Violation Detail
Standard Cited: 19100103 B01 II B Hydrogen.
This violation item has been deleted.
Inspection Nr: 900009.015
Citation: 01001
Citation Type: Serious
Abatement Date: 11/06/2013
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 09/24/2013
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0418200
Contest Date: 11/04/2013
Final Order: 12/05/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/05/2014 | $0.00 | 11/06/2013 | Serious | |
Penalty | C: Contested | 12/30/2013 | $7,000.00 | 11/06/2013 | Serious | |
Penalty | Z: Issued | 09/24/2013 | $7,000.00 | 11/06/2013 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.103(b)(1)(ii)(b): Safety relief devices shall be arranged to discharge upward and unobstructed to the open air in such a manner as to prevent any impingement of escaping gas upon the container, adjacent structure or personnel. This requirement does not apply to DOT Specification containers having an internal volume of 2 cubic feet or less. a. Hydrogen header system located beneath unit 2 generator - The hydrogen relief piping was not arranged to discharge upward and unobstructed to the open air.