Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1760873.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 11/07/2024
Initial Penalty: $9,795.00
Current Penalty: $0.00
Issuance Date: 10/11/2024
Nr Instances: 2
Nr Exposed: 10
Related Event Code (REC): R
Gravity: 5
Report ID: 0522000
Contest Date:
Final Order: 11/05/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/05/2024 | $0.00 | 11/07/2024 | Serious | |
Penalty | Z: Issued | 10/11/2024 | $9,795.00 | 11/07/2024 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(d): Application of control. The established procedures for the application of energy control (the lockout or tagout procedures) shall cover the following elements and actions and shall be done in the following sequence: (d)(1) Preparation for shutdown. Before an authorized or affected employee turns off a machine or equipment, the authorized employee shall have knowledge of the type and magnitude of the energy, the hazards of the energy to be controlled, and the method or means to control the energy. (d)(2) Machine or equipment shutdown. The machine or equipment shall be turned off or shut down using the procedures established for the machine or equipment. An orderly shutdown must be utilized to avoid any additional or increased hazard(s) to employees as a result of the equipment stoppage. (d)(3) Machine or equipment isolation. All energy isolating devices that are needed to control the energy to the machine or equipment shall be physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s). (d)(4) Lockout or tagout device application. Lockout or tagout devices shall be affixed to each energy isolating device by authorized employees. (d)(5) Stored energy. Following the application of lockout or tagout devices to energy isolating devices, all potentially hazardous stored or residual energy shall be relieved, disconnected, restrained, and otherwise rendered safe. (d)(6) Verification of isolation. Prior to starting work on machines or equipment that have been locked out or tagged out, the authorized employee shall verify that isolation and deenergization of the machine or equipment have been accomplished. a) On or about July 3, 2024, Monti, Inc. did not ensure press operators followed elements d1-d6 prior to reaching into the point of operation for troubleshooting jams while being exposed to pinch points of the Minster 400 ton part revolution press. b) On and after July 9, 2024, Monti, Inc. did not ensure press operators followed elements d1-d6 prior to performing servicing and maintenance tasks to include but not limited to cleaning bolsters and performing die changes of the SEYI SAG-440, Stamtec GTX-300, and Stamtec G1-80 part revolution presses.