# Standard Interpretations
1 - 1926.800(t)(1)(vii) - Regarding the type of hook that is permitted when a crane is used to hoist personnel during underground construction work
2 - 1926.800(a)(1) - Applicablity of Subpart S to tunnels contructed by auger boring.
3 - 1926.800, 1926.800(a)(1) - Applicablity of Subpart S to tunnels contructed by auger boring.
4 - 1926.800(s)(3) - Oil-filled transformers and underground construction.
5 - 1926.800(r)(13)(ii) - Typographical error in internet text of 1926.800(r)(13)(ii).
6 - 1926.800, 1926.800(r)(13)(ii) - Typographical error in internet text of 1926.800(r)(13)(ii).
7 - 1926.800(d) - Request for an interpretation regarding the applicability of 1926.800 to the Fort Point Channel Crossing Immersed Tube. Tunnel.
8 - 1926.800(k)(4) - Request for an interpretation regarding the applicability of 1926.800 to the Fort Point Channel Crossing Immersed Tube. Tunnel.
9 - 1926.800(a)(1) - Request for an interpretation regarding the applicability of 1926.800 to the Fort Point Channel Crossing Immersed Tube. Tunnel.
10 - 1926.800, 1926.800(a)(1), 1926.800(k)(4), 1926.800(d) - Request for an interpretation regarding the applicability of 1926.800 to the Fort Point Channel Crossing Immersed Tube. Tunnel.
11 - 1926.800 - Construction standards for equipment such as Shuttle Buggy.
12 - 1926.800(f)(1) - Application of 1926.800 to lone employees working underground in a tunnel or shaft connected to a tunnel.
13 - 1926.800(e) - Application of 1926.800 to lone employees working underground in a tunnel or shaft connected to a tunnel.
14 - 1926.800(g)(2) - Application of 1926.800 to lone employees working underground in a tunnel or shaft connected to a tunnel.
15 - 1926.800(a) - Application of 1926.800 to lone employees working underground in a tunnel or shaft connected to a tunnel.
16 - 1926.800(f)(5) - Application of 1926.800 to lone employees working underground in a tunnel or shaft connected to a tunnel.
17 - 1926.800(c) - Application of 1926.800 to lone employees working underground in a tunnel or shaft connected to a tunnel.
18 - 1926.800, 1926.800(c), 1926.800(f)(5), 1926.800(a), 1926.800(g)(2), 1926.800(e), 1926.800(f)(1) - Application of 1926.800 to lone employees working underground in a tunnel or shaft connected to a tunnel.
19 - 1926.800 - Application of the Confined Spaces Advisor to construction; personal fall arrest system requirements.
20 - 1926.800(l)(2) - Tunnel illumination requirements.
21 - 1926.800(g)(4) - Tunnel illumination requirements.
22 - 1926.800 - Numerous clarifications regarding underground construction;variances; joint ventures.
23 - 1926.800(m)(5) - Use of gasoline in underground construction.
24 - 1926.800 - Fire prevention and protection requirements applicable to underground construction.
25 - 1926.800 - Wedge Sockets Wire Rope Clips (Piggy-Back Clip).
26 - 1926.800 - Wire rope clips in conjunction with wedge sockets.
27 - 1926.800(s) - Tunnel boring machine equipment.
28 - 1926.800 - Definition of Potentially Gassy Atmosphere.
29 - 1926.800 - Cage, skip and load connections to hoist ropes.
30 - 1926.800 - Use of liquefied petroleum gas (LPG) underground.
31 - 1926.800 - Transportation of compressed gas chambers
32 - 1926.800(s)(1) - Protection of flexible cords when hung in tunnel shafts.
33 - 1926.800(h) - Clarification of approval requirements for equipment to classify underground construction operations as potentially gassy
34 - 1926.800(g)(5) - A rescue team is required during all phases of underground construction operations in a tunnel.
35 - 1926.800 - Rehabilitation of a sewer tunnel constructed in the years between 1926 and 1932
36 - 1926.800 - Cut and cover construction.
37 - 1926.800(h)(2)(iii) - Interpretation on testing requirements for grouted tunnel rock bolts
38 - 1926.800 - Safety aspects of personnel and material hoists.
39 - 1926.800(k)(10)(i) - Cut-and-cover operation in the construction of tunnels.
40 - 1926.800(c) - Positive identification of persons working underground in tunnels and shafts, caissons, cofferdams, compressed air tunnels.
41 - 1926.800 - Cut-and-cover operation regulations of Excavation, Trenching, and Shoring.
42 - 1926.800(c) - Use of Mapp gas, oxygen, and acetylene in a tunnel.
43 - 1926.800 - Methylacetylene-propadiene, stabilized, by definition, is not a liquefied petroleum gas, but is considered as a fuel gas
44 - 1926.800 - The handling, Storing and Use of MAPP Gas in Underground Construction Work.
45 - 1926.800(k)(2) - Supplied air and ventilating air requirements.
46 - 1926.800 - Clarification of 29 CFR 1926.350(b)(4) to Permit Cylinders Containing Oxygen, Acetylene or Other Fuel Gas to be Taken into Tunnels
47 - 1926.800 - Cut and cover tunneling operations.