Violation Detail
Standard Cited: 19100333 B02 Selection and use of work practices
Inspection Nr: 1241786.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 01/18/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/20/2017
Nr Instances: 4
Nr Exposed: 5
Related Event Code (REC):
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 01/16/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 12/20/2017 | $0.00 | 01/18/2018 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.333(b)(2): While an employee was exposed to contact with parts of fixed electric equipment or circuits which were deenergized, the circuits energizing the parts were not locked out or tagged or both in accordance with the requirements of this paragraph (b) of 29 CFR 1910.333(b)(2): a) At the Northeast Area of the Bottling Plant, employees authorized to repair/maintain equipment such as but, not limited to the E-line conveyor were exposed to an electrical hazard, in that, there was no specific procedures for testing to determine if the orange wire by the E-line conveyor was energized/live, on or about 06/21/2017.