Violation Detail
Standard Cited: 19260651 J02 Specific Excavation Requirements.
Inspection Nr: 1155243.015
Citation: 01002
Citation Type: Serious
Abatement Date: 12/28/2016 2
Initial Penalty: $12,470.00
Current Penalty: $7,480.00
Issuance Date: 11/08/2016
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0522000
Contest Date: 12/12/2016
Final Order: 11/07/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/07/2017 | $7,480.00 | 12/28/2016 | Serious | |
Penalty | C: Contested | 12/12/2016 | $12,470.00 | 12/28/2016 | Serious | |
Penalty | Z: Issued | 11/08/2016 | $12,470.00 | 12/28/2016 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.651(j)(2): Employees shall be protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. Protection shall be provided by placing and keeping such materials or equipment at least 2 feet (.61 m) from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary. a) On 15 June, 2016 the trench at Claxton Glenn did not have the spoil pile retained 2 feet back from the edge for approximately 60.