Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1204760.015
Citation: 01002
Citation Type: Other
Abatement Date: 08/09/2017 2
Initial Penalty: $5,975.00
Current Penalty: $3,883.75
Issuance Date: 07/14/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity:
Report ID: 0418200
Contest Date: 08/07/2017
Final Order: 07/09/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 07/09/2018 | $3,883.75 | 08/09/2017 | Other | |
Penalty | C: Contested | 08/13/2017 | $5,975.00 | 08/09/2017 | Serious | |
Penalty | Z: Issued | 07/14/2017 | $5,975.00 | 08/09/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
1910.36(d)(1): Employees must be able to open an exit route door from the inside at all times without keys, tools, or special knowledge. A device such as a panic bar that locks only from the outside is permitted on exit discharge doors. a. Ammonia charging area - On or about February 8, 2017 employees were exposed to the hazards of an ammonia release, in that an exit route was locked when employees were working/walking on the roof.