Violation Detail
Standard Cited: 19260451 F03 General requirements.
Inspection Nr: 1463209.015
Citation: 01001C
Citation Type: Serious
Abatement Date: 07/23/2020 2
Initial Penalty: $0.00
Current Penalty: $9,716.00
Issuance Date: 06/24/2020
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0636900
Contest Date: 07/21/2020
Final Order: 03/04/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/04/2022 | $9,716.00 | 07/23/2020 | Serious | |
Penalty | C: Contested | 08/10/2020 | $0.00 | 07/23/2020 | Serious | |
Penalty | Z: Issued | 06/24/2020 | $0.00 | 07/23/2020 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1926.451(f)(3): Scaffold and scaffold components were not inspected for visible defects by a competent person before each workshift and after any occurrence which could affect a scaffold's structural integrity: On or about February 13, 2020, and at times prior thereto, at the New Sherman High School Project, the employer did not ensure that all scaffolds were inspected for visible defects and all defects present on the scaffolds were corrected prior to allowing employees to work from the scaffold systems and platforms. The employees performing masonry activities were exposed to fall hazards of up to 18 feet to the concrete below.