Violation Detail
Standard Cited: 19260451 C02 V General requirements.
Inspection Nr: 1540309.015
Citation: 01001
Citation Type: Serious
Abatement Date: 01/25/2022 5
Initial Penalty: $13,653.00
Current Penalty: $8,191.80
Issuance Date: 12/30/2021
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0419400
Contest Date:
Final Order: 01/26/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/26/2022 | $8,191.80 | 01/25/2022 | Serious | |
Penalty | Z: Issued | 12/30/2021 | $13,653.00 | 01/25/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(c)(2)(v): Fork-lifts shall not be used to support scaffold platforms unless the entire platform is attached to the fork and the fork-lift is not moved horizontally while the platform is occupied. (a) Third Floor Balcony - On or about July 2, 2021, employees unloading materials from a job-made box positioned on a forklift were exposed to fall hazards from the third floor level.