Violation Detail
Standard Cited: 19260856 B Removal of walls, floors, and material with equipment.
Inspection Nr: 1382558.015
Citation: 01001
Citation Type: Serious
Abatement Date: 07/31/2019 2
Initial Penalty: $3,978.00
Current Penalty: $1,800.00
Issuance Date: 07/25/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0523400
Contest Date:
Final Order: 08/15/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/15/2019 | $1,800.00 | 07/31/2019 | Serious | |
Penalty | Z: Issued | 07/25/2019 | $3,978.00 | 07/31/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.856(b): During demolition operation(s), floor openings did not have curbs or stop-logs to prevent the mechanical equipment from running over the edge: (a) On or about March 4, 2019, the employer did not ensure employees were using a curb, stop-log, or other equivalent means to prevent mechanical equipment used for demolition operations from going over the edge.