Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1303268.015
Citation: 01002
Citation Type: Serious
Abatement Date: 10/16/2018 2
Initial Penalty: $10,163.00
Current Penalty: $10,163.00
Issuance Date: 09/19/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0418200
Contest Date:
Final Order: 10/17/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/17/2018 | $10,163.00 | 10/16/2018 | Serious | |
Penalty | Z: Issued | 09/19/2018 | $10,163.00 | 10/16/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii)(B): Specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy; a) Airo Line, Lacom Machine: On or about March 28, 2018, employees were exposed to crushing and energy release hazards, in that; all sources of pneumatic and electrical power, were not listed and controlled in the lockout procedure when employees worked on the machine.