Violation Detail
Standard Cited: 19260416 A03 General requirements.
Inspection Nr: 1280695.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 03/28/2018 2
Initial Penalty: $9,054.00
Current Penalty: $0.00
Issuance Date: 03/08/2018
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0627510
Contest Date:
Final Order: 03/30/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/30/2018 | $0.00 | 03/28/2018 | Serious | |
Penalty | Z: Issued | 03/08/2018 | $9,054.00 | 03/28/2018 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.416(a)(3): Before work began, the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into pysical or electrical contact with the electric power circuit. Rover Petroleum, the Hoose Battery, Hoose #4 Ira, TX: On or about 22 September 2017, employees were exposed to electrical shock hazards while installing a new connection between an old power box and a new one on a commercial power distribution pole that had not been de-energized, nor had anyone in management verified with the power provider that the electrical power had been rerouted.