Standard Cited: 19260404 F06 Wiring design and protection.
Inspection Nr: 1241619.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 01/23/2019 3
Initial Penalty: $4,183.00
Current Penalty: $1,715.00
Issuance Date: 09/11/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0728900
Contest Date: 10/10/2017
Final Order: 09/07/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/07/2018 | $1,715.00 | 01/23/2019 | Serious | |
Penalty | C: Contested | 10/24/2017 | $4,183.00 | Serious | ||
Penalty | Z: Issued | 09/11/2017 | $4,183.00 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous: The employer is failing to protect employees from electric shock hazards while utilizing electric extension cords during construction activities on site. The employer is failing to ensure that the cords they are utilizing are properly grounded. This was most recently documented at the corner of 204th St. and Maple St., Elkhorn, Nebraska on or about June 21th, 2017 when the employees were using an extension cord on site that is missing the grounding prong.