Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 1425262.015
Citation: 01002
Citation Type: Serious
Abatement Date: 12/04/2020 2
Initial Penalty: $13,494.00
Current Penalty: $11,400.00
Issuance Date: 02/14/2020
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 03/06/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/06/2020 | $11,400.00 | 12/04/2020 | Serious | |
Penalty | Z: Issued | 02/14/2020 | $13,494.00 | 03/12/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: (a) PRODUCTION AREA - Employees operating the King 100 vertical milling machine were exposed to hazards associated with the rotating table of the machine, and also the parts that were being set-up and run on the machine, on or about August 22, 2019. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.