Violation Detail
Standard Cited: 19260025 A Housekeeping.
Inspection Nr: 1724900.015
Citation: 01001
Citation Type: Serious
Abatement Date: 03/01/2024 5
Initial Penalty: $4,148.00
Current Penalty: $4,148.00
Issuance Date: 02/05/2024
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0626300
Contest Date:
Final Order: 02/28/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 02/05/2024 | $4,148.00 | 03/01/2024 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, form and scrap lumber with protruding nails, and all other debris, shall be kept cleared from work areas, passageways, and stairs, in and around buildings or other structures. On or about August 9, 2023, and times prior thereto employees were exposed to slip/trip/fall from lumber laying on the ground at the back (north) side of a single family residential home under construction.