Reeving means a rope system in which the rope travels around drums and sheaves.
Rope refers to wire rope unless otherwise specified.
Safety Hook means a hook with a latch to prevent slings or load from accidentally slipping off the hook.
Side loading is a load applied at an angle to the vertical plane of the boom.
The sill is a member connecting the foot block and stiffleg or a member connecting the lower ends of a double member mast.
A standby derrick is a derrick not in regular service which is used occasionally or intermittently as required.
Stiffleg means a rigid member supporting the mast at the head.
Swing means rotation of the mast and/or boom for movements of loads in a horizontal direction about the axis of rotation.
General requirements -
Application. This section applies to guy, stiffleg, basket, breast, gin pole, Chicago boom and A-frame derricks of the stationary type, capable of handling loads at variable reaches and powered by hoists through systems of rope reeving, used to perform lifting hook work, single or multiple line bucket work, grab, grapple, and magnet work. Derricks may be permanently installed for temporary use as in construction work. The requirements of this section also apply to any modification of these types which retain their fundamental features, except for floating derricks.
New and existing equipment. All new derricks constructed and installed on or after August 31, 1971, shall meet the design specifications of the American National Standard Safety Code for Derricks, ANSI B30.6-1969, which is incorporated by reference as specified in § 1910.6.
Designated personnel. Only designated personnel shall be permitted to operate a derrick covered by this section.
Load ratings -
Rated load marking. For permanently installed derricks with fixed lengths of boom, guy, and mast, a substantial, durable, and clearly legible rating chart shall be provided with each derrick and securely affixed where it is visible to personnel responsible for the safe operation of the equipment. The chart shall include the following data:
Nonpermanent installations. For nonpermanent installations, the manufacturer shall provide sufficient information from which capacity charts can be prepared for the particular installation. The capacity charts shall be located at the derricks or the jobsite office.
Inspection -
Inspection classification.
Periodic inspection - 1- to 12-month intervals, or as specified by the manufacturer
Frequent inspection. Items such as the following shall be inspected for defects at intervals as defined in paragraph (d)(1)(ii)(a) of this section or as specifically indicated, including observation during operation for any defects which might appear between regular inspections. Deficiencies shall be carefully examined for any safety hazard:
Derrick hooks for deformations or cracks; for hooks with cracks or having more than 15 percent in excess of normal throat opening or more than 10° twist from the plane of the unbent hook, refer to paragraph (e)(3)(iii) of this section.
Periodic inspection.
Parts such as pins, bearings, shafts, gears, sheaves, drums, rollers, locking and clamping devices, for wear, cracks, and distortion.
Derricks not in regular use.
A derrick which has been idle for a period of over 6 months shall be given a complete inspection conforming with requirements of paragraphs (d) (2) and (3) of this section and paragraph (g)(3) of this section before placing in service.
Testing -
Operational tests. Prior to initial use all new and altered derricks shall be tested to insure compliance with this section including the following functions:
Anchorages. All anchorages shall be approved by the appointed person. Rock and hairpin anchorages may require special testing.
Maintenance -
Preventive maintenance. A preventive maintenance program based on the derrick manufacturer's recommendations shall be established.
Maintenance procedure.
Adjustments and repairs.
Rope inspection -
Running ropes. A thorough inspection of all ropes in use shall be made at least once a month and a certification record which includes the date of inspection, the signature of the person who performed the inspection, and an identifier for the ropes which were inspected shall be prepared and kept on file where readily available. Any deterioration, resulting in appreciable loss of original strength shall be carefully observed and determination made as to whether further use of the rope would constitute a safety hazard. Some of the conditions that could result in an appreciable loss of strength are the following:
Limited travel ropes. Heavy wear and/or broken wires may occur in sections in contact with equalizer sheaves or other sheaves where rope travel is limited, or with saddles. Particular care shall be taken to inspect ropes at these locations.
Idle ropes. All rope which has been idle for a period of a month or more due to shutdown or storage of a derrick on which it is installed shall be given a thorough inspection before it is used. This inspection shall be for all types of deterioration. A certification record shall be prepared and kept readily available which includes the date of inspection, the signature of the person who performed the inspection, and an identifier for the ropes which were inspected.
Nonrotating ropes. Particular care shall be taken in the inspection of nonrotating rope.
Operations of derricks. Derrick operations shall be directed only by the individual specifically designated for that purpose.
Handling the load -
Size of load.
Attaching the load.
Moving the load.
Holding the load.
Use of winch heads.
Securing boom. Dogs, pawls, or other positive holding mechanism on the hoist shall be engaged. When not in use, the derrick boom shall:
Other requirements -
Guards.
Hooks.
Fire extinguishers.
Refueling.
Refueling with portable containers shall be done with approved safety type containers equipped with automatic closing cap and flame arrester. Refer to § 1910.155(c)(3) for definition of Approved.
Operations near overhead lines. For operations near overhead electric lines, see § 1910.333(c)(3).
Cab or operating enclosure.
[37 FR 22102, Oct. 18, 1972, as amended at 38 FR 14373, June 1, 1973; 43 FR 49750, Oct. 24, 1978; 49 FR 5323, Feb. 10, 1984; 51 FR 34561, Sept. 29, 1986; 53 FR 12122, Apr. 12, 1988; 55 FR 32015, Aug. 6, 1990; 61 FR 9227, March 7, 1996]