Violation Detail
Standard Cited: 19100304 G03 I Wiring design and protection.
Inspection Nr: 1343905.015
Citation: 01001
Citation Type: Other
Abatement Date: 01/28/2019 2
Initial Penalty: $6,467.00
Current Penalty: $6,467.00
Issuance Date: 01/15/2019
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity:
Report ID: 0316400
Contest Date:
Final Order: 02/25/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/25/2019 | $6,467.00 | 01/28/2019 | Other | |
Penalty | Z: Issued | 01/15/2019 | $6,467.00 | 01/28/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.304(g)(3)(i): The frame of the generator was not grounded and the generator supplied power to equipment that was not mounted or connected by cord and plug. a) MQ Power 70 Portable Generator: On or about August 30, 2018 and time prior employees used a 480V 3-phased portable generator to provide power to a water pump. The pump was connected to a pump switch box that was hard wired to the output terminals of the generator and the generator was not grounded to earth.