Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1442015.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $6,747.00
Current Penalty: $6,747.00
Issuance Date: 04/28/2020
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0215000
Contest Date: 12/02/2021
Final Order: 07/24/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 07/24/2023 | $6,747.00 | Serious | ||
Penalty | C: Contested | 12/22/2021 | $6,747.00 | Serious | ||
Penalty | Z: Issued | 04/28/2020 | $6,747.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) Location: Scaffold front of building a) On or about 11/1/2019, employees worked on a tubular welded frame scaffold and the working platforms were not fully planked. Employees performing framing work on the front of the building.