Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1506322.015
Citation: 01001
Citation Type: Other
Abatement Date: 07/14/2021 2
Initial Penalty: $13,653.00
Current Penalty: $12,000.00
Issuance Date: 06/07/2021
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0627500
Contest Date:
Final Order: 07/06/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/06/2021 | $12,000.00 | 07/14/2021 | Other | |
Penalty | Z: Issued | 06/07/2021 | $13,653.00 | 06/24/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy: Compressor Station: On or about December 11, 2020 prior to starting work on equipment, that had been locked out and tagged out, verification of isolation and deenergization was not accomplished. This condition exposed employees to a struck-by hazard.