1
08/05/2015 - 1910.333(c) - Lockout/tagout of electrical hazards by workers who install, maintain, repair or replace premises wiring systems.
2
08/05/2015 - 1910.333(b) - Lockout/tagout of electrical hazards by workers who install, maintain, repair or replace premises wiring systems.
3
08/05/2015 - 1910.333(b) - Lockout of tagout requirements for electrical hazards
4
01/29/2007
- 1910.333 -
Detachable vs. permanent side shields for safety glasses; modifications to safety glasses.
5
12/19/2006 - 1910.333(a)(1) - "Continuous industrial processes" and the infeasibility of de-energizing equipment under 29 CFR 1910.333.
6
12/19/2006
- 1910.333, 1910.333(a)(1) -
"Continuous industrial processes" and the infeasibility of de-energizing equipment under 29 CFR 1910.333.
7
11/14/2006 - 1910.333(b)(2) - OSHA requirements for warning signs and protection from electric-arc-flash hazards and compliance with NFPA 70E-2004.
8
11/14/2006 - 1910.333(a)(1) - OSHA requirements for warning signs and protection from electric-arc-flash hazards and compliance with NFPA 70E-2004.
9
11/14/2006
- 1910.333, 1910.333(a)(1), 1910.333(b)(2) -
OSHA requirements for warning signs and protection from electric-arc-flash hazards and compliance with NFPA 70E-2004.
10
07/28/2006 - 1910.333(c)(2) - Clarification about 29 CFR 1910.333 and 29 CFR 1910.147 as they relate to work inside an electrical panel and on related equipment.
11
07/28/2006 - 1910.333(b)(2)(iii)(E) - Clarification about 29 CFR 1910.333 and 29 CFR 1910.147 as they relate to work inside an electrical panel and on related equipment.
12
07/28/2006 - 1910.333(b)(2) - Clarification about 29 CFR 1910.333 and 29 CFR 1910.147 as they relate to work inside an electrical panel and on related equipment.
13
07/28/2006 - 1910.333(b) - Clarification about 29 CFR 1910.333 and 29 CFR 1910.147 as they relate to work inside an electrical panel and on related equipment.
14
07/28/2006 - 1910.333(a)(2) - Clarification about 29 CFR 1910.333 and 29 CFR 1910.147 as they relate to work inside an electrical panel and on related equipment.
15
07/28/2006 - 1910.333(a)(1) - Clarification about 29 CFR 1910.333 and 29 CFR 1910.147 as they relate to work inside an electrical panel and on related equipment.
16
07/28/2006
- 1910.333, 1910.333(a)(1), 1910.333(a)(2), 1910.333(b), 1910.333(b)(2), 1910.333(b)(2)(iii)(E), 1910.333(c)(2) -
Clarification about 29 CFR 1910.333 and 29 CFR 1910.147 as they relate to work inside an electrical panel and on related equipment.
17
10/27/2005 - 1910.333(b)(2) - Acceptability of using a light switch as a disconnecting means for the electrical lockout/tagout standard.
18
10/27/2005 - 1910.333(b)(1) - Acceptability of using a light switch as a disconnecting means for the electrical lockout/tagout standard.
19
10/27/2005 - 1910.333(a)(2) - Acceptability of using a light switch as a disconnecting means for the electrical lockout/tagout standard.
20
09/26/2002
- 1910.333 -
Use of ANSI C2-1997 as guidance for protecting employees working near insulated shielded conductors
21
07/08/2002
- 1910.333 -
Use of verification tags for lockout.
22
11/19/2001 - 1910.333(c)(2) - Qualifications for resetting circuits or replacing fuses; electrical enclosures must be approved.
23
11/16/2000 - 1910.333(b) - Applicability of OSHA's LOTO standards; isolation and verification procedures.
24
07/10/2000 - 1910.333(b)(2)(v)(C) - Evaluation of proposed modifications to the Bureau of Prisons' Lockout/Tagout (LOTO) procedures.
25
07/10/2000 - 1910.333(b)(2) - Evaluation of proposed modifications to the Bureau of Prisons' Lockout/Tagout (LOTO) procedures.
26
07/10/2000 - 1910.333(a)(1) - Evaluation of proposed modifications to the Bureau of Prisons' Lockout/Tagout (LOTO) procedures.
27
07/10/2000
- 1910.333, 1910.333(a)(1), 1910.333(b)(2), 1910.333(b)(2)(v)(C) -
Evaluation of proposed modifications to the Bureau of Prisons' Lockout/Tagout (LOTO) procedures.
28
03/22/2000 - 1910.333(b) - Lockout/tagout: preferred means of energy isolation; non cord-and-plug powered equipment.
29
12/07/1999
- 1910.333 -
Protection of workers operating mechanical equipment near overhead power lines
30
11/16/1999 - 1910.333(b)(2)(iv)(B) - Verification procedures for group lockout/tagout.
31
05/20/1999
- 1910.333 -
Shutdown and restoration of power to equipment for a phase-to-ground condition.
32
06/22/1998 - 1910.333(a)(1) - Training and PPE for employees performing tests on equipment.
33
05/20/1996
- 1910.333 -
Letter requesting interpretation of the OSHA electrical standards as they apply to employees using insulated hand tools
34
02/26/1996
- 1910.333 -
Minimum approach distances
35
02/07/1996 - 1910.333(a)(1) - Safety electrical work practices; motor disconnects;work clearances.
36
08/12/1994 - 1910.333(b)(2) - Lockout/tagout procedures, including work permits and groups of machines/equipment.
37
12/30/1993
- 1910.333 -
Eyeglasses with exposed metal parts.
38
09/09/1993 - 1910.333(c)(2) - Qualified employee requirements for the servicing and maintenance of electrical equipment.
39
09/09/1993 - 1910.333(b) - Qualified employee requirements for the servicing and maintenance of electrical equipment.
40
09/09/1993
- 1910.333 -
Applicablility of the lockout/tagout standards.
41
03/17/1993
- 1910.333 -
Rulings or requirements for employees in the electrical trade to wear steel-toe shoes.
42
11/19/1992
- 1910.333 -
Review of Panduit's lockout/tagout training video.
43
09/11/1992
- 1910.333 -
Nonconductive siderails for portable ladders for private or contractual fire departments.
44
04/28/1992
- 1910.333 -
Minimally acceptable levels of illumination; Resistor banks on overhead cranes; Overhead lines; Protective gloves on energized equipment.
45
01/29/1991 - 1910.333(b)(2) - Control of Hazardous Energy Sources (Group Lockout/Tagout).
46
09/07/1990
- 1910.333 -
Applicability of the new Electrical Safety final rule, Subpart S, to the construction industry