Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1197093.015
Citation: 01002
Citation Type: Serious
Abatement Date: 05/03/2017 4
Initial Penalty: $8,873.00
Current Penalty: $6,000.00
Issuance Date: 03/17/2017
Nr Instances: 2
Nr Exposed: 4
Related Event Code (REC): R
Gravity: 10
Report ID: 0213100
Contest Date: 04/10/2017
Final Order: 01/22/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/22/2018 | $6,000.00 | 05/03/2017 | Serious | |
Penalty | C: Contested | 04/13/2017 | $8,873.00 | 05/03/2017 | Serious | |
Penalty | Z: Issued | 03/17/2017 | $8,873.00 | 05/03/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Newman Box - On or about November 30, 2016, a periodic inspection of the energy control procedure for clearing a jam in the Newman Shaver 1 & 2 was last conducted in 2014. The procedure did not include controlling the hazardous energy of the Newman Log Feed Conveyor. b) Facility - On or about November 30, 2016, a periodic inspection of the energy control procedure for clearing a jam in the Inotech Shaver 1 & 2 was last conducted in 2014. The procedure did not include controlling the hazardous energy of the Inotech Log Feed Conveyor.