Violation Detail
Standard Cited: 19100119 C01 Process safety management of highly hazardous chemicals.
Inspection Nr: 1636921.015
Citation: 01002
Citation Type: Serious
Abatement Date: 07/05/2023
Initial Penalty: $6,250.00
Current Penalty: $6,250.00
Issuance Date: 05/31/2023
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 10
Report ID: 0419730
Contest Date: 06/27/2023
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 06/28/2023 | $6,250.00 | 07/05/2023 | Serious | |
Penalty | Z: Issued | 05/31/2023 | $6,250.00 | 07/05/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.119(c)(1): The employer did not develop a written plan of action regarding the implementation of employee participation: a.) At 901 Central Florida Parkway, Orlando, FL: On or about December 1, 2022, employees were exposed to explosion, deflagration, and fire hazards when assembling Hazard Division 1.3G and 1.4G explosives consisting of display fireworks and electric igniters (e-matches), in that a written program for employee participation in a PSM covered processes including, but not limited to, the "e-matching" assembly process had not been developed. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.