Violation Detail
Standard Cited: 19260850 A Preparatory operations.
This violation item has been deleted.
Inspection Nr: 1616392.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $15,625.00
Current Penalty: $0.00
Issuance Date: 01/25/2023
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0317500
Contest Date: 02/10/2023
Final Order: 04/15/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/15/2024 | $0.00 | Serious | ||
Penalty | C: Contested | 02/13/2023 | $15,625.00 | Serious | ||
Penalty | Z: Issued | 01/25/2023 | $15,625.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.850(a): Evidence in writing was not available that an engineering survey performed by a competent person had been performed prior to permitting employee(s) to start demolition operations: (a) On or about July 30, 2022, the company did not have evidence in writing that an engineering survey had been performed before demolition operations began on the coal waste conveyor system exposing employees to struck-by hazards from a structural collapse.