Violation Detail
Standard Cited: 19100036 G02 Design and construction requirements for exit routes.
Inspection Nr: 995257.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $5,000.00
Current Penalty: $0.00
Issuance Date: 01/13/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0214200
Contest Date: 02/04/2015
Final Order: 07/22/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/22/2015 | $0.00 | Serious | ||
Penalty | C: Contested | 02/06/2015 | $5,000.00 | Serious | ||
Penalty | Z: Issued | 01/13/2015 | $5,000.00 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.36(g)(2): Exit access(es) were not at least 28 inches (71.1 cm) wide at all points. a) Utility room (wastewater and DI water) for Clean Line area The exit route from the wastewater treatment area was reduced to 9 inches at one point by piping, plastic curtains and stored drums. Violation occurred on or about 11/20/14.