Violation Detail
Standard Cited: 19260451 H02 I General requirements.
Inspection Nr: 1342178.015
Citation: 01001
Citation Type: Other
Abatement Date: 3
Initial Penalty: $6,630.00
Current Penalty: $4,000.00
Issuance Date: 02/15/2019
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0215800
Contest Date:
Final Order: 03/15/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/15/2019 | $4,000.00 | Other | ||
Penalty | Z: Issued | 02/15/2019 | $6,630.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(h)(2)(i): The area below the scaffold was not barricaded, and employees were not prohibited from entering the hazard area. a) 115 Seneca St, Ithaca, NY, Hilton Canopy Project: On or about 8/20/18: Employees installing windows were not prohibited or protected by barricades while erectors were installing scaffolding directly above them.