Violation Detail
Standard Cited: 19100111 B09 III Storage and handling of anhydrous ammonia.
Inspection Nr: 901718.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 11/07/2013 2
Initial Penalty: $3,500.00
Current Penalty: $0.00
Issuance Date: 10/09/2013
Nr Instances: 2
Nr Exposed: 13
Related Event Code (REC):
Gravity: 5
Report ID: 0636900
Contest Date: 11/05/2013
Final Order: 06/20/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/20/2014 | $0.00 | 11/07/2013 | Serious | |
Penalty | C: Contested | 11/08/2013 | $3,500.00 | 11/07/2013 | Serious | |
Penalty | Z: Issued | 10/09/2013 | $3,500.00 | 11/07/2013 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.111(b)(9)(iii): Safety relief devices used in systems covered by paragraphs (c), (f), (g), and (h) of this section were not constructed to discharge at not less than the rates required in paragraph (b)(9)(i) of this section before the pressure is in excess of 120 percent (not including the 10 percent tolerance referred to in paragraph (b)(9)(ii) of this section) of the maximum permitted start-to-discharge pressure setting of the device. On or about April 17, 2013 and at times prior thereto, the employer did not ensure the safety relief devices for the main storage/service tanks were rated at not less than the tanks minimum rate of discharge in cubic feet per minute. a) On the north main stationary storage/service tank b) On the south main stationary storage/service tank