Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1048428.015
Citation: 01001
Citation Type: Serious
Abatement Date: 10/02/2015 2
Initial Penalty: $3,850.00
Current Penalty: $1,578.50
Issuance Date: 08/17/2015
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC):
Gravity: 5
Report ID: 0729300
Contest Date:
Final Order: 09/14/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/14/2015 | $1,578.50 | 10/02/2015 | Serious | |
Penalty | Z: Issued | 08/17/2015 | $3,850.00 | 10/02/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: a/ The energy control procedure(s) for machinery such as but not limited to the Wysong Shear, m/n 1025, s/n P37-647, were not inspected throughout 2014. This shear utilizes 480 volts, 80 p.s.i. pneumatic, and gravity to operate.