Violation Detail
Standard Cited: 19100106 C04 Flammable liquids.
Inspection Nr: 315723312
Citation: 01001
Citation Type: Serious
Abatement Date: 06/04/2012 X
Initial Penalty: $7,000.00
Current Penalty: $3,500.00
Issuance Date: 05/01/2012
Nr Instances: 2
Nr Exposed: 40
Related Event Code (REC): R
Gravity: 10
Report ID: 0626700
Contest Date: 05/25/2012
Final Order: 02/15/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 02/15/2013 | $3,500.00 | 06/04/2012 | Serious | |
Penalty | Z: Issued | 05/01/2012 | $7,000.00 | 06/04/2012 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard: CHEMNEP
AVD:29 CFR 1910.106(c)(4) The employer failed to ensure Piping systems were substantially supported and protected against physical damage and excessive stresses arising from settlement, vibration, expansion, or contraction. a)This condition was most recently observed in the DHN Unit of the DuPont facility near the North Reactor where process pipe that carries flammable liquids was observed. The pipe was not properly supported and protected against physical damage and excessive stresses. b)This condition was most recently observed in the Aniline Unit of the DuPont facility where process pipe that carries flammable liquids was observed. The pipe was not properly supported and protected against physical damage and excessive stresses.