Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1273940.015
Citation: 01001
Citation Type: Serious
Abatement Date: 04/13/2018
Initial Penalty: $12,934.00
Current Penalty: $0.00
Issuance Date: 04/03/2018
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 10
Report ID: 0418300
Contest Date: 04/19/2018
Final Order: 03/11/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 03/11/2019 | $0.00 | 04/13/2018 | Serious | |
Penalty | C: Contested | 04/25/2018 | $12,934.00 | 04/13/2018 | Serious | |
Penalty | Z: Issued | 04/03/2018 | $12,934.00 | 04/13/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) On or about October 29, 2017 - Rehang Area, a procedure was not developed, documented, and utilized to control potentially hazardous energy when employees were sanitizing or performing service and maintenance activities on the Meyn Automatic Rehanger Machines between the Kill Line and Evisceration lines 1 and 2 exposing employees to caught-in hazards.