# Standard Interpretations
1 - 1926.757(a)(8), 1926.757(a)(8)(i), 1926.757(a)(8)(ii) - Permissibility of the welding of joists over 40-feet in length, while the hoisting line is kept in place, instead of field bolting.
2 - 1926.757(a)(8), 1926.757(a)(8)(i), 1926.757(a)(8)(ii) - Field bolting and welding requirements for steel joist assembly
3 - 1926.757(a)(8), 1926.757(a)(8)(i), 1926.757(a)(8)(ii) - Clarification of steel erection joist field-bolting requirements in 29 CFR Part 1926 Subpart R.
# Regulations
1 - - Open web steel joists.