Violation Detail
Standard Cited: 19260451 G02 General requirements.
Inspection Nr: 1340176.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $9,282.00
Current Penalty: $5,000.00
Issuance Date: 02/15/2019
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0215800
Contest Date: 03/11/2019
Final Order: 09/04/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 09/04/2020 | $5,000.00 | Serious | ||
Penalty | C: Contested | 03/11/2019 | $9,282.00 | Serious | ||
Penalty | Z: Issued | 02/15/2019 | $9,282.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(g)(2): The employer did not provide fall protection for employees erecting or dismantling supported scaffolds. a) 115 Seneca St, Ithaca, NY, On or about 8/17/18: Employees were erecting tubular frame scaffolding at heights above 10 feet without using fall protection.