Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1592423.015
Citation: 01001
Citation Type: Serious
Abatement Date: 09/13/2022 2
Initial Penalty: $14,357.00
Current Penalty: $7,179.00
Issuance Date: 06/28/2022
Nr Instances: 2
Nr Exposed: 10
Related Event Code (REC): R
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 07/27/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/27/2022 | $7,179.00 | 09/13/2022 | Serious | |
Penalty | Z: Issued | 06/28/2022 | $14,357.00 | 07/08/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i):Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a. Peterson American Corp. - Holland, Ohio: On or about April 26, 2022, the employer did not develop, document, and utilize energy control procedures for Piston Pin machine #1. Employees that set-up and change tooling were exposed to injury in that energy control was not utilized for the servicing and maintenance tasks. b. Peterson American Corp. - Holland, Ohio: On or about April 28, 2022, the employer did not develop, document, and utilize energy control procedures for Piston Pin machine #3. Employees that set-up and change tooling were exposed to injury in that energy control was not utilized for the servicing and maintenance tasks. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.