Violation Detail
Standard Cited: 19100022 A02 General requirements.
Inspection Nr: 1525767.015
Citation: 01001
Citation Type: Serious
Abatement Date: 08/11/2021 2
Initial Penalty: $13,653.00
Current Penalty: $9,557.00
Issuance Date: 07/16/2021
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0522300
Contest Date:
Final Order: 08/12/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/12/2021 | $9,557.00 | 08/11/2021 | Serious | |
Penalty | Z: Issued | 07/16/2021 | $13,653.00 | 08/11/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.22(a)(2):The floor of each workroom is maintained in a clean and, to the extent feasible, in a dry condition. When wet processes are used, drainage must be maintained and, to the extent feasible, dry standing places, such as false floors, platforms, and mats must be provided. On or about April 12, 2021, the employer did not ensure the workroom floor area located across from the dust collector No. 1 and around a 30 amp, 480 volt receptacle was maintained in a dry condition while using an electrically powered mobile welder machine.