Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1293875.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 08/03/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/30/2018
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 5
Report ID: 0523400
Contest Date: 08/27/2018
Final Order: 12/21/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/21/2018 | $0.00 | 08/03/2018 | Serious | |
Penalty | C: Contested | 09/10/2018 | $0.00 | 08/03/2018 | Serious | |
Penalty | Z: Issued | 07/30/2018 | $0.00 | 08/03/2018 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed. (a) The employer did not conduct an annual or more frequent inspection of the energy control procedure by each authorized personnel to ensure that they were properly implemented during the repair and service work on the Magic Carpet lift (South) conveyors or other ski lift operations requiring LOTO.