Violation Detail
Standard Cited: 19100036 E02 Design and construction requirements for exit routes.
Inspection Nr: 961334.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 09/12/2014 2
Initial Penalty: $7,000.00
Current Penalty: $4,900.00
Issuance Date: 07/30/2014
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 10
Report ID: 0213600
Contest Date:
Final Order: 08/21/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/21/2014 | $4,900.00 | 09/12/2014 | Serious | |
Penalty | Z: Issued | 07/30/2014 | $7,000.00 | 09/12/2014 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.36(e)(2): The door(s) that connected any room to an exit route did not swing out in the direction of exit travel when the room was a high hazard area. a) On or about 03/05/14, at the main entrance of the Power and Boiler House Building, the marked emergency exit door did not swing out in the direction of exit travel. ABATEMENT DOCUMENTATION REQUIRED