Violation Detail
Standard Cited: 19150081 B02 Housekeeping.
Inspection Nr: 1070225.015
Citation: 01001
Citation Type: Serious
Abatement Date: 10/20/2015 2
Initial Penalty: $5,000.00
Current Penalty: $5,000.00
Issuance Date: 09/28/2015
Nr Instances: 1
Nr Exposed: 12
Related Event Code (REC):
Gravity: 5
Report ID: 0316300
Contest Date:
Final Order: 10/26/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 09/28/2015 | $5,000.00 | 10/20/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1915.81(b)(2): While a walkway or part of a walkway is being used as a working surface, the employer shall cordon off that portion to prevent it from being used as a walkway. 750 W. Berkley Ave., Norfolk, VA 23523, Pier 1: On or about May 22, 2015, and times prior thereto, the employer placed Port-O-Johns on pier 1 for employee use. The walkway directly adjacent to and in front of the Port-O-Johns was not cordoned off, employees and other workers exiting the Port-O-Johns were exposed to struck-by injuries. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.