Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1249131.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 03/21/2018 2
Initial Penalty: $9,054.00
Current Penalty: $4,527.00
Issuance Date: 01/08/2018
Nr Instances: 1
Nr Exposed: 60
Related Event Code (REC):
Gravity: 10
Report ID: 0521400
Contest Date:
Final Order: 01/24/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | $4,527.00 | 03/21/2018 | Serious | ||
Penalty | P: Petition to Mod Abatement | $4,527.00 | 03/21/2018 | Serious | ||
Penalty | I: Informal Settlement | 01/24/2018 | $4,527.00 | 02/09/2018 | Serious | |
Penalty | Z: Issued | 01/08/2018 | $9,054.00 | 01/23/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section: On or about 24 July 2017, the employer did not ensure adequate documented energy control procedures were developed and utilized for employees assigned to perform servicing or maintenance on all company machines to include the Williams White Moline S2-500-60-48, Machine #125. Employees were exposed to unexpected start-up and release of stored energy (spinning flywheel) while performing servicing or maintenance when they did not use Lockout/Tagout on all sources of potential energy (kinetic/pneumatic). Employees were exposed to caught-in/crushing hazards. Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).