Violation Detail
Standard Cited: 19100039 C01
Inspection Nr: 1570275.015
Citation: 01002
Citation Type: Serious
Abatement Date: 10/03/2022 2
Initial Penalty: $14,502.00
Current Penalty: $14,502.00
Issuance Date: 06/03/2022
Nr Instances: 1
Nr Exposed: 9
Related Event Code (REC): R
Gravity: 10
Report ID: 0626600
Contest Date:
Final Order: 07/15/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/15/2022 | $14,502.00 | 10/03/2022 | Serious | |
Penalty | Z: Issued | 06/03/2022 | $14,502.00 | 07/22/2022 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
1910.39(c)(1) A fire prevention plan did not include: A list of all major fire hazards, proper handling and storage procedures for hazardous materials, potential ignition sources and their control, and the type of fire protection equipment necessary to control each major hazard; On or about December 23, 2021, in the Hydro Desulfurization Unit (HDU-1), at ExxonMobil Refinery in Baytown, Texas, the employer did not identify and anticipate the potential for re-ignition following application of steam lances and select personal of personal protective equipment to be used by employees that would protect them against the potential for re-ignition while assessing a naphtha leak.