Violation Detail
Standard Cited: 19260451 E09 I General requirements.
Inspection Nr: 1340176.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $6,630.00
Current Penalty: $2,000.00
Issuance Date: 02/15/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0215800
Contest Date: 03/11/2019
Final Order: 09/04/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 09/04/2020 | $2,000.00 | Serious | ||
Penalty | C: Contested | 03/11/2019 | $6,630.00 | Serious | ||
Penalty | Z: Issued | 02/15/2019 | $6,630.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(e)(9)(i): The employer did not provide safe means of access for each employee erecting or dismantling a scaffold. a) 115 Seneca St, Ithaca, NY (Hilton Canopy Project) On or about 8/17/18: Employees were not provided proper access to the working level of the scaffold that was being erected.