Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1346216.015
Citation: 01003
Citation Type: Serious
Abatement Date: 06/18/2019 2
Initial Penalty: $3,978.00
Current Penalty: $2,955.00
Issuance Date: 03/07/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0111100
Contest Date: 03/29/2019
Final Order: 07/08/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/08/2019 | $2,955.00 | 06/18/2019 | Serious | |
Penalty | C: Contested | 04/08/2019 | $3,978.00 | 03/19/2019 | Serious | |
Penalty | Z: Issued | 03/07/2019 | $3,978.00 | 03/19/2019 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.850(a): Evidence in writing was not available that an engineering survey performed by a competent person had been performed prior to permitting employee(s) to start demolition operations: Barn - The employer did not ensure that a written engineering survey had been performed by a competent person prior to starting demolition operations.