Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1045930.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 11/15/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/15/2015
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0213600
Contest Date: 06/11/2015
Final Order: 01/11/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 01/11/2016 | $0.00 | 11/15/2015 | Serious | |
Penalty | C: Contested | 06/12/2015 | $0.00 | 06/19/2015 | Serious | |
Penalty | Z: Issued | 05/15/2015 | $0.00 | 06/19/2015 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Facility - On or about 3/11/15, employees are required to repair, service and maintain equipment, such as, but not limited to, the HD/VTS Trim Press (480V/60Hz/3phase; 110 psi). Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. ABATEMENT DOCUMENTATION REQUIRED