1
05/03/2021 - 1910.269(m)(3)(viii) - Minimum approach distance (MAD) requirements covered under 1910.269 when installing protective grounding equipment
2
01/31/2020 - 1910.269(m)(3)(ii) - Tagging transmission lines covered under, 1910.269(m)(3)(ii)
3
01/31/2020 - 1910.269(m)(3) - Tagging transmission lines covered under, 1910.269(m)(3)(ii)
4
01/31/2020
- 1910.269(m), 1910.269(m)(3), 1910.269(m)(3)(ii) -
Tagging transmission lines covered under, 1910.269(m)(3)(ii)
5
10/02/2015 - 1910.269(m)(3) - Minimum approach distances to electric power transmission and distribution lines during the installation of protective grounds
6
10/02/2015
- 1910.269(m), 1910.269(m)(3) -
Minimum approach distances to electric power transmission and distribution lines during the installation of protective grounds
7
10/19/2006 - 1910.269(m)(1) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part.
8
10/19/2006
- 1910.269(m), 1910.269(m)(1) -
Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part.
9
03/07/2005 - 1910.269(m)(3)(ii) - Network protectors must have the manual override position blocked, locked, or otherwise disabled; must need use of a tool to manually place in closed position.
10
06/09/2000 - 1910.269(m)(3)(viii) - Clarification of single and multiple crews for purposes of deenergizing lines.
11
03/22/2000
- 1910.269(m) -
Lockout/tagout: preferred means of energy isolation; non cord-and-plug powered equipment.
12
12/06/1999
- 1910.269(m) -
1910.269: Application of personal protective grounds for employee protection
13
06/22/1998 - 1910.269(m)(3)(viii) - Stress cone work: worker protection and job briefings
14
06/22/1998 - 1910.269(m)(3)(ix) - Stress cone work: worker protection and job briefings
15
06/22/1998
- 1910.269(m), 1910.269(m)(3)(ix), 1910.269(m)(3)(viii) -
Stress cone work: worker protection and job briefings