Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1374596.015
Citation: 01001
Citation Type: Serious
Abatement Date: 05/20/2020 7
Initial Penalty: $13,260.00
Current Penalty: $12,597.00
Issuance Date: 04/11/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0524200
Contest Date: 05/10/2019
Final Order: 04/20/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/20/2020 | $12,597.00 | 05/20/2020 | Serious | |
Penalty | C: Contested | 05/15/2019 | $13,260.00 | 05/07/2019 | Serious | |
Penalty | Z: Issued | 04/11/2019 | $13,260.00 | 05/07/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft: a) 970 Milwaukee Ave.- On or about January 26, 2019, the employer failed to provide a guard over the rotating shaft that projected more than one half the diameter of the shaft protruding from the salt spreader on Truck #434. The shaft extended three inches and was not smooth. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.