# Standard Interpretations
1 - 1910.269(m)(3)(viii) - Minimum approach distance (MAD) requirements covered under 1910.269 when installing protective grounding equipment
2 - 1910.269(m)(3)(ii) - Tagging transmission lines covered under, 1910.269(m)(3)(ii)
3 - 1910.269(m)(3) - Tagging transmission lines covered under, 1910.269(m)(3)(ii)
4 - 1910.269(m), 1910.269(m)(3), 1910.269(m)(3)(ii) - Tagging transmission lines covered under, 1910.269(m)(3)(ii)
5 - 1910.269(m)(3) - Minimum approach distances to electric power transmission and distribution lines during the installation of protective grounds
6 - 1910.269(m), 1910.269(m)(3) - Minimum approach distances to electric power transmission and distribution lines during the installation of protective grounds
7 - 1910.269(m)(1) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part.
8 - 1910.269(m), 1910.269(m)(1) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part.
9 - 1910.269(m)(3)(ii) - Network protectors must have the manual override position blocked, locked, or otherwise disabled; must need use of a tool to manually place in closed position.
10 - 1910.269(m)(3)(viii) - Clarification of single and multiple crews for purposes of deenergizing lines.
11 - 1910.269(m) - Lockout/tagout: preferred means of energy isolation; non cord-and-plug powered equipment.
12 - 1910.269(m) - 1910.269: Application of personal protective grounds for employee protection
13 - 1910.269(m)(3)(viii) - Stress cone work: worker protection and job briefings
14 - 1910.269(m)(3)(ix) - Stress cone work: worker protection and job briefings
15 - 1910.269(m), 1910.269(m)(3)(ix), 1910.269(m)(3)(viii) - Stress cone work: worker protection and job briefings